| Comanche Circle | Sailfish Digital Ventures | Tolar | announced | 5000 MW |
| Data City, Texas | Energy Abundance Development Corporation | Laredo | planned | 5000 MW |
| Caldwell Valley Technology Park | Tract | Uhland | planned | 4000 MW |
| Alpha Digital Campus | PowerBridge (LandBridge land partner) | Orla | announced | 2000 MW |
| Alpha Digital Campus | PowerBridge LLC / LandBridge | Reeves | planned | 2000 MW |
| Microsoft Pecos Datacenter Campus | Microsoft | Pecos | planned | 2000 MW |
| PowerHouse + Provident Grand Prairie Campus | PowerHouse Data Centers (with Provident) | Grand Prairie | under construction | 1800 MW |
| PowerHouse Grand Prairie (PowerHouse/Provident DFW campus) | PowerHouse Data Centers | Grand Prairie | under construction | 1800 MW |
| South Dallas One | GridFree AI | Hillsboro | planned | 1500 MW |
| Core Scientific Pecos Campus Expansion | Core Scientific | Pecos | under construction | 1500 MW |
| Frontier (Stargate Shackelford County campus) | Vantage Data Centers | Shackelford | under construction | 1400 MW |
| Vantage Frontier Campus | Vantage Data Centers | Shackelford | under construction | 1400 MW |
| Sweetwater 1 Data Center | IREN | Sweetwater | under construction | 1400 MW |
| IREN Sweetwater 1 | IREN | Sweetwater | under construction | 1400 MW |
| Vantage Shackelford County (Frontier) | Vantage Data Centers | Shackelford County | under construction | 1400 MW |
| Project Aquila | RCM Hill, LLC | Hillsboro | planned | 1235 MW |
| AWS Project Spectrum (Glen Rose) | Amazon Web Services | Glen Rose | planned | 1200 MW |
| CloudBurst San Marcos Data Center I (Gigacenter) | CloudBurst Data Centers (built by Evolve) | San Marcos | under construction | 1200 MW |
| Crusoe Abilene (Lancium Clean Campus) | Crusoe | Abilene | under construction | 1200 MW |
| CloudBurst San Marcos Gigacenter (Data Center I) | CloudBurst Data Centers / Evolve | San Marcos | under construction | 1200 MW |
| CloudBurst San Marcos Campus | CloudBurst Data Centers | San Marcos | under construction | 1200 MW |
| West Texas AI Infrastructure Campus | Circe Energy | Permian Basin | announced | 1100 MW |
| Corsicana Facility | Riot Platforms, Inc. | Corsicana | operating | 1000 MW |
| ECL TerraSite-TX1 | ECL (EdgeCloudLink) | Houston | under construction | 1000 MW |
| Meta El Paso Data Center Campus | Meta (with BlackRock/AIP) | El Paso | under construction | 1000 MW |
| Crusoe Childress Campus | Crusoe | Childress | planned | 1000 MW |
| El Paso Data Center Campus | Meta | El Paso | under construction | 1000 MW |
| QTS / Lancium Clean Campus (Hall County) | QTS Data Centers (infrastructure by Lancium) | Turkey | announced | 1000 MW |
| Meta El Paso Data Center | Meta Platforms | El Paso | under construction | 1000 MW |
| Cipher Colchis Site | Cipher Mining | San Angelo | planned | 1000 MW |
| MARA Matagorda County Campus (HIF site) | MARA Holdings (with Starwood Digital Ventures) | Bay City | planned | 1000 MW |
| Meta El Paso Data Center Campus | Meta (JV with BlackRock) | El Paso | under construction | 1000 MW |
| Black Mountain Fort Worth Data Center | Black Mountain Energy | Fort Worth | planned | 980 MW |
| Waco Data Center Park | Infrakey DC Parks | Lacy Lakeview | planned | 925 MW |
| Lacy Lakeview Data District (L2D2) | Infrakey DC Parks | Lacy Lakeview | planned | 925 MW |
| Crusoe Abilene Second Campus | Crusoe | Abilene | planned | 900 MW |
| Big Rooter Power Energy & Data Campus | Panamint Capital | Bremond | under construction | 790 MW |
| CyrusOne Freestone Energy Center Campus | CyrusOne (with Constellation/Calpine) | Fairfield | under construction | 760 MW |
| IREN Childress Data Center | IREN | Childress | operating | 750 MW |
| Childress Data Center | IREN | Childress | operating | 750 MW |
| IREN Childress | IREN | Childress | operating | 750 MW |
| Applewhite Technology Park | Tract | San Antonio | planned | 720 MW |
| Riot Rockdale (AMD AI Lease) | Riot Platforms, Inc. | Rockdale | under construction | 700 MW |
| Rockdale Facility | Riot Platforms, Inc. | Rockdale | operating | 700 MW |
| Riot Rockdale | Riot Platforms | Rockdale | operating | 700 MW |
| Powerhouse DC Uhland | PowerHouse Data Centers | Uhland | planned | 700 MW |
| Riot Rockdale Facility | Riot Platforms | Rockdale | operating | 700 MW |
| Old Ocean Data Center | Nightpeak Energy | Sweeny | planned | 620 MW |
| Nexus Hubbard Campus | Nexus Data Centers | Hubbard | planned | 612 MW |
| CloudHQ San Antonio Campus | CloudHQ | San Antonio | planned | 600 MW |
| PowerCampus Austin | Skybox Datacenters | Pflugerville | planned | 600 MW |
| Riot Corsicana Project Ditto (HPC building) | Riot Platforms | Corsicana | planned | 600 MW |
| Prologis Power Campus Austin | Prologis | Hutto | under construction | 600 MW |
| Sweetwater 2 Data Center | IREN | Sweetwater | planned | 600 MW |
| Skybox San Angelo Campus | Skybox Datacenters (with Emergent) | San Angelo | planned | 600 MW |
| Skybox PowerCampus Austin | Skybox Datacenters (with Prologis) | Hutto | under construction | 600 MW |
| Nexus Apex Hubbard (DFW HB1) | Nexus Data Centers | Hubbard | under construction | 600 MW |
| IREN Sweetwater 2 | IREN | Sweetwater | under construction | 600 MW |
| Skybox San Angelo Campus | Skybox Datacenters | San Angelo | planned | 600 MW |
| PowerCampus Austin | Skybox Datacenters | Hutto | under construction | 600 MW |
| Rockdale (Texas) Data Center | Bitdeer Technologies Group | Rockdale | operating | 563 MW |
| Bitdeer Rockdale (Tydeer) | Bitdeer Technologies | Rockdale | operating | 563 MW |
| Bitdeer Rockdale Mining Datacenter | Bitdeer | Rockdale | operating | 563 MW |
| Yondr Lancaster Campus | Yondr Group | Lancaster | planned | 550 MW |
| Aligned Project Caprock (LBB-01) | Aligned Data Centers | Abernathy | under construction | 540 MW |
| Lincoln Red Oak Campus | Lincoln Rackhouse (land from Gigabit Fiber) | Red Oak | under construction | 540 MW |
| Lincoln Red Oak Campus | Lincoln Property Company | Red Oak | planned | 540 MW |
| Lincoln Property Dallas Data Center Campus | Lincoln Property Company | Dallas | announced | 540 MW |
| Aligned Project Caprock | Aligned Data Centers | Abernathy | under construction | 540 MW |
| Galaxy Helios Data Center Campus (Phase 2/3) | Galaxy Digital | Dickens | under construction | 526 MW |
| Medina Technology Park | Tract | Hondo | planned | 500 MW |
| Cipher Riesel Data Center | Cipher Mining | Riesel | planned | 500 MW |
| Beacon Point Campus | Hut 8 | Corpus Christi | under construction | 500 MW |
| Provident / PowerHouse Dallas-Fort Worth Campus | Provident Data Centers | Grand Prairie | under construction | 500 MW |
| Medina Technology Park | Tract | Castroville | planned | 500 MW |
| Pacifico Cedar Creek Data Center & Power Campus | Pacifico Energy | Cedar Creek | planned | 490 MW |
| DataBank Red Oak Campus | DataBank | Red Oak | under construction | 480 MW |
| DataBank Red Oak Campus (DFW9-16) | DataBank | Red Oak | under construction | 480 MW |
| Edged Energy Martindale Campus | Edged Energy | Martindale | under construction | 462 MW |
| Edged Martindale Campus | Edged Energy | Martindale | under construction | 462 MW |
| PowerPlay AI Abilene Data Center | PowerPlay AI / Sharon AI | Abilene | announced | 400 MW |
| Riot Corsicana Facility | Riot Platforms | Corsicana | operating | 400 MW |
| Prime Data Centers Austin (Maxwell) | Prime Data Centers | Maxwell | under construction | 384 MW |
| Highlander SM One | Highlander | San Marcos | planned | 380 MW |
| KDC Project Comal | KDC | Taylor | under construction | 360 MW |
| Palomino Alpha Data Center | Palomino Alpha, LLC | Zorn | planned | 360 MW |
| Palomino Alpha Data Center | Palomino | Zorn | planned | 360 MW |
| Hut 8 Beacon Point AI Data Center Campus | Hut 8 | Corpus Christi | under construction | 352 MW |
| Hut 8 Beacon Point | Hut 8 | Corpus Christi | under construction | 352 MW |
| Soluna Project Dorothy 3 | Soluna Holdings | Silverton | under construction | 300 MW |
| Cipher Barber Lake Site | Cipher Mining | Colorado City | planned | 300 MW |
| MARA Granbury | MARA Holdings | Granbury | operating | 300 MW |
| CleanSpark Sealy Campus | CleanSpark | Sealy | planned | 300 MW |
| Cinco | Rowan Digital Infrastructure | San Antonio | under construction | 300 MW |
| Project Temple | Rowan Digital Infrastructure | Temple | planned | 300 MW |
| Cipher Black Pearl Facility | Cipher Mining | Winkler County | under construction | 300 MW |
| Granbury Data Center | MARA Holdings, Inc. | Granbury | operating | 300 MW |
| Cipher Black Pearl | Cipher Mining | Wink | under construction | 300 MW |
| Rowan Project Temple | Rowan Digital Infrastructure | Temple | under construction | 300 MW |
| Project Dorothy 3 | Soluna Holdings, Inc. | Silverton | under construction | 300 MW |
| Cipher Barber Lake | Cipher Mining | Colorado City | under construction | 300 MW |
| Data City | Energy Abundance Development Corporation | Laredo | planned | 300 MW |
| MARA Granbury Facility | MARA Holdings | Granbury | operating | 300 MW |
| CleanSpark Brazoria Campus | CleanSpark | Brazoria | planned | 300 MW |
| PowerCampus Dallas | Skybox Datacenters | Lancaster | planned | 300 MW |
| PowerCampus Texas | Skybox Datacenters | Wichita Falls | planned | 300 MW |
| Prometheus Hyperscale Dallas Campus | Prometheus Hyperscale (with ENGIE / Conduit Power) | Dallas | announced | 300 MW |
| PowerHouse Circle T | PowerHouse Data Centers | Westlake | planned | 300 MW |
| CleanSpark Brazoria County AI/HPC Campus | CleanSpark | Angleton | announced | 300 MW |
| Peak Mining Corpus Christi (Site 2) | Northern Data | Corpus Christi | under construction | 300 MW |
| Peak Mining Corpus Christi (Site 1) | Northern Data | Corpus Christi | operating | 300 MW |
| CloudBurst Sweetwater Campus | CloudBurst Data Centers | Sweetwater | planned | 300 MW |
| Rowan Temple Data Center Campus | Rowan Digital Infrastructure | Temple | under construction | 300 MW |
| Laredo Behind-the-Meter Hydrogen Data Center | Green Hydrogen International | Laredo | planned | 300 MW |
| Hunt County AI Campus | Core Scientific | Greenville | planned | 285 MW |
| CleanSpark Austin County AI Campus | CleanSpark, Inc. | Bellville | under construction | 285 MW |
| Austin County Data Center Campus | CleanSpark, Inc. | Austin County | planned | 285 MW |
| King Mountain | Hut 8 | McCamey | operating | 280 MW |
| Helios Data Center Campus | Galaxy Digital | Dickens | operating | 260 MW |
| Galaxy Helios Data Center - Phase II/III Expansion (CoreWeave) | Galaxy Digital | Dickens | under construction | 260 MW |
| Texas Critical Data Centers (TCDC) - Ector County Campus | Texas Critical Data Centers (New Era Helium / Sharon AI JV) | Odessa | announced | 250 MW |
| Texas Critical Data Centers Odessa AI Campus | Texas Critical Data Centers (New Era Energy & Digital / Sharon AI) | Odessa | planned | 250 MW |
| Texas Critical Data Centers (Permian Basin AI/HPC campus) | Texas Critical Data Centers (New Era Helium / Sharon AI JV) | Odessa | planned | 250 MW |
| Crow Holdings / CleanArc Central Dallas Campus | CleanArc Data Centers (Crow Holdings site) | Dallas | planned | 245 MW |
| Stream DFW-C / Wilmer II (DFWC) | Stream Data Centers | Wilmer | under construction | 240 MW |
| Stream DFWC (Wilmer II) Campus | Stream Data Centers | Wilmer | under construction | 240 MW |
| EdgeConneX Cedar Creek Campus (EDCAUS02) | EdgeConneX | Cedar Creek | under construction | 240 MW |
| Stream Wilmer II (DFW C) | Stream Data Centers | Wilmer | planned | 240 MW |
| STACK South Dallas Campus | STACK Infrastructure | Wilmer | under construction | 220 MW |
| STACK South Dallas Campus (DFW2) | STACK Infrastructure | Lancaster | announced | 220 MW |
| Cipher Odessa Facility | Cipher Mining | Odessa | operating | 207 MW |
| Odessa Facility | Cipher Mining | Odessa | operating | 207 MW |
| Cipher Odessa | Cipher Mining | Odessa | operating | 207 MW |
| Lancium Clean Campus (Abilene) | Blue Owl/IPI | Abilene | under construction | 206 MW |
| Hut 8 Vega Data Center | Hut 8 | Vega | operating | 205 MW |
| Vega | Hut 8 | Vega | operating | 205 MW |
| Hut 8 Vega | Hut 8 | Vega | operating | 205 MW |
| Crusoe Abilene AI Data Center (Lancium Clean Campus) | Crusoe | Abilene | operating | 200 MW |
| Core Scientific Pecos (Cottonwood) | Core Scientific | Pecos | planned | 200 MW |
| PowerHouse Irving (Las Colinas) | PowerHouse Data Centers | Irving | under construction | 200 MW |
| Stream San Antonio III (SATB1) Campus | Stream Data Centers | San Antonio | under construction | 200 MW |
| Stream San Antonio III (SATB) | Stream Data Centers | San Antonio | under construction | 200 MW |
| Crusoe Nolan County Data Center | Crusoe | Sweetwater | planned | 200 MW |
| Meta Fort Worth Campus | Meta | Fort Worth | operating | 200 MW |
| Helios (Dickens County) | Argo Blockchain | Afton | operating | 200 MW |
| PowerHouse Irving | PowerHouse Data Centers | Irving | planned | 200 MW |
| Garden City Data Center | MARA Holdings, Inc. | Garden City | operating | 200 MW |
| MARA Garden City Facility | MARA Holdings | Garden City | operating | 200 MW |
| MARA Garden City | MARA Holdings | Garden City | operating | 200 MW |
| Edged Veale Ranch Fort Worth (Edged Energy Outpost) | Edged Data Centers (Endeavour) | Fort Worth | planned | 196 MW |
| DFW10 (Thad Hill Energy Center) | CyrusOne | Bosque | under construction | 190 MW |
| Soluna Project Rosa | Soluna Holdings | Harlingen | planned | 187 MW |
| North Texas Wind Farm Data Center (Hansford County) | MARA Holdings, Inc. | Hansford County | under construction | 180 MW |
| DataBank Red Oak Campus (DFW9-DFW11) | DataBank | Red Oak | under construction | 180 MW |
| Fluidstack Abernathy Campus (TeraWulf) | Fluidstack | Abernathy | under construction | 168 MW |
| TeraWulf / Fluidstack Abernathy Campus | TeraWulf (Fluidstack JV) | Abernathy | under construction | 168 MW |
| Abernathy HPC Campus | TeraWulf | Abernathy | under construction | 168 MW |
| QTS Dallas-Irving Data Center (DFW1) | QTS Data Centers | Irving | operating | 165 MW |
| QTS Irving 1 | QTS Data Centers | Irving | operating | 165 MW |
| Stream Project Saltworks (Graham) | Stream Data Centers | Graham | planned | 164 MW |
| FO Permian Partners Campus | FO Permian Partners | Midland | planned | 150 MW |
| 5CDC Dallas-Fort Worth DFW01 | 5C Data Centers | Fort Worth | under construction | 144 MW |
| Galaxy Helios Data Center Campus | Galaxy Digital | Dickens | operating | 133 MW |
| CoreWeave Helios (Galaxy Digital) | CoreWeave | Dickens | operating | 133 MW |
| Galaxy Helios Data Center Campus | Galaxy Digital | Dickens County | operating | 133 MW |
| Cormint Fort Stockton | Cormint Data Systems | Fort Stockton | operating | 130 MW |
| Fort Blocks | Cormint | Fort Stockton | operating | 130 MW |
| Flexential Talty Campus | Flexential | Talty | announced | 108 MW |
| Skybox Atlantic Station | Skybox Datacenters | Plano | operating | 100 MW |
| Pace Lone Star Project | Pace | Garden City | planned | 100 MW |
| Soluna Dorothy Data Center | Soluna | Silverton | operating | 98 MW |
| Vantage TX12 (San Antonio TX1 campus) | Vantage Data Centers | San Antonio | under construction | 96 MW |
| Vantage Data Centers TX12 | Vantage Data Centers | San Antonio | under construction | 96 MW |
| CyrusOne Houston (HOU3-4) | CyrusOne | Houston | operating | 91 MW |
| CyrusOne DFW1 | CyrusOne | Carrollton | operating | 90 MW |
| Stream DC DFW-VIII (Wilmer) | Stream Data Centers | Wilmer | operating | 90 MW |
| SDC Austin | Sabey Data Centers | Austin | operating | 84 MW |
| SDC Austin | Sabey Data Centers | Round Rock | operating | 84 MW |
| Sabey SDC Austin | Sabey Data Centers | Austin | operating | 84 MW |
| Project Kati 2 | Soluna Holdings, Inc. | Willacy | planned | 83 MW |
| Soluna Project Kati | Soluna Holdings | Raymondville | operating | 83 MW |
| Project Kati 1 | Soluna Holdings, Inc. | Willacy | under construction | 83 MW |
| DFW01 (Plano) | STACK Infrastructure | Plano | operating | 80 MW |
| Skybox Round Rock | Skybox Datacenters | Round Rock | under construction | 75 MW |
| Skybox Round Rock Data Center | Skybox Datacenters | Round Rock | planned | 75 MW |
| McGregor AI/HPC Data Center Campus | Galaxy Digital | McGregor | planned | 74 MW |
| Galaxy Project Merlin (McGregor) | Galaxy Digital | McGregor | planned | 74 MW |
| Fort Worth | QTS Data Centers | Fort Worth | operating | 70 MW |
| Core Scientific / CoreWeave Denton Expansion | Core Scientific (CoreWeave tenant) | Denton | under construction | 70 MW |
| Cipher Reveille | Cipher Mining | Cotulla | planned | 70 MW |
| DFW7 | CyrusOne | Fort Worth | under construction | 70 MW |
| Salt Creek | Hut 8 | Orla | operating | 63 MW |
| Salt Creek | Hut 8 | Orla | operating | 63 MW |
| Blueprint Taylor Data Center | Blueprint Data Centers | Taylor | under construction | 60 MW |
| Aligned DFW-01 | Aligned Data Centers | Plano | operating | 60 MW |
| DataBank DFW10 | DataBank | Red Oak | operating | 60 MW |
| DataBank DFW9 | DataBank | Red Oak | operating | 60 MW |
| DataBank DFW11 | DataBank | Red Oak | operating | 60 MW |
| Data Foundry Houston 2 | Data Foundry | Houston | operating | 60 MW |
| Element Critical Houston Two | Element Critical | Houston | under construction | 60 MW |
| DataBank DFW12 | DataBank | Red Oak | operating | 60 MW |
| Houston 2 | Vault Robotics | Houston | operating | 60 MW |
| Bobcat | Cormint | Orange Grove | under construction | 58 MW |
| Sabey SDC Austin Campus - Building B | Sabey Data Centers | Round Rock | under construction | 54 MW |
| Sabey SDC Austin Building B | Sabey Data Centers | Round Rock | under construction | 54 MW |
| Bitmain Rockdale | Bitmain | Rockdale | operating | 50 MW |
| Project Dorothy 1 (1A + 1B) | Soluna Holdings, Inc. | Silverton | operating | 50 MW |
| Soluna Project Dorothy 1 | Soluna Holdings | Silverton | operating | 50 MW |
| Soluna Project Dorothy 2 | Soluna Holdings | Silverton | operating | 48 MW |
| Digital Garland DFW40 | Digital Realty | Garland | under construction | 48 MW |
| Digital Realty Garland DFW37 | Digital Realty | Garland | under construction | 48 MW |
| CyrusOne HOU4 | CyrusOne | Houston | operating | 48 MW |
| Project Dorothy 2 | Soluna Holdings, Inc. | Silverton | operating | 48 MW |
| Stream Dallas DFWA1 (Garland) | Stream Data Centers | Garland | operating | 43 MW |
| CyrusOne HOU3 | CyrusOne | Houston | operating | 43 MW |
| Alborz Facility | Cipher Mining | Happy | operating | 40 MW |
| Element Critical Houston One | Element Critical | Houston | operating | 40 MW |
| Chief Facility | Cipher Mining | Andrews | operating | 40 MW |
| DataBank DFW8 | DataBank | Plano | operating | 40 MW |
| Bear Facility | Cipher Mining | Andrews | operating | 40 MW |
| Cipher Bear Facility | Cipher Mining | Andrews | operating | 40 MW |
| Data Foundry 02 | Data Foundry | Austin | operating | 36 MW |
| CyrusOne SAT6 (Texas Research Park) | CyrusOne | San Antonio | under construction | 36 MW |
| Dallas TX2 | NTT Global Data Centers | Garland | operating | 36 MW |
| Data Foundry 02 (Texas 2) | Vault Robotics | Austin | operating | 36 MW |
| CyrusOne AUS2-AUS3 | CyrusOne | Austin | operating | 33 MW |
| Skybox Austin I | Skybox Datacenters | Austin | operating | 30 MW |
| CoreWeave Plano | CoreWeave | Plano | operating | 30 MW |
| Corva Lubbock - Project Infrared | Corva | Lubbock | under construction | 27 MW |
| CyrusOne DFW2 | CyrusOne | Lewisville | operating | 26.5 MW |
| Skybox Houston I | Skybox Datacenters | Houston | operating | 26 MW |
| Skybox Houston One | Skybox Datacenters | Houston | operating | 26 MW |
| Blueprint Georgetown Data Center | Blueprint Data Centers | Georgetown | under construction | 25 MW |
| Snyder AI Campus (Crusoe Spark) | Energy Vault (for Crusoe Cloud) | Snyder | under construction | 25 MW |
| Edged Irving Building 2 | Edged Energy | Irving | under construction | 24 MW |
| TRG Houston Two (HOU2) | TRG Datacenters | Spring | under construction | 24 MW |
| Edged Dallas (Irving) | Edged Energy | Irving | operating | 24 MW |
| TRG Datacenters HOU2 | TRG Datacenters | Spring | under construction | 24 MW |
| T5@Dallas | T5 Data Centers | Plano | operating | 22.5 MW |
| Core Scientific Austin | Core Scientific | Austin | under construction | 20 MW |
| AIB Wise County Data Center | AIB Data Centers Inc. | Decatur | planned | 20 MW |
| Sangha Renewables West Texas (Ector County) | Sangha Renewables | Ector | operating | 19.9 MW |
| CyrusOne SAT5-SAT6 | CyrusOne | San Antonio | operating | 18 MW |
| Dallas - Plano Data Center | Flexential | Plano | operating | 18 MW |
| Dallas TX1 | NTT Global Data Centers | Garland | operating | 16 MW |
| DataBank HOU1 | DataBank | Houston | operating | 15.6 MW |
| AT&T Dallas DAL1 (Allen Internet Data Center) | AT&T | Allen | operating | 14 MW |
| Data Foundry 01 | Data Foundry | Austin | operating | 12 MW |
| DataBank DFW3 | DataBank | Plano | operating | 12 MW |
| Data Foundry 01 (Texas 1) | Vault Robotics | Austin | operating | 12 MW |
| DFW01-02 | Prime Data Centers | Dallas | under construction | 12 MW |
| Foundry Big Spring | Foundry | Big Spring | operating | 11 MW |
| Stream San Antonio II (SATA) | Stream Data Centers | San Antonio | operating | 10.8 MW |
| T5 @ Dallas III | T5 Data Centers | Plano | operating | 10.75 MW |
| Oracle Austin Data Center | Oracle | Austin | operating | 10 MW |
| Austin One | Element Critical | Austin | operating | 9.5 MW |
| Element Critical Austin | Element Critical | Austin | operating | 9.5 MW |
| DataBank HOU2 | DataBank | Houston | operating | 9 MW |
| CyrusOne SAT1 | CyrusOne | San Antonio | operating | 9 MW |
| DFW01-01 | Prime Data Centers | Dallas | operating | 8 MW |
| DataBank DFW1 | DataBank | Dallas | operating | 7 MW |
| Digital Realty 850 E. Collins Boulevard (DFW28) | Digital Realty | Richardson | operating | 6.8 MW |
| Downtown Dallas Data Center | Flexential | Dallas | operating | 6.66 MW |
| DataBank HOU3 | DataBank | Houston | operating | 6.5 MW |
| TRG HOU1 | TRG Datacenters | Spring | operating | 6 MW |
| TRG Houston One (HOU1) | TRG Datacenters | Spring | operating | 6 MW |
| DataBank HOU5 | DataBank | Houston | operating | 5.25 MW |
| Connect Temple | Oppidan | Temple | under construction | 5 MW |
| DataBank DFW2 | DataBank | Richardson | operating | 4.3 MW |
| DataBank DFW4 | DataBank | Dallas | operating | 4 MW |
| ColoHouse Dallas 1 | Hivelocity (formerly ColoHouse) | Dallas | operating | 4 MW |
| Dallas - Richardson Data Center | Flexential | Richardson | operating | 3.75 MW |
| 1547 McAllen (MCT-IX Annex) | fifteenfortyseven Critical Systems Realty | McAllen | planned | 3 MW |
| Alpha Data Center | M&A Technology | Dallas | operating | 2 MW |
| CoreSpace Dallas | CoreSpace | Dallas | operating | 2 MW |
| DataBank DFW5 (Dallas Infomart) | DataBank | Dallas | operating | 1.45 MW |
| DataBank DFW5 | DataBank | Dallas | operating | 1.3 MW |
| DataBank DFW7 | DataBank | Dallas | operating | 0.94 MW |
| DataBank ACT1 | DataBank | Waco | operating | 0.8 MW |
| DataBank DFW6 | DataBank | Dallas | operating | 0.675 MW |
| DataBank AUS1 | DataBank | Austin | operating | 0.405 MW |
| Texas A&M High Performance Research Computing (Grace/Faster/ACES) | Texas A&M University | College Station | operating | - |
| Prime Data Centers Dallas | Prime Data Centers | Dallas | operating | - |
| Core Scientific Austin 1 | Core Scientific | Austin | operating | - |
| H5 San Antonio | H5 Data Centers | San Antonio | operating | - |
| Cologix DAL1 | Cologix | Dallas | operating | - |
| LightEdge Lewisville Data Center | LightEdge Solutions | Lewisville | operating | - |
| Meta Temple Data Center | Meta | Temple | operating | - |
| TierPoint Dallas Data Center | TierPoint | Dallas | operating | - |
| Equinix DA1 | Equinix | Dallas | operating | - |
| Digital Realty DFW29 | Digital Realty | Richardson | operating | - |
| Aligned DFW-03 | Aligned Data Centers | Mansfield | operating | - |
| TRG Dallas | TRG Datacenters | Farmers Branch | operating | - |
| Hall County | QTS Data Centers | Turkey | under construction | - |
| Oracle Abilene AI Data Center | Oracle | Abilene | operating | - |
| Crusoe Nolan County Data Center Campus | Crusoe | Sweetwater | planned | - |
| Digital Realty DFW18 | Digital Realty | Richardson | operating | - |
| Irving | QTS Data Centers | Irving | operating | - |
| Amazon Web Services COPT Potranco | Amazon Web Services | San Antonio | under construction | - |
| Oracle Shackelford County AI Data Center | Oracle | Albany | under construction | - |
| CyrusOne DFW5 | CyrusOne | Allen | operating | - |
| Switch Rock Campus | Switch | Round Rock | under construction | - |
| CyrusOne AUS2 | CyrusOne | Austin | operating | - |
| CyrusOne AUS3 | CyrusOne | Austin | operating | - |
| Cipher Chief Facility | Cipher Mining | Andrews | operating | - |
| Aligned DFW-02 | Aligned Data Centers | Plano | operating | - |
| Aligned DFW-04 | Aligned Data Centers | Plano | operating | - |
| DAL1 | Hivelocity | Dallas | operating | - |
| Cisco Richardson Data Center | Cisco Systems | Richardson | operating | - |
| San Antonio | QTS Data Centers | San Antonio | operating | - |
| South Dallas | QTS Data Centers | Wilmer | operating | - |
| Dallas-Fort Worth (Red Oak) | Compass Datacenters | Red Oak | under construction | - |
| The Rock Campus | Switch | Austin | operating | - |
| DVSL ComputeCo Silverton hosting site (BitMine miners) | Bitmine Immersion Technologies | Silverton | operating | - |
| ExxonMobil Houston Campus Computing Facility | ExxonMobil | Spring | operating | - |
| Equinix DA3 | Equinix | Dallas | operating | - |
| Equinix DA4 | Equinix | Dallas | operating | - |
| Equinix DA6 | Equinix | Dallas | operating | - |
| Denton 1 | Core Scientific | Denton | operating | - |
| Equinix DA2 | Equinix | Dallas | operating | - |
| ROC Digital Pecos data center (BitMine immersion container) | Bitmine Immersion Technologies | Pecos | operating | - |
| Equinix DA7 | Equinix | Plano | operating | - |
| Equinix DA9 | Equinix | Irving | operating | - |
| 11:11 Systems Dallas Data Center | 11:11 Systems | Dallas | operating | - |
| Skybox Houston Two | Skybox Datacenters | Houston | planned | - |
| Howard County | QTS Data Centers | Big Spring | under construction | - |
| HTX1 | Serverfarm | Houston | operating | - |
| CTX2 | Serverfarm | Houston | operating | - |
| Dallas - Talty 1 Data Center | Flexential | Talty | under construction | - |
| LightEdge Austin Data Center | LightEdge Solutions | Austin | operating | - |
| 1301 Fannin | Netrality Data Centers | Houston | operating | - |
| EdgeConneX Houston | EdgeConneX | Houston | operating | - |
| EdgeConneX Austin | EdgeConneX | Austin | announced | - |
| Fort Worth DFW1 | CenterSquare | Fort Worth | operating | - |
| Allen DFW2 | CenterSquare | Allen | operating | - |
| Dallas DFW3 | CenterSquare | Dallas | operating | - |
| AUS01-02 | Prime Data Centers | Lockhart | planned | - |
| AUS01-03 | Prime Data Centers | Lockhart | planned | - |
| AUS01-05 | Prime Data Centers | Lockhart | planned | - |
| AUS01-06 | Prime Data Centers | Lockhart | planned | - |
| AUS01-07 | Prime Data Centers | Lockhart | planned | - |
| AUS01-08 | Prime Data Centers | Lockhart | planned | - |
| Digital Realty IAH10 | Digital Realty | Houston | operating | - |
| DAL2 | Cologix | Dallas | operating | - |
| DAL3 | Cologix | Dallas | operating | - |
| DFW02 (Lancaster) | STACK Infrastructure | Lancaster | planned | - |
| CyrusOne DFW3 | CyrusOne | Allen | operating | - |
| CyrusOne DFW4 | CyrusOne | Allen | operating | - |
| Digital Realty DFW28 | Digital Realty | Richardson | operating | - |
| CyrusOne SAT2 | CyrusOne | San Antonio | operating | - |
| CyrusOne SAT4 | CyrusOne | San Antonio | operating | - |
| Digital Realty DFW11 | Digital Realty | Carrollton | operating | - |
| Digital Realty DFW12 | Digital Realty | Carrollton | operating | - |
| Digital Realty DFW16 | Digital Realty | Richardson | operating | - |
| Aligned LBB-01 | Aligned Data Centers | Abernathy | under construction | - |
| Digital Realty DFW10 | Digital Realty | Dallas | operating | - |
| Digital Realty DFW25 | Digital Realty | Richardson | operating | - |
| Digital Realty DFW35 | Digital Realty | Richardson | operating | - |
| Digital Realty DFW36 | Digital Realty | Dallas | operating | - |
| Equinix HO1 | Equinix | Houston | operating | - |
| Dallas - Allen Data Center | TierPoint | Allen | operating | - |
| Dallas - Fort Worth Data Center | TierPoint | Fort Worth | operating | - |
| Equinix DA11 | Equinix | Dallas | operating | - |
| MCTX1 (McAllen, Chase Tower) | 1547 Critical Systems Realty | McAllen | operating | - |
| H5 San Antonio (100 Taylor) | H5 Data Centers | San Antonio | operating | - |
| Austin 1 | Core Scientific | Austin | operating | - |
| Cottonwood Campus (Pecos) | Core Scientific | Pecos | operating | - |
| AWS Bitter Blue Data Center (Donop Road) | Amazon Web Services | San Antonio | planned | - |
| AWS NW Crossroads Data Center (West Side) | Amazon Web Services | San Antonio | planned | - |
| CyrusOne Austin I | CyrusOne | Austin | operating | - |
| Aligned DFW-01 | Aligned Data Centers | Plano | operating | - |
| Lambda Plano (Aligned DFW-04) | Lambda | Plano | under construction | - |
| Lambda Allen Colocation | Lambda | Allen | operating | - |
| Digital Realty AUS11 | Digital Realty Trust | Austin | operating | - |
| Stargate I (Abilene AI data center campus) | Crusoe / Oracle / OpenAI (Stargate) | Abilene | under construction | - |
| Stargate Milam County (SB Energy fast-build site) | SB Energy / SoftBank (Stargate) | Milam | planned | - |
| Google Armstrong County AI Data Center | Google | Armstrong | announced | - |
| LightWave Networks Dallas | LightWave Networks | Carrollton | operating | - |
| Yondr Lancaster Data Center Campus | Yondr Group | Lancaster | planned | - |
| AUS01-01 | Prime Data Centers | Lockhart | planned | - |
| AUS01-04 | Prime Data Centers | Lockhart | planned | - |
| Digital Realty AUS1 | Digital Realty | Austin | operating | - |
| Google Haskell County AI Data Center Hub | Google | Haskell | announced | - |
| Prologis Power Campus | Prologis | Austin | under construction | - |
| AWS Boling / Wharton County Campus (Project Eagle) | Amazon Web Services | Boling | planned | - |
| Aligned Plano DFW04 | Aligned Data Centers | Plano | under construction | - |
| Microsoft San Antonio SAT16 Data Center | Microsoft (Azure) | San Antonio | under construction | - |
| Microsoft West Texas (Pecos) Data Center | Microsoft (power by Chevron / Energy Forge One) | Pecos | announced | - |
| Skybox Austin | Skybox Datacenters | Austin | operating | - |
| 1547 McAllen (MCTX1, Chase Tower) | 1547 Critical Systems Realty | McAllen | operating | - |
| Texas Advanced Computing Center | University of Texas at Austin | Austin | operating | - |
| HorizonIQ Dallas (US-South Central) | HorizonIQ | Plano | operating | - |
| ScaleMatrix US-SOUTH 01 | ScaleMatrix | Dallas | operating | - |
| Defense Enterprise Computing Center San Antonio | Defense Information Systems Agency | San Antonio | operating | - |
| Lincoln Rackhouse Plano | Lincoln Property Company (Lincoln Rackhouse) | Plano | operating | - |
| RELLIS Campus Data and Research Center | ThisWay Global (RELLIS Campus Data and Research Center LLC) | Bryan | under construction | - |
| Stargate Milam County Campus | SoftBank | Milam | planned | - |
| Riot Corsicana Facility - AI/HPC Conversion | Riot Platforms | Corsicana | announced | - |
| Compass Red Oak Campus (830-acre) | Compass Datacenters | Red Oak | planned | - |
| Switch Austin (The Rock) | Switch | Round Rock | operating | - |
| Stream San Antonio II | Stream Data Centers | San Antonio | operating | - |
| Kahla Project | Belltown Power | Marquez | planned | - |
| CyrusOne SAT5 | CyrusOne | San Antonio | operating | - |
| DFW2 DC2 | QTS Data Centers | Wilmer | under construction | - |
| DFW2 DC3 | QTS Data Centers | Wilmer | under construction | - |
| PowerHouse/Provident Grand Prairie Hyperscale Campus | PowerHouse Data Centers / Provident Data Centers | Grand Prairie | under construction | - |
| PowerHouse Caldwell Valley Data Center | PowerHouse Data Centers | Uhland | planned | - |
| Crusoe Abilene II AI Factory Campus (Microsoft) | Crusoe | Abilene | under construction | - |
| Microsoft Medina County / Castroville Campus (SAT82 et al.) | Microsoft | Castroville | under construction | - |
| Microsoft Pecos Datacenter | Microsoft | Pecos | announced | - |
| Stream Houston - Woodlands | Stream Data Centers | The Woodlands | operating | - |
| Cipher Reveille Data Center | Cipher Mining | Cotulla | under construction | - |
| CoreWeave Plano (US Central) | CoreWeave | Plano | operating | - |
| Core Scientific Pecos - HPC/AI Conversion | Core Scientific | Pecos | planned | - |
| Cisco Allen Data Center (Metro Virtual Data Center) | Cisco Systems | Allen | operating | - |
| Chevron Houston Data Center | Chevron Corporation | Houston | operating | - |
| Dell Technologies Round Rock Data Center | Dell Technologies | Round Rock | operating | - |
| PepsiCo Plano Data Center | PepsiCo | Plano | operating | - |
| QTS San Antonio 2 Campus | QTS Data Centers | San Antonio | operating | - |
| Lambda Allen | Lambda | Allen | operating | - |
| RELLIS Campus Data Center | ThisWay Global, Inc. | Bryan | under construction | - |
| TX1 Disaster Recovery Data Center | Oklahoma Office of Management and Enterprise Services (OMES) | Garland | operating | - |
| Digital Realty DFW26 | Digital Realty | Lewisville | operating | - |
| CyrusOne SAT6 | CyrusOne | San Antonio | operating | - |
| 365 Data Centers Richardson | 365 Data Centers | Richardson | operating | - |
| CyrusOne SAT3 | CyrusOne | San Antonio | operating | - |
| Skybox Wichita Falls Power Campus | Skybox Datacenters | Wichita Falls | announced | - |
| Riot Rockdale Campus - AI/HPC Data Center (AMD anchor) | Riot Platforms | Rockdale | under construction | - |
| DFW-04 (Lambda AI cloud) | Aligned Data Centers | Plano | under construction | - |
| Prime DFW04 (Fort Worth Campus) | Prime Data Centers | Fort Worth | under construction | - |
| MARA Matagorda County Digital Infrastructure Campus | MARA Holdings | Matagorda | announced | - |
| Red Oak campus expansion (buildings 6-8) | Compass Datacenters | Red Oak | planned | - |
| IREN Sweetwater AI Campus (Sweetwater 1 & 2) | IREN | Sweetwater | under construction | - |
| EdgeConneX Cedar Creek Campus (AUS02) | EdgeConneX | Cedar Creek | under construction | - |
| NTT Dallas TX4 Data Center | NTT Global Data Centers | Garland | under construction | - |
| Equinix DA12 | Equinix | Dallas | under construction | - |
| Skybox PowerCampus Wichita Falls | Skybox Datacenters | Wichita Falls | announced | - |
| PowerHouse Irving-Las Colinas Campus | PowerHouse Data Centers | Irving | planned | - |
| EdgeConneX Second Bastrop County Campus | EdgeConneX | Cedar Creek | announced | - |
| T5 AllianceTexas Data Center Campus | T5 Data Centers (with Hillwood / IPI) | Fort Worth | announced | - |
| Data Foundry 00 (Austin 1) | Vault Robotics | Austin | operating | - |
| Pampa Data Center | Google | Pampa | announced | - |
| Wilbarger County Data Center | Google | Vernon | announced | - |
| Microsoft San Antonio SAT82 (FM 471 N) | Microsoft | Castroville | under construction | - |
| Microsoft San Antonio SAT89/SAT90 (US Hwy 90 W) | Microsoft | Castroville | under construction | - |
| Microsoft San Antonio SAT15 (Westover Link) | Microsoft | San Antonio | operating | - |
| Microsoft San Antonio SAT46 (Texas Research Park / Lambda Drive) | Microsoft | San Antonio | operating | - |
| Red Oak Data Center | Google | Red Oak | under construction | - |
| Midlothian Data Center | Google | Midlothian | operating | - |
| Stargate Shackelford County (Oracle) | Oracle | Shackelford County | under construction | - |
| Microsoft San Antonio SAT80/SAT81 (FM 1957 Campus) | Microsoft | Castroville | operating | - |
| Prime Data Centers Project Snow (AUS01 / AUS02) | Prime Data Centers | Lockhart | under construction | - |
| BPP Projects Taylor Data Center (Project Sam) | BPP Projects | Taylor | planned | - |
| South Creek Ranch Data Center Park | Cawley Partners | Ferris | planned | - |
| Provident Data Centers Hillsboro Campus | Provident Realty Advisors | Hillsboro | planned | - |
| Vantage TX22 (San Antonio) | Vantage Data Centers | San Antonio | under construction | - |
| Voltage Park Fort Worth | Voltage Park | Fort Worth | operating | - |
| Voltage Park Allen | Voltage Park | Allen | operating | - |
| Cerebras Dallas | Cerebras Systems | Dallas | operating | - |
| Groq Dallas (Equinix) | Groq | Dallas | operating | - |
| Groq Houston (DataBank) | Groq | Houston | operating | - |
| QTS South Dallas DC2 & DC3 (Wilmer) | QTS Data Centers | Wilmer | under construction | - |
| LS Power Delta County Data Center | LS Power | Cooper | planned | - |
| Bon Wier Innovation Park (Clean Holding) | Clean Holding Company | Bon Wier | planned | - |
| Duos Edge AI Victoria Data Center | Duos Edge AI | Victoria | planned | - |
| Crusoe Goodnight Campus | Crusoe | Goodnight | under construction | - |
| Crusoe Childress AI Data Center Campus | Crusoe | Childress | planned | - |
| AWS Horizon Junction | Amazon Web Services | Fort Stockton | under construction | - |
| AWS Project Eagle (Boling) | Amazon Web Services | Boling | under construction | - |
| BBT Midland 1 | Big Bend Telecom | Midland | under construction | - |
| QTS Big Spring (Elbow Creek) | QTS Data Centers | Big Spring | announced | - |
| AmpZ Lufkin Data Center | AmpZ Champion Data Center Holdings | Lufkin | planned | - |
| AWS Creekside Campus (Bastrop County) | Amazon Web Services | Cedar Creek | planned | - |
| Google Wilbarger County Data Center (Project Rise) | Google (with AES) | Vernon | announced | - |
| Google Haskell County Data Center Hub | Google | Haskell | announced | - |
| Project Patriot | Bilateral Energy LLC | Granbury | planned | - |
| BT Gateway Data Center | Belltown Power (BT Gateway LLC) | Royse City | under construction | - |
| Misae Energy Hub | Misae Investments | Stockdale | planned | - |
| Lambda Dallas / DFW-04 (Aligned, Plano) | Lambda | Plano | under construction | - |
| Hillsboro Campus | Provident Data Centers | Hillsboro | planned | - |
| Project Big Pine | Potentia Development (host: TexAmericas Center) | Texarkana | announced | - |
| Vulcan Core Tyler Data Center | Vulcan Core | Tyler | planned | - |
| Vultr Dallas Cloud Region | Vultr | Dallas | operating | - |
| Denvr Dataworks HOU1 (US South) | Denvr Dataworks | Houston | operating | - |
| Nscale Cedarvale Data Center (Ionic Digital lease) | Nscale | Barstow | under construction | - |
| San Angelo Data Center | Texas Department of Information Resources | San Angelo | operating | - |
| EdgeConneX Cedar Creek Campus | EdgeConneX | Cedar Creek | under construction | - |
| Amazon Web Services Bitter Blue Campus - Building B | Amazon Web Services | Elmendorf | under construction | - |
| MCA1 | MDC Data Centers | McAllen | operating | - |
| Austin Data Center | Texas Department of Information Resources | Austin | operating | - |
| Microsoft Pecos (Reeves County) Data Center Campus | Microsoft | Pecos | planned | - |
| MCA2 | MDC Data Centers | McAllen | operating | - |
| Laredo Data Center | MDC Data Centers | Laredo | operating | - |
| EGP1 | MDC Data Centers | Eagle Pass | operating | - |
| Brownsville Data Center | MDC Data Centers | Brownsville | planned | - |
| El Paso Data Center | MDC Data Centers | El Paso | operating | - |
| Microsoft San Antonio SAT16 | Microsoft | San Antonio | planned | - |
| Dallas (Plano) | HorizonIQ | Plano | operating | - |
| Compass Red Oak Campus Expansion (buildings 6-8) | Compass Datacenters | Red Oak | planned | - |
| Dallas TX3 | NTT Global Data Centers | Garland | under construction | - |
| Dallas Data Center | Consolidated Communications | Dallas | operating | - |
| QTS Fort Worth Data Center Campus | QTS Data Centers | Fort Worth | under construction | - |
| TACC J.J. Pickle Research Campus Data Center (Frontera) | Texas Advanced Computing Center (UT Austin) | Austin | operating | - |
| West Campus Data Center (Grace / FASTER / VISION) | Texas A&M University (High Performance Research Computing) | College Station | operating | - |
| Google Midlothian Data Center (5th building) | Google | Midlothian | planned | - |
| Sabey Data Center San Marcos | Sabey Data Centers | San Marcos | planned | - |
| Comanche Circle (Project Patriot) | Sailfish Development | Granbury | planned | - |
| Duos Edge AI Amarillo EDC-2 | Duos Edge AI | Amarillo | under construction | - |
| AmpZ Project LufKin (Southland Paper Mill) | AmpZ Champion Data Center Holdings | Lufkin | planned | - |
| Barrio Resources Tyler Data Center | Barrio Resources LLC | Tyler | planned | - |
| Serverfarm HTX2 | Serverfarm | Hockley | under construction | - |
| Horizon at Sabey Data Center Round Rock | Texas Advanced Computing Center (UT Austin) | Round Rock | under construction | - |
| Duos Edge AI Corpus Christi Data Centers | Duos Edge AI | Corpus Christi | under construction | - |
| King Mountain (JV) | Hut 8 | McCamey | operating | - |
| IBM Cloud Dallas Multi-Zone Region (us-south) | IBM | Dallas | operating | - |
| Crusoe Goodnight Campus | Crusoe | Goodnight | planned | - |
| Vantage Data Centers TX22 | Vantage Data Centers | San Antonio | planned | - |
| Rhodium Temple | Rhodium Enterprises | Temple | operating | - |
| Rowan Project Stampede | Rowan Digital Infrastructure | Temple | planned | - |
| Rowan Project Ranger | Rowan Digital Infrastructure | Temple | planned | - |
| Riot Corsicana - Project Ditto | Riot Platforms | Corsicana | under construction | - |
| Black Mountain Energy Fort Worth Data Center | Black Mountain Energy | Fort Worth | planned | - |
| Project Comal (KDC six data centers) | KDC Real Estate | Taylor | planned | - |
| AWS San Antonio ALE062 | Amazon Web Services | San Antonio | under construction | - |
| CoreWeave / Core Scientific Cottonwood (Pecos) HPC Data Center | CoreWeave | Pecos | under construction | - |
| Tract Data Center Technology Park (Caldwell Valley) | Tract | Uhland | under construction | - |
| CyrusOne Wise/Jack County Campus (TX-199) | CyrusOne | Bridgeport | planned | - |
| Colovore Hutto - Project Raptor | Colovore | Hutto | under construction | - |
| Iron Mountain Hutto Hyperscale | Iron Mountain | Hutto | planned | - |
| Tract San Antonio Data Center Campuses (3 sites) | Tract | San Antonio | announced | - |
| AWS Hood County Campus (Project Spectrum) | Amazon Web Services | Granbury | planned | - |
| Colovore AUS01 | Colovore | Hutto | under construction | - |
| Colovore DFW01 | Colovore | Mesquite | under construction | - |
| Colovore DFW02 | Colovore | Fort Worth | under construction | - |
| Hivelocity DAL2 | Hivelocity | Dallas | operating | - |
| ManeFrame III (SMU University Data Center) | Southern Methodist University | Dallas | operating | - |
| Digital Realty DFW17 | Digital Realty | Richardson | operating | - |
| Texas Consolidated Data Center - Austin | Texas Department of Information Resources | Austin | operating | - |
| Texas Consolidated Data Center - San Angelo | Texas Department of Information Resources | San Angelo | operating | - |
| CoreWeave Austin (Core Scientific) | CoreWeave | Austin | operating | - |
| Lumen El Paso 1 | Lumen Technologies | El Paso | operating | - |
| Meta El Paso Campus | Meta | El Paso | under construction | - |
| TCU Advanced Computing Center (TCUACC) | Texas Christian University | Fort Worth | operating | - |
| Edged Fort Worth (Veale Ranch) | Edged Energy | Fort Worth | planned | - |
| Rice University NOTS Cluster (Center for Research Computing) | Rice University | Houston | operating | - |
| Research Computing Data Core (Carya Cluster) | University of Houston | Houston | operating | - |
| High Performance Computing Center (Experimental Sciences Building I) | Texas Tech University | Lubbock | operating | - |
| Southwest Airlines Data Center | Southwest Airlines | Dallas | operating | - |
| Charles Schwab Data Center | Charles Schwab | Denton | operating | - |
| HPRC West Campus Data Center (Grace Cluster) | Texas A&M University | College Station | operating | - |
| Baylor University Kodiak Cluster | Baylor University | Waco | operating | - |
| Saxet Energy Park | Sabre56 | Corpus Christi | under construction | - |
| USAA San Antonio Data Center | USAA | San Antonio | operating | - |
| VA Austin Information Technology Center (AITC) | US Department of Veterans Affairs | Austin | operating | - |
| Lancium Clean Campus Abilene | Lancium | Abilene | under construction | - |
| Citi Georgetown Data Center | Citigroup | Georgetown | operating | - |
| Home Depot Austin Technology Center | The Home Depot | Austin | operating | - |
| Citi South West Data Center | Citigroup | Roanoke | operating | - |
| Windstream Houston Data Center | Windstream | Houston | operating | - |
| Comcast Willis Data Center | Comcast | Willis | planned | - |
| American Tower Access Edge Austin | American Tower | Austin | operating | - |
| Texas Advanced Computing Center (Frontera/Stampede3/Vista) | Texas Advanced Computing Center | Austin | operating | - |
| Provident / PowerHouse Grand Prairie Campus | Provident Data Centers | Grand Prairie | announced | - |
| Riot Corsicana | Riot Platforms | Corsicana | operating | - |
| Netrality 1301 Fannin | Netrality Data Centers | Houston | operating | - |
| Reveille Site | Cipher Mining | Cotulla | planned | - |
| Aligned DFW-01 | Aligned Data Centers | Plano | operating | - |
| Meta Fort Worth Data Center | Meta | Fort Worth | operating | - |
| Prime Data Centers Austin | Prime Data Centers | Austin | operating | - |