DEPLOY

Data center facility

AUS01-08

Prime Data Centers · Lockhart · 3300 FM 2720, Lockhart, TX. Every figure below is individually sourced and dated.


In clusterCaldwell(14)·Texas(607)

Facility record

planned

Status

hyperscale

Type

Lockhart

Location

250,000 sqft

Building

Bluebonnet Electric Cooperative

Serving utility

On the data center map

Free to use on your site, with a link back to DEPLOY.

Construction evidence

Dated satellite imagery of the site itself, oldest to newest. This is what the campus looks like from orbit over time, not a status we recorded: bare land, grading, and building mass tell their own story. Sentinel-2 true color, 10 m resolution, cloud-free scenes; it shows site-scale change, not fine detail. Click any frame to expand it.

2018-07-01Contains modified Copernicus Sentinel data 2018
2020-08-14Contains modified Copernicus Sentinel data 2020
2022-06-25Contains modified Copernicus Sentinel data 2022
2024-08-21Contains modified Copernicus Sentinel data 2024
2025-09-10Contains modified Copernicus Sentinel data 2025

Dated Sentinel-2 imagery, gated to hand-verified site coordinates. How we source and verify it: satellite construction evidence.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • building sqft: 250,000 sq ft (reported) · source
  • record: AUS01-08 (reported) · source
  • servingUtility: Bluebonnet Electric Cooperative (reported) · source
  • status: development (planned) (reported) · source
  • streetAddress: 3300 FM 2720, Lockhart, TX (reported) · source · shared AUS01 campus address (8 buildings on one Lockhart megacampus)

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Sep 2026
    Current: planned

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is AUS01-08?
AUS01-08 is a data center facility record on the DEPLOY registry, in Lockhart. Every fact on the record is individually sourced and dated.
Who operates AUS01-08?
Prime Data Centers operates AUS01-08, per the sourced record on the DEPLOY registry.
Is AUS01-08 operating?
AUS01-08 is recorded as planned on the DEPLOY registry. Each figure traces to a source.
How verified is the data on AUS01-08?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track AUS01-08 on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). AUS01-08: data center facility record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/facilities/prime-aus01-08-lockhart-tx

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces