Data center facility

Midlothian Data Center

Google · Midlothian. Every figure below is individually sourced and dated.


Part of the tracked campus Google Midlothian Campus (Alamo Mission).

The story of Midlothian Data Centerinherited from campus Google Midlothian Campus (Alamo Mission)
Announced capex
$880M

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterTexas(607)

The deal

Inherited from campus Google Midlothian Campus (Alamo Mission).

developer
Google · Via Alamo Mission LLC shell
operator
Google
developer
Alamo Mission LLC · Google development/shell entity (project code name 'Sharka') used to acquire Midlothian/Ellis County land and file permits at 3441 Railport Parkway

Financial structure

Inherited from campus Google Midlothian Campus (Alamo Mission).

Sharka Building 5 (fifth Midlothian data center)
$880M. One-story, 288,000 sq ft data center at 3441 Railport Parkway; TDLR project registered Dec 8, 2025 (estimates subject to change) journalist report

Investment, workforce and specs

Inherited from campus Google Midlothian Campus (Alamo Mission).

Capex
Fifth data center building (project Sharka), 288,000 sq ft source

Power

Inherited from campus Google Midlothian Campus (Alamo Mission). Live grid demand and drought overlay only render on the campus page.

Power source
grid
Grid operator
ERCOT
Interconnection

Facility record

operating

Status

hyperscale

Type

Google

Operator

Midlothian

Location

2019

Operational

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • record: Midlothian Data Center (reported) · source
  • status: operating (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Sep 2026
    Current: operating

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Midlothian Data Center?
Midlothian Data Center is a data center facility record on the DEPLOY registry, in Midlothian. Every fact on the record is individually sourced and dated.
Who operates Midlothian Data Center?
Google operates Midlothian Data Center, per the sourced record on the DEPLOY registry.
Is Midlothian Data Center operating?
Midlothian Data Center is recorded as operating on the DEPLOY registry. Each figure traces to a source.
How verified is the data on Midlothian Data Center?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Midlothian Data Center on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). Midlothian Data Center: data center facility record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/facilities/google-midlothian-tx

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces