Data center facility
Vantage Data Centers TX22
Vantage Data Centers · San Antonio · 5207 Rogers Road, San Antonio, TX. Every figure below is individually sourced and dated.
Part of the tracked campus Vantage TX1 San Antonio Campus.
- Announced capex
- $448M
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterTexas(607)
The deal
Inherited from campus Vantage TX1 San Antonio Campus.
- utility
- VoltaGrid · On-site gas generation operator
- developer
- Vantage Data Centers · DigitalBridge-backed
- utility
- Bandera Electric Cooperative · Local electric distribution utility listed for the Rogers Rd (TX2) site (not CPS Energy).
Financial structure
Inherited from campus Vantage TX1 San Antonio Campus.
- Omicron campus investment
- $448M. Described as Vantage's record Bexar County investment; >$1B combined registered along the Omicron corridor since 2020 (corridor-level). journalist report
Power
Inherited from campus Vantage TX1 San Antonio Campus. Live grid demand and drought overlay only render on the campus page.
- Power source
- mixed
- Grid operator
- ERCOT
- Interconnection
VoltaGrid on-site gas generation (Vantage SA), 0.42 GW gas, Under construction. ~423 MW dedicated generation across two Vantage SA sites
VoltaGrid on-site natural-gas prime power (San Antonio), 0.42 GW gas, Partially energized. ~423 MW dedicated prime natural-gas generation across two Vantage SA sites combined (one operating, one under construction); ~151 diesel backup generators; TCEQ minor-source permits expanding from 22 to 80+.
Facility record
On the data center map
Construction evidence
Dated satellite imagery of the site itself, oldest to newest, with the campus milestones that landed in each window. This is what the site looked like from orbit while announcements, permits, and energizations were dated into our ledger, so bare land, grading, and building mass tell their own story alongside the paper trail. Sentinel-2 true color, 10 m resolution, cloud-free scenes; click any frame to expand it.
Dated Sentinel-2 imagery, gated to hand-verified site coordinates. Milestones inherited from campus Vantage TX1 San Antonio Campus. How we source and verify it: satellite construction evidence.
Evidence
Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.
Timeline
- Aug 2026First recordedAdded to the DEPLOY registry as a sourced facility record
- Sep 2026Current: planned
Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.
Common questions
What is Vantage Data Centers TX22?
Who operates Vantage Data Centers TX22?
Is Vantage Data Centers TX22 operating?
How verified is the data on Vantage Data Centers TX22?
Deploy Watch
Track Vantage Data Centers TX22 on Deploy.
We notify you when operating status, capacity, or the operator changes against a sourced record.
Cite this page
DEPLOY. (2026). Vantage Data Centers TX22: data center facility record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/facilities/vantage-tx22-san-antonio-bexar-tx
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/facilities/vantage-tx22-san-antonio-bexar-tx.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/facilities/vantage-tx22-san-antonio-bexar-tx
- Data documentation: /data
- Query this programmatically: Deploy MCP