Data center facility
Oracle Abilene AI Data Center
Oracle · Abilene. Every figure below is individually sourced and dated.
Part of the tracked campus Stargate Abilene.
- Announced capex
- $15B
- Grid
- ERCOT · Grid connected, with on-site generation alongside: power comes from a mix of on-site natural gas and grid supply that includes local West Texas wind. As of April 2026 about 0.3 GW was operational against a planned 1.2 GW, so most of the campus is not yet energised.
- GPUs
- 450K 450,000 GB200
- Tenant
- OpenAI
- Land owner
- Lancium
- Cost per MW
- $13M/MW
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterTexas(607)
The deal
Inherited from campus Stargate Abilene.
Financial structure
Inherited from campus Stargate Abilene.
- Total JV capital for 1.2 GW Abilene campus
- $15B. Crusoe / Blue Owl joint venture; eight buildings journalist report
- Phase-2 debt and equity financing (six buildings)
- $11.6B. Managed by Blue Owl's Real Assets platform with Primary Digital Infrastructure journalist report
- First-phase construction loan
- $7.1B. Initial construction loan for the first two buildings journalist report
Investment, workforce and specs
Inherited from campus Stargate Abilene.
- GPUs
- 450,000 GB200 source
Power
Inherited from campus Stargate Abilene. Live grid demand and drought overlay only render on the campus page.
- Power source
- mixed
- Grid operator
- ERCOT
- Interconnection
- Grid connected, with on-site generation alongside: power comes from a mix of on-site natural gas and grid supply that includes local West Texas wind. As of April 2026 about 0.3 GW was operational against a planned 1.2 GW, so most of the campus is not yet energised.
- Water
- Closed-loop, direct-to-chip water cooling with near-zero evaporation; Abilene's mayor stated the site uses roughly 10 million gallons/year, against the city's 21 to 24 million gallons/day.
On-site behind-the-meter natural gas generation, 0.36 GW gas, Partially energized. ~360 MW across ten simple-cycle turbines (some GE Vernova), permitted for onsite/data-center use only; behind-the-meter while ERCOT interconnection is built. Site went live Sept 2025.
Facility record
On the data center map
Evidence
Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.
Timeline
- Aug 2026First recordedAdded to the DEPLOY registry as a sourced facility record
- Sep 2026Current: operating
Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.
Common questions
What is Oracle Abilene AI Data Center?
Who operates Oracle Abilene AI Data Center?
Is Oracle Abilene AI Data Center operating?
How verified is the data on Oracle Abilene AI Data Center?
Deploy Watch
Track Oracle Abilene AI Data Center on Deploy.
We notify you when operating status, capacity, or the operator changes against a sourced record.
Cite this page
DEPLOY. (2026). Oracle Abilene AI Data Center: data center facility record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/facilities/oracle-abilene-texas
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/facilities/oracle-abilene-texas.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/facilities/oracle-abilene-texas
- Data documentation: /data
- Query this programmatically: Deploy MCP