DEPLOY

Data center facility

Galaxy Helios Data Center Campus (Phase 2/3)

Galaxy Digital · Dickens. Every figure below is individually sourced and dated.


In clusterDickens County(6)·Texas(607)

Facility record

under construction

Status

crypto hpc

Type

Dickens

Location

526 MW

Critical IT

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • critical it mw: 526 MW leased to CoreWeave (claimed) · source
  • record: Galaxy Helios Data Center Campus (Phase 2/3) (reported) · source
  • status: Phase 2 permits filed, combined $3.5B; CoreWeave leased 526MW critical IT over 15 years across three phases (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Sep 2026
    Current: under construction

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Galaxy Helios Data Center Campus (Phase 2/3)?
Galaxy Helios Data Center Campus (Phase 2/3) is a data center facility record on the DEPLOY registry, in Dickens. Every fact on the record is individually sourced and dated.
Who operates Galaxy Helios Data Center Campus (Phase 2/3)?
Galaxy Digital operates Galaxy Helios Data Center Campus (Phase 2/3), per the sourced record on the DEPLOY registry.
Is Galaxy Helios Data Center Campus (Phase 2/3) operating?
Galaxy Helios Data Center Campus (Phase 2/3) is recorded as under construction on the DEPLOY registry, with 526 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on Galaxy Helios Data Center Campus (Phase 2/3)?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Galaxy Helios Data Center Campus (Phase 2/3) on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). Galaxy Helios Data Center Campus (Phase 2/3): data center facility record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/facilities/galaxy-helios-campus-phase2-dickens-tx

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces