Data center facility
Soluna Project Dorothy 2
Soluna Holdings · Silverton. Every figure below is individually sourced and dated.
In clusterBriscoe County(8)·Texas(607)
Facility record
operating
Status
crypto hpc
Type
Operator
Location
48 MW
Critical IT
2025
Operational
On the data center map
Evidence
Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.
Timeline
- Aug 2026First recordedAdded to the DEPLOY registry as a sourced facility record
- Sep 2026Current: operating
Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.
Common questions
What is Soluna Project Dorothy 2?
Who operates Soluna Project Dorothy 2?
Is Soluna Project Dorothy 2 operating?
How verified is the data on Soluna Project Dorothy 2?
Deploy Watch
Track Soluna Project Dorothy 2 on Deploy.
We notify you when operating status, capacity, or the operator changes against a sourced record.
Cite this page
DEPLOY. (2026). Soluna Project Dorothy 2: data center facility record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/facilities/soluna-project-dorothy-2-silverton
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/facilities/soluna-project-dorothy-2-silverton.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/facilities/soluna-project-dorothy-2-silverton
- Data documentation: /data
- Query this programmatically: Deploy MCP