Data center facility
Crusoe Childress AI Data Center Campus
Crusoe · Childress. Every figure below is individually sourced and dated.
Part of the tracked campus Crusoe Childress Campus.
- Jobs
- 100 permanent reported
- Cooling
- Closed-loop, non-evaporative liquid cooling
- Grid
- ERCOT · Grid connected, on land the power partner owns: the 270 acre campus belongs to Lancium, which secures the power interconnect and runs energy orchestration, while Crusoe designs, builds and operates the data center. Behind-the-meter solar and storage sit alongside the grid supply. The announcement does not state the interconnect's approval status.
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterTexas(607)
The deal
Inherited from campus Crusoe Childress Campus.
- developer
- Crusoe · Develops and operates the data center campus.
- utility
- Lancium · Owns the 270-acre site and develops/manages behind-the-meter energy infrastructure.
- grid operator
- ERCOT · 1 GW interconnect fully approved by ERCOT.
Investment, workforce and specs
Inherited from campus Crusoe Childress Campus.
Power
Inherited from campus Crusoe Childress Campus. Live grid demand and drought overlay only render on the campus page.
- Power source
- solar storage
- Grid operator
- ERCOT
- Interconnection
- Grid connected, on land the power partner owns: the 270 acre campus belongs to Lancium, which secures the power interconnect and runs energy orchestration, while Crusoe designs, builds and operates the data center. Behind-the-meter solar and storage sit alongside the grid supply. The announcement does not state the interconnect's approval status.
- Water
- Closed-loop, non-evaporative liquid cooling to reduce water use.
Behind-the-meter solar + battery storage (Lancium), solar storage, Announced. Lancium develops/manages behind-the-meter solar and storage; specific generation capacity not disclosed. 1 GW ERCOT-approved grid interconnect.
Behind-the-meter solar, solar, Announced. On-site solar resource developed and managed by Lancium; capacity not disclosed.
On-site energy storage, storage, Announced. Behind-the-meter energy storage for grid reliability; capacity not disclosed.
Facility record
On the data center map
Evidence
Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.
Timeline
- Aug 2026First recordedAdded to the DEPLOY registry as a sourced facility record
- Sep 2026Current: planned
Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.
Common questions
What is Crusoe Childress AI Data Center Campus?
Who operates Crusoe Childress AI Data Center Campus?
Is Crusoe Childress AI Data Center Campus operating?
How verified is the data on Crusoe Childress AI Data Center Campus?
Deploy Watch
Track Crusoe Childress AI Data Center Campus on Deploy.
We notify you when operating status, capacity, or the operator changes against a sourced record.
Cite this page
DEPLOY. (2026). Crusoe Childress AI Data Center Campus: data center facility record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/facilities/crusoe-childress-tx
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/facilities/crusoe-childress-tx.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/facilities/crusoe-childress-tx
- Data documentation: /data
- Query this programmatically: Deploy MCP