DEPLOYDatabase

Data center facility

Cipher Barber Lake Site

Cipher Digital · Colorado City · 951 Co Rd 204, Colorado City, TX. Every figure below is individually sourced and dated.


Part of the tracked campus Barber Lake.

In clusterTexas(611)

The deal

Inherited from campus Barber Lake.

operator
Cipher Digital Inc. · via subsidiary Cipher Barber Lake LLC; formerly Cipher Mining Inc. (ticker CIFR)
offtaker
Fluidstack USA II Inc. · 10-year HPC lease, full campus
utility
Luminant / Vistra Operations · interconnection electrical facilities
financier
Google · backstops Fluidstack obligations; holds Google Warrants

Financial structure

Inherited from campus Barber Lake.

Google lease-obligation backstop
$333M. Google backstops Fluidstack's lease obligations to support project-related debt for the Barber Lake build-out. press release

Power

Inherited from campus Barber Lake. Live grid demand and drought overlay only render on the campus page.

Power source
grid
Grid operator
ERCOT
Interconnection

Barber Lake substation (Luminant/Vistra interconnection facilities), 0.30 GW grid interconnect, Energized. 300 MW ERCOT interconnection approved without load-profile restriction; substation sold back to Vistra at lease end

Facility record

planned

Status

crypto hpc

Type

300 MW

Critical IT

800,000 sqft

Building

Oncor

Serving utility

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • buildingSqft: 800000 (reported) · source
  • critical it mw: 300 (verified) · source
  • note: Located near Colorado City; ERCOT interconnection approval up to 300 MW with an energized substation; suitable for HPC or bitcoin mining (verified) · source
  • record: Cipher Barber Lake Site (reported) · source
  • streetAddress: 951 Co Rd 204, Colorado City, TX (reported) · source · same site as cipher-barber-lake-colorado-city-texas

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Nov 2026
    Current: planned

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Cipher Barber Lake Site?
Cipher Barber Lake Site is a data center facility record on the DEPLOY registry, in Colorado City. Every fact on the record is individually sourced and dated.
Who operates Cipher Barber Lake Site?
Cipher Digital operates Cipher Barber Lake Site, per the sourced record on the DEPLOY registry.
Is Cipher Barber Lake Site operating?
Cipher Barber Lake Site is recorded as planned on the DEPLOY registry, with 300 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on Cipher Barber Lake Site?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Cipher Barber Lake Site on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). Cipher Barber Lake Site: data center facility record. Retrieved November 11, 2026, from https://registry.deploy.report/datacenters/facilities/cipher-barber-lake-mitchell-texas

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces