DEPLOY

Data center facility

Meta El Paso Campus

Meta · El Paso. Every figure below is individually sourced and dated.


Part of the tracked campus Meta / BlackRock El Paso AI Data Center Campus.

The story of Meta El Paso Campusinherited from campus Meta / BlackRock El Paso AI Data Center Campus
Announced capex
$14B
Jobs
300 permanent reported
Derived
Cost per MW
$14M/MW
Cost per job
$47M per permanent job

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterTexas(607)

The deal

Inherited from campus Meta / BlackRock El Paso AI Data Center Campus.

financier
BlackRock (managed funds) · Owns 80% of the venture; ~$4.9B cash contribution plus $12.5B debt financing
utility
El Paso Electric · Grid supplier, up to 1.0 GW (WECC region)
developer
Meta Platforms · Built the campus; retains 20% of the venture and leases capacity back (4-year initial term, up to ~20 years)
financier
Global Infrastructure Partners (GIP) · BlackRock unit; part of the 80% JV capital
financier
HPS Investment Partners · BlackRock unit; part of the JV financing

Financial structure

Inherited from campus Meta / BlackRock El Paso AI Data Center Campus.

Meta construction and development investment
$10B. Over $10B press release
Total venture development cost
$14B. Approximately $14B for buildings and infrastructure press release
BlackRock cash contribution at close
$4.9B. 80% JV interest; funded partly by $12.5B debt financing press release
Senior secured notes (Sopaipilla Investor LLC)
$12.5B. ~$12.5B of senior secured notes priced 2026-07-27 to fund the project journalist report

Investment, workforce and specs

Inherited from campus Meta / BlackRock El Paso AI Data Center Campus.

Capex
$10B source
Construction jobs
4,000 source
Permanent jobs
300 source

Power

Inherited from campus Meta / BlackRock El Paso AI Data Center Campus. Live grid demand and drought overlay only render on the campus page.

Power source
mixed
Grid operator
WECC
Interconnection

El Paso Electric grid supply, 1 GW grid interconnect, Announced. Up to 1.0 GW committed, right to request up to 1.4 GW; El Paso Electric is a WECC utility

Proposed on-site natural gas plant, 0.37 GW gas, Announced. Meta-proposed dedicated ~366 MW gas plant

Facility record

under construction

Status

hyperscale

Type

Meta

Operator

El Paso

Location

1,200,000 sqft

Building

El Paso Electric

Serving utility

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • buildingSqft: 1200000 (reported) · source · ~1.2M sqft
  • record: Meta El Paso Campus (reported) · source
  • servingUtility: El Paso Electric (reported) · source
  • status: campus near the Texas-New Mexico state line, utilizing Meta's updated AI-first architectural design (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Sep 2026
    Current: under construction

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Meta El Paso Campus?
Meta El Paso Campus is a data center facility record on the DEPLOY registry, in El Paso. Every fact on the record is individually sourced and dated.
Who operates Meta El Paso Campus?
Meta operates Meta El Paso Campus, per the sourced record on the DEPLOY registry.
Is Meta El Paso Campus operating?
Meta El Paso Campus is recorded as under construction on the DEPLOY registry. Each figure traces to a source.
How verified is the data on Meta El Paso Campus?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Meta El Paso Campus on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). Meta El Paso Campus: data center facility record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/facilities/meta-el-paso-campus-tx

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces