DataBank Red Oak Campus (DFW9-16)

DataBank · Red Oak. Every figure below is individually sourced and dated.


In clusterTexas(607)

Facility record

under construction

Status

hyperscale

Type

DataBank

Operator

Red Oak

Location

480 MW

Critical IT

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • critical it mw: 480 MW (240 MW phase 1) (claimed) · source
  • record: DataBank Red Oak Campus (DFW9-16) (reported) · source
  • status: under construction; 292 acres, up to 8 buildings, $2B loan for first three secured Apr 2026 (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Sep 2026
    Current: under construction

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is DataBank Red Oak Campus (DFW9-16)?
DataBank Red Oak Campus (DFW9-16) is a data center facility record on the DEPLOY registry, in Red Oak. Every fact on the record is individually sourced and dated.
Who operates DataBank Red Oak Campus (DFW9-16)?
DataBank operates DataBank Red Oak Campus (DFW9-16), per the sourced record on the DEPLOY registry.
Is DataBank Red Oak Campus (DFW9-16) operating?
DataBank Red Oak Campus (DFW9-16) is recorded as under construction on the DEPLOY registry, with 480 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on DataBank Red Oak Campus (DFW9-16)?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track DataBank Red Oak Campus (DFW9-16) on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). DataBank Red Oak Campus (DFW9-16): data center facility record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/facilities/databank-red-oak-campus-ellis-county-tx

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces