PORTS-Pike Technology Campus (SB Energy / OpenAI)

PORTS-Pike Technology Campus is an AI data center campus developed by SB Energy in Ohio, Piketon. 10 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Announced · SB Energy · Federal DOE land · PJM · Piketon, Ohio, United States


Capacity: announced vs energized

Announced-to-energized gap: 10 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Promised online: Q1 2028. 17 months away. Claimed by SB Energy / SoftBank / OpenAI (source).

PORTS-Pike Technology Campus (SB Energy / OpenAI) capacity claims
Source
Announced10 GW2026-08-17claimedjournalist report
Contracted4.25 GW2026-08-17reportedjournalist report
Energized0 GW2026-08-17reportedjournalist report

Construction evidence

Dated satellite imagery of the site itself, oldest to newest, with the campus milestones that landed in each window. This is what the site looked like from orbit while announcements, permits, and energizations were dated into our ledger, so bare land, grading, and building mass tell their own story alongside the paper trail. Sentinel-2 true color, 10 m resolution, cloud-free scenes; click any frame to expand it.

Delivery paceAnnounced Q3 2026 · live Q3 2026 · 0 mo build

2018-06-14Contains modified Copernicus Sentinel data 2018
2020-06-08Contains modified Copernicus Sentinel data 2020
2022-06-18Contains modified Copernicus Sentinel data 2022
2024-09-05Contains modified Copernicus Sentinel data 2024
2025-08-31Contains modified Copernicus Sentinel data 2025

Dated Sentinel-2 imagery, gated to hand-verified site coordinates. Milestones synthesized from the campus's own capacity ledger, financial claims, and lifecycle events; each chip links to its source. How we source and verify it: satellite construction evidence.

Per-building manifest tied to the site polygons and imagery. When we know a building's outline we render it; when we know only its year and capacity we still surface those as first-class rows so the campus total is auditable, not a headline claim. Sorted largest-first; top 6 shown by default of 9.

Building 3
Building sqft: 708,483
polygon on record (18 vertices)
Building 4
Building sqft: 465,563
polygon on record (20 vertices)
Building 16
Building sqft: 147,457
polygon on record (9 vertices)
Building 19
Building sqft: 126,820
polygon on record (16 vertices)
Building 30
Building sqft: 117,355
polygon on record (12 vertices)
Building 15
Building sqft: 113,232
polygon on record (10 vertices)

Manifest totals: 1,843,869 sqft. Rolled from the per-building rows above.

Key facts

announced

Lifecycle

10 GW

Announced

0 GW

Energized

SB Energy

Developer

PJM

Grid

10 GW

Announced-to-energized gap

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

Developer / operator
SB Energy builds, owns and operates under a 20-year OpenAI lease
Capacity (company-claimed)
8 IT-GW total: initial 4.25 IT-GW plus NVIDIA option on 3.75
Compute
NVIDIA exclusive; DSX AI factory platform
Site
PORTS-Pike campus at the former Portsmouth plant, Pike County, Ohio
Phasing (targeted)
Online in phases from 2028
NVIDIA investment (company-claimed)
$1.5B in SB Energy plus credit support
Community (company-claimed)
$4.2B+ AEP Ohio grid investment; $80M community fund
PJM study agreement (utility filing, Oct 2026)
PJM filed ER27-126 at FERC on Oct 13 2026: initial 800 MW under AEP Ohio's tariff plus about 9,570 MW more load (about 10.37 GW) and 10,170 MW gross new gas generation.
Grid build and phasing (utility filing)
AEP Ohio plans three 765 kV lines and related infrastructure for the campus; the expansion is phased through 2032 and studied as one integrated project.
Full build-out (government-stated, Oct 2026)
Pike County says the campus could include 18 data center buildings at full scale, with an estimated 35,000 construction jobs and about 2,500 permanent jobs.
Gas generation ownership (government-stated)
The 9.2 GW of new gas generation, about $33B, is funded in part under the U.S.-Japan trade and investment deal and is to be owned by the U.S. Government.
County agreement (government-stated, Oct 2026)
Pike County commissioners are reviewing a proposed SB Energy agreement that includes payments in lieu of taxes. No final county agreement has been signed.

On the data center map

Every tracked data center is on this map, centered on PORTS-Pike Technology Campus. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.
The story of PORTS-Pike Technology Campus (SB Energy / OpenAI)
Announced capex
$4.2B
Grid
PJM · Generation and grid built together: the campus is paired with up to 10 GW of new generation, of which 9.2 GW is gas, alongside $4.2 billion of new transmission built in partnership with AEP Ohio. The developer has committed to funding that transmission rather than passing it to ratepayers, and treats generation, transmission and compute as one coordinated build.
Tenant
OpenAI
Derived
Cost per MW
$420K/MW

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterOhio(142)

The deal

developer
SB Energy · SoftBank Group subsidiary; builds and operates the campus.
grid operator
PJM Interconnection · The campus sits in PJM territory (subject to FERC's June 2026 large-load interconnection show-cause order).
chip supplier
NVIDIA · Exclusive AI-compute provider to the site.
investor
NVIDIA · $1.5B equity in SB Energy.
tenant
OpenAI · 20-year anchor lease.
guarantor
NVIDIA · Up to $105B conditional guarantee of OpenAI's lease + power-payment obligations.

Power

Power source
behind the meter gas
Grid operator
PJM
Interconnection
Generation and grid built together: the campus is paired with up to 10 GW of new generation, of which 9.2 GW is gas, alongside $4.2 billion of new transmission built in partnership with AEP Ohio. The developer has committed to funding that transmission rather than passing it to ratepayers, and treats generation, transmission and compute as one coordinated build.
Water
Closed loop, no make-up water claimed. The cooling system recirculates rather than running evaporative towers, so after the initial fill the developer expects ongoing use comparable to an office building of similar headcount: sinks, restrooms, washdown and landscaping. That would be far below what the former gaseous diffusion plant on the site consumed.

PORTS-Pike gas-fired generation, 9.20 GW gas, Announced. 9.2 GW of new gas-fired power envisioned to power the campus; unbuilt. U.S. officials say Japan would fund it under a 2025 trade and investment deal.

The PJM grid demand right now: 90.8 GW (EIA-930, 2026-11-11 19:00). PORTS-Pike Technology Campus's announced 10 GW would be 11.0% of the grid's current load.

County water status: No drought in Pike County, week of 2026-11-03 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

PORTS-Pike Technology Campus sits on federal doe land in Ohio, Piketon. It connects to the PJM grid, draws on behind the meter gas power, interconnection is Generation and grid built together: the campus is paired with up to 10 GW of new generation, of which 9.2 GW is gas, alongside $4.2 billion of new transmission built in partnership with AEP Ohio. The developer has committed to funding that transmission rather than passing it to ratepayers, and treats generation, transmission and compute as one coordinated build.. This siting summary is composed from the record's held fields, not speculation; see methodology.

Financial structure

Nvidia lease + power-payment guarantee to SB Energy
up to $105B. Conditional; per an SEC filing; initially backs the first 4.25 GW; scaled down from an originally reported $250B (later cut below $120B) after investor concern over Nvidia's risk exposure. sec filing
Nvidia investment in SB Energy
$1.5B. To back SB Energy's evolution into a leading AI infrastructure developer. press release
SB Energy / SoftBank regional grid investment
$4.2B. At least $4.2B into regional grid infrastructure, alongside power sources supporting 10 GW. journalist report
OpenAI 20-year lease
20-year lease; rent payable once operational; total rent expected to reach tens of billions of dollars. journalist report

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States

Timeline

  1. Aug 2026
    party added
    grid_operator: PJM Interconnection
  2. Nov 2026
    Current: Announced

Sources

c6de1f86-d0f5-4aa2-b82c-448149f7a8d0 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is PORTS-Pike Technology Campus (SB Energy / OpenAI)?
PORTS-Pike Technology Campus (SB Energy / OpenAI) is an AI data center campus tracked on the DEPLOY registry, located in Piketon. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will PORTS-Pike Technology Campus (SB Energy / OpenAI) use?
PORTS-Pike Technology Campus (SB Energy / OpenAI) has 10 GW of announced capacity on the DEPLOY registry, of which 0 GW is recorded as energized, an announced-to-energized gap of 10 GW. Each figure is individually dated and sourced.
Who is building PORTS-Pike Technology Campus (SB Energy / OpenAI)?
SB Energy is recorded as a party to PORTS-Pike Technology Campus (SB Energy / OpenAI) on the DEPLOY registry.
Is PORTS-Pike Technology Campus (SB Energy / OpenAI) operating yet?
As of the most recent verification on the DEPLOY registry, PORTS-Pike Technology Campus (SB Energy / OpenAI) is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on PORTS-Pike Technology Campus (SB Energy / OpenAI)?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track PORTS-Pike Technology Campus (SB Energy / OpenAI) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). PORTS-Pike Technology Campus (SB Energy / OpenAI): AI data center campus record. Retrieved November 11, 2026, from https://registry.deploy.report/datacenters/sb-energy-openai-ohio

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces