The largest campus DEPLOY tracks is Fluidstack Cameron County AI Campus at about 1.50 GW announced. Here is the full ranking, with announced gigawatts next to what is actually energized, so a headline is never mistaken for a running site.


The top of the list

  1. #1
    Fluidstack Cameron County AI Campus
    1.50 GW announced
  2. #2
    Google West Creek Campus (Goochland, Virginia)
    1.20 GW announced
  3. #3
    Nebius Highridge Business Park AI Factory
    1.20 GW announced

Every ranked campus

AI data center campuses ranked by announced capacity
1Fluidstack Cameron County AI CampusCameron Countyunder construction1.50-
2Google West Creek Campus (Goochland, Virginia)Goochland Countyrumored1.20-
3Nebius Highridge Business Park AI FactoryButler Township (Schuylkill County)under construction1.20-
4Kraft Group Sutton Data Center CampusSuttonannounced0.90-
5Crusoe Abilene Microsoft AI Factory CampusAbileneunder construction0.90-
6AM AI Factory Visakhapatnam AI Data CentreVisakhapatnamannounced0.51-
7BDx CGK4 AI Data Center Park (West Java)Jatiluhur (Purwakarta)partially energized0.50-
8VITRO Sta. Rosa (Santa Rosa, Laguna)Santa Rosa, Laguna, Philippinesenergized0.500.05
9KMG Jakarta AI Data CenterJakartaenergized0.400.03
10Delta Forge 1 (Boyce / Rapides Parish)Boyceunder construction0.30-
11Project Southgate (Bell Bay, Tasmania)Bell Bay, Tasmania, Australiaunder construction0.29-
12Yotta NM1 Data Center (Navi Mumbai)Navi Mumbaienergized0.250.05
13Viettel Data Center (Cu Chi, Ho Chi Minh City)Cu Chi District, Ho Chi Minh City, Vietnamunder construction0.14-
14Samsung SDS Gumi AI Data CenterGumi Complex, North Gyeongsang, South Koreaunder construction0.12-
15Drax Power Station Data CentreDrax Power Station, North Yorkshireannounced0.10-
16Akashi Data Center (Astana)Astana, Kazakhstanunder construction0.100.05
17Siam AI Data Center (Thailand)Chonburiunder construction0.10-
18EdgeConneX Cedar Creek Campus (CoreWeave AUS02)Cedar Creekunder construction0.10-
19RackBank GigaCampus (Indore)Pithampur, Indore, Madhya Pradesh, Indiaunder construction0.08-
20SKT AI Data Center (Gasan, Seoul)Gasan-dong, Geumcheon-gu, Seoulenergized0.08-
22Vultr Chennai AI SuperclusterChennai, Indiaannounced0.02-
24GMI Cloud Taiwan AI Factory (Taoyuan)Taoyuan, Taiwanpartially energized0.02-
21Ooredoo / Syntys AI Cloud (Qatar)Doha, Qatarpartially energized-0.03
23GreenNode AI Cloud Cluster (Bangkok, STT Bangkok 1)Bangkok, Thailandenergized-0.02

Ranked by announced gigawatts. DEPLOY is neutral infrastructure: it publishes what is claimed, what is verified, and when, without taking a position for or against any project. See the announced vs energized answer for the aggregate gap.

Free to use on your site, with a link back to DEPLOY.

Common questions

What is the biggest AI data center?

By announced capacity, the largest campus DEPLOY tracks is Fluidstack Cameron County AI Campus at about 1.50 GW announced. Announced size and running size are different facts, and both are shown.

Why rank by announced instead of energized?

Because most of the largest sites are still being built, so their energized capacity is near zero. Announced gigawatts is the honest way to rank ambition, but energized is shown in the same row so a plan is never presented as an operating facility. See how many are actually running.

Are these campuses or buildings?

Campuses. Only the flagship campus tier carries a gigawatt ledger. The wider colocation and hyperscale facilities are counted in the US total and the operator and state rankings, but they are ranked by count and IT capacity, not gigawatts.

How is each figure verified?

Every capacity figure carries an evidence tier (verified, reported, or claimed), an as-of date, and a primary source. The current-best figure resolves to the highest tier then the latest date, excluding superseded claims. The methodology page has the full rule.

Related verified answers

Browse the registryAll verified answers