| PORTS-Pike Technology Campus | Stargate UAE | |
|---|---|---|
| Announced capacity | 10 GW | 1 GW |
| Energized capacity | 0 GW | 0 GW |
| Announced-to-energized gap | 10 GW | 1 GW |
| Lifecycle | announced | under construction |
| Developer | SB Energy | Khazna Data Centres (G42) |
| Location | Piketon, Ohio, United States | Abu Dhabi, Abu Dhabi, United Arab Emirates |
| Grid | PJM | EWEC (Emirates Water and Electricity Company) |
| Acreage | not recorded | not recorded |
On the map
Common questions
Which is bigger, PORTS-Pike Technology Campus or Stargate UAE?
By announced capacity, PORTS-Pike Technology Campus is larger: 10 GW versus 1 GW. Announced figures are claims, not built capacity.
Which is further along, PORTS-Pike Technology Campus or Stargate UAE?
PORTS-Pike Technology Campus is announced; Stargate UAE is under construction. Energized capacity: 0 GW versus 0 GW. DEPLOY tracks the announced-to-energized gap, so "further along" means more energized, not more announced.
Where are PORTS-Pike Technology Campus and Stargate UAE?
PORTS-Pike Technology Campus is in Piketon, Ohio, United States; Stargate UAE is in Abu Dhabi, Abu Dhabi, United Arab Emirates. Each record on DEPLOY is sourced and dated.
Compare more on the data center index or the national map. Announced numbers are claims, not built capacity; see the methodology.