Data center campus
Stargate Lordstown (Ohio)
Stargate Lordstown is an AI data center campus developed by SoftBank Group in Ohio, Lordstown. 0.30 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Announced · SoftBank Group · Former industrial site · PJM · Lordstown, Ohio, United States
Capacity: announced vs energized
Announced-to-energized gap: 0.30 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
Promised online: 2027. 15 months away. Claimed by SoftBank / OpenAI (source).
| Source | ||||
|---|---|---|---|---|
| Announced | 0.30 GW | 2026-04-17 | claimed | journalist report |
| Announced | 1.50 GW | 2025-09-24 | claimed | press release |
| Energized | 0 GW | 2026-07-01 | reported | journalist report |
Construction evidence
Dated satellite imagery of the site itself, oldest to newest, with the campus milestones that landed in each window. This is what the site looked like from orbit while announcements, permits, and energizations were dated into our ledger, so bare land, grading, and building mass tell their own story alongside the paper trail. Sentinel-2 true color, 10 m resolution, cloud-free scenes; click any frame to expand it.
Delivery paceAnnounced Q2 2026 · live Q3 2026 · 3 mo build
Dated Sentinel-2 imagery, gated to hand-verified site coordinates. Milestones synthesized from the campus's own capacity ledger, financial claims, and lifecycle events; each chip links to its source. How we source and verify it: satellite construction evidence.
Per-building manifest tied to the site polygons and imagery. When we know a building's outline we render it; when we know only its year and capacity we still surface those as first-class rows so the campus total is auditable, not a headline claim. Sorted largest-first; 2 on record.
Manifest totals: 3,998,615 sqft. Rolled from the per-building rows above.
Key facts
Lifecycle
Announced
Energized
Developer
Location
Grid
Announced-to-energized gap
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Site legacy
- Former Foxconn / Lordstown Motors EV plant (SoftBank-Foxconn JV acquired plant for ~$375M, Aug 2025)
- Primary use
- Modular server / equipment manufacturing (not primarily a data center)
- Datacenter block
- Up to ~0.3 GW planned (Epoch AI estimate)
- Lifecycle
- Announced (some land cleared, no large-scale construction visible as of mid-2026)
- Cooling
- Closed-loop, designed for zero water use (Oracle co-CEO)
- SoftBank + OpenAI equity into SB Energy
- $1B
- Retooling investment
- ~$3B for modular data-center / AI server production
- Grid operator
- PJM Interconnection
On the data center map
Every tracked data center is on this map, centered on Stargate Lordstown. Pan or zoom out to see how close rivals are building.
- Announced capex
- $375M
- Grid
- PJM · Not published. Coverage of the campus covers the $375 million purchase of the former Foxconn plant, SoftBank's build and a target of operation within the year, and says nothing about the utility, the connection or an interconnection position. Lordstown and a Texas site together are described as scaling to 1.5 GW over 18 months.
- Tenant
- OpenAI
- Cost per MW
- $1M/MW
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterOhio(141)
The deal
- grid operator
- PJM Interconnection · Northeast Ohio is in PJM; power expected from existing Foxconn substation / grid.
- tenant
- OpenAI · Anchor tenant / Stargate program lead.
- chip supplier
- NVIDIA · GPU supplier across the Stargate program.
- developer
- SoftBank Group · SoftBank/OpenAI-led site; SB Energy is the power/development subsidiary.
- construction
- Foxconn (Hon Hai) · SoftBank-Foxconn JV; former Foxconn EV plant repurposed for server/equipment manufacturing.
- developer
- Stargate Infrastructure
Power
- Power source
- grid
- Grid operator
- PJM
- Interconnection
- Not published. Coverage of the campus covers the $375 million purchase of the former Foxconn plant, SoftBank's build and a target of operation within the year, and says nothing about the utility, the connection or an interconnection position. Lordstown and a Texas site together are described as scaling to 1.5 GW over 18 months.
- Water
- Oracle co-CEO stated the site uses a closed-loop cooling system designed to not use water.
The PJM grid demand right now: 71.7 GW (EIA-930, 2026-09-27 10:00). Stargate Lordstown's announced 0.30 GW would be 0.4% of the grid's current load.
County water status: No drought in Trumbull County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Stargate Lordstown sits on former industrial site in Ohio, Lordstown. It connects to the PJM grid, draws on grid power, interconnection is Not published. Coverage of the campus covers the $375 million purchase of the former Foxconn plant, SoftBank's build and a target of operation within the year, and says nothing about the utility, the connection or an interconnection position. Lordstown and a Texas site together are described as scaling to 1.5 GW over 18 months.. This siting summary is composed from the record's held fields, not speculation; see methodology.
Financial structure
- OpenAI + SoftBank capital into SB Energy
- $1B. Jan 2026: OpenAI and SoftBank each invested ~$500M in SoftBank's power subsidiary SB Energy to accelerate Stargate power/datacenter buildout; SB Energy-wide, not Lordstown-specific. journalist report
- SoftBank acquisition of former Foxconn Ohio EV plant
- $375M. Aug 2025 purchase of the Lordstown facility, converted to modular AI-server/equipment production under a SoftBank-Foxconn JV. journalist report
- SoftBank acquisition of Lordstown plant
- $375M. SoftBank acquired the former Foxconn/GM Lordstown plant (~6.2M sq ft); Foxconn continues to operate it journalist report
- SoftBank's purchase of the former Foxconn plant
- $375M. Covers the 6.2 million sq ft former GM assembly complex and its equipment, bought from Foxconn in August 2025. journalist report
- Retooling for modular data center / AI server production
- up to $3B. SoftBank could invest up to $3 billion to retool the facility (reported) journalist report
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Timeline
- Aug 2026financial recordedland_purchase: SoftBank's purchase of the former Foxconn plant
- Sep 2026Current: Announced
Sources
- OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites · OpenAI
- OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites · SoftBank Group
- OpenAI Stargate: where the US sites stand · Epoch AI
- Data center to occupy small part of Lordstown AI hub, feature advanced design · WFMJ
- Lordstown Data Center to be Operational Next Year · Business Journal Daily
8eb98cdb-8ad1-4fe9-9385-f6c54e2db0b6 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Stargate Lordstown (Ohio)?
How much power will Stargate Lordstown (Ohio) use?
Who is building Stargate Lordstown (Ohio)?
Is Stargate Lordstown (Ohio) operating yet?
How verified is the data on Stargate Lordstown (Ohio)?
Deploy Watch
Track Stargate Lordstown (Ohio) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Stargate Lordstown (Ohio): AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/stargate-lordstown-ohio
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/stargate-lordstown-ohio.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/stargate-lordstown-ohio
- Data documentation: /data
- Query this programmatically: Deploy MCP