DEPLOY

Data center campus

Meta Prometheus Data Center (New Albany)

Meta Prometheus Data Center is an AI data center campus developed by Meta Platforms in Ohio, New Albany. 1 GW of capacity has been announced; 0.50 GW is energized. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Partially energized · Meta Platforms · Private land · PJM · New Albany, Ohio, United States


Capacity: announced vs energized

Announced-to-energized gap: 0.50 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Promised online: 2026. Energized capacity is now on record. Claimed by Mark Zuckerberg / Meta (source).

Meta Prometheus Data Center (New Albany) capacity claims
Source
Announced1 GW2026-05-01claimedjournalist report
Energized0.50 GW2026-05-01reportedjournalist report

Construction evidence

Dated satellite imagery of the site itself, oldest to newest, with the campus milestones that landed in each window. This is what the site looked like from orbit while announcements, permits, and energizations were dated into our ledger, so bare land, grading, and building mass tell their own story alongside the paper trail. Sentinel-2 true color, 10 m resolution, cloud-free scenes; click any frame to expand it.

Delivery paceAnnounced Q2 2026 · live Q2 2026 · 0 mo build

2018-06-14Contains modified Copernicus Sentinel data 2018
2020-06-08Contains modified Copernicus Sentinel data 2020
2022-06-03Contains modified Copernicus Sentinel data 2022
2024-09-05Contains modified Copernicus Sentinel data 2024
2025-08-01Contains modified Copernicus Sentinel data 2025

Dated Sentinel-2 imagery, gated to hand-verified site coordinates. Milestones synthesized from the campus's own capacity ledger, financial claims, and lifecycle events; each chip links to its source. How we source and verify it: satellite construction evidence.

Per-building manifest tied to the site polygons and imagery. When we know a building's outline we render it; when we know only its year and capacity we still surface those as first-class rows so the campus total is auditable, not a headline claim. Sorted largest-first; 6 on record.

NAO 1/NAO 2
Building sqft: 664,010
polygon on record (13 vertices)
NAO 5/NAO 6
Building sqft: 609,470
polygon on record (17 vertices)
NAO 3
Building sqft: 366,342
polygon on record (9 vertices)
LCO 1
Building sqft: 365,973
polygon on record (13 vertices)
LCO 2
Building sqft: 304,463
polygon on record (9 vertices)
DC Building 7
Building sqft: 95,295
polygon on record (69 vertices)

Manifest totals: 2,405,553 sqft. Rolled from the per-building rows above.

Key facts

1 GW

Announced

0.50 GW

Energized

PJM

Grid

1

Facilities tracked

On the data center map

Every tracked data center is on this map, centered on Meta Prometheus Data Center. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.
The story of Meta Prometheus Data Center (New Albany)
Announced capex
$1.5B
Derived
Cost per MW
$2M/MW

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterOhio(141)

The deal

utility
AEP Ohio · Grid interconnection utility.
grid operator
PJM · AEP Ohio operates within PJM Interconnection.
construction
Williams Companies · Building the Socrates South behind-the-meter gas facility.
utility
Vistra / Constellation / Oklo / TerraPower · Nuclear power counterparties (PPAs and future SMR/advanced-reactor deals).
developer
Meta Platforms · Owner-operator; New Albany campus.
tenant
Meta Platforms · Self-tenant; AI supercluster compute.

Power

Power source
mixed
Grid operator
PJM
Interconnection

Williams Socrates South (behind-the-meter gas), 0.20 GW gas, Under construction. ~307.5 MW nameplate, ~258 MW at design ambient, 200 MW firm; construction began June 2025, targeted before end of 2026.

Vistra Ohio nuclear PPA, 2.10 GW nuclear, Financed. Meta to buy >2.1 GW from two Vistra nuclear plants in Ohio plus expansions; also TerraPower, Oklo (Aurora Powerhouse, Pike County) and Constellation agreements.

Contracted renewables (Ohio solar / Indiana wind), 0.80 GW solar storage, Financed. Over 800 MW of renewable energy contracted.

The PJM grid demand right now: 74.6 GW (EIA-930, 2026-09-27 05:00). Meta Prometheus Data Center's announced 1 GW would be 1.3% of the grid's current load.

County water status: No drought in Licking County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Silicon on site

Every AI chip publicly attributed to Meta Prometheus Data Center (New Albany) on the DEPLOY registry. Quantity hints are unstructured because underlying disclosures vary by an order of magnitude. Source links per row.

  1. NVIDIA Blackwell training capacity at the 1 GW Prometheus site

    reported

    Meta

  2. as of 2024-04-10

    Meta's own AI accelerator generation deployed alongside Nvidia at Prometheus

    reported

    Meta AI

  3. Nvidia complement to MTIA for training + inference at Prometheus

    reported

    Meta Engineering

Why here

Meta Prometheus Data Center sits on private land in Ohio, New Albany. It connects to the PJM grid, draws on mixed power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Financial structure

Meta New Albany campus investment (to date)
$1.5B. Cumulative since breaking ground in 2017; understates full Prometheus buildout. journalist report

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States
FAA Proposed Rule: Enabling Supersonic Overland Flight (July 2026)operational restriction · 2026-07-02 · United States

Facilities at this campus

Timeline

  1. Aug 2026
    party added
    utility: Vistra / Constellation / Oklo / TerraPower
  2. Sep 2026
    Current: Partially energized

Sources

d7c13110-4def-4903-9828-a30b405f3afb · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Meta Prometheus Data Center (New Albany)?
Meta Prometheus Data Center (New Albany) is an AI data center campus tracked on the DEPLOY registry, located in New Albany. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will Meta Prometheus Data Center (New Albany) use?
Meta Prometheus Data Center (New Albany) has 1 GW of announced capacity on the DEPLOY registry, of which 0.50 GW is recorded as energized, an announced-to-energized gap of 0.50 GW. Each figure is individually dated and sourced.
Who is building Meta Prometheus Data Center (New Albany)?
Meta Platforms is recorded as a party to Meta Prometheus Data Center (New Albany) on the DEPLOY registry. The full party list, with each role, is on the record.
Is Meta Prometheus Data Center (New Albany) operating yet?
As of the most recent verification on the DEPLOY registry, Meta Prometheus Data Center (New Albany) is partially energized. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Meta Prometheus Data Center (New Albany)?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Meta Prometheus Data Center (New Albany) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Meta Prometheus Data Center (New Albany): AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/meta-prometheus-ohio

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces