Data center campus
Meta Lebanon Data Center (LEAP District)
Meta Lebanon Data Center is an AI data center campus developed by Meta Platforms in Indiana, Lebanon. 1 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Under construction · Meta Platforms · greenfield · MISO · Lebanon, Indiana, United States
Capacity: announced vs energized
Announced-to-energized gap: 1 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 1 GW | 2026-02-11 | claimed | press release |
Key facts
Lifecycle
Announced
Energized
Developer
Location
Grid
Land
Facilities tracked
On the data center map
Every tracked data center is on this map, centered on Meta Lebanon Data Center. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
- Announced capex
- $10B
- Jobs
- 300 permanent reported
- Cost per MW
- $10M/MW
- Cost per job
- $33M per permanent job
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterIndiana(86)
The deal
- utility
- Boone County REMC · serving co-op; Meta pays full energy cost per announcement
- operator
- Meta Platforms
Power
- Power source
- grid
- Grid operator
- MISO
- Interconnection
The MISO grid demand right now: 76.0 GW (EIA-930, 2026-09-27 19:00). Meta Lebanon Data Center's announced 1 GW would be 1.3% of the grid's current load.
County water status: No drought in Boone County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Meta Lebanon Data Center sits on greenfield in Indiana, Lebanon. It connects to the MISO grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Investment, workforce and specs
Facilities at this campus
- Lebanon Data Centerhyperscale
- Meta Lebanon LEAP Campus (Project Domino)hyperscale
Timeline
- Aug 2026party addedutility: Boone County REMC
- Sep 2026Current: Under construction
Sources
- Meta Makes Lebanon Data Center Announcement Official
- Details on long-expected Meta data center campus unveiled
aca9e9b9-db6a-469a-926b-79c18512452f · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Meta Lebanon Data Center (LEAP District)?
How much power will Meta Lebanon Data Center (LEAP District) use?
Who is building Meta Lebanon Data Center (LEAP District)?
Is Meta Lebanon Data Center (LEAP District) operating yet?
How verified is the data on Meta Lebanon Data Center (LEAP District)?
Deploy Watch
Track Meta Lebanon Data Center (LEAP District) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Meta Lebanon Data Center (LEAP District): AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/meta-lebanon-leap-indiana
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/meta-lebanon-leap-indiana.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/meta-lebanon-leap-indiana
- Data documentation: /data
- Query this programmatically: Deploy MCP