Data center facility
Meta New Albany Data Center
Meta · New Albany. Every figure below is individually sourced and dated.
Part of the tracked campus Meta Prometheus Data Center (New Albany).
- Announced capex
- $1.5B
- Tenant
- Meta Platforms
- Cost per MW
- $2M/MW
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterOhio(141)
The deal
Inherited from campus Meta Prometheus Data Center (New Albany).
- utility
- AEP Ohio · Grid interconnection utility.
- grid operator
- PJM · AEP Ohio operates within PJM Interconnection.
- construction
- Williams Companies · Building the Socrates South behind-the-meter gas facility.
- utility
- Vistra / Constellation / Oklo / TerraPower · Nuclear power counterparties (PPAs and future SMR/advanced-reactor deals).
- developer
- Meta Platforms · Owner-operator; New Albany campus.
- tenant
- Meta Platforms · Self-tenant; AI supercluster compute.
Financial structure
Inherited from campus Meta Prometheus Data Center (New Albany).
- Meta New Albany campus investment (to date)
- $1.5B. Cumulative since breaking ground in 2017; understates full Prometheus buildout. journalist report
Power
Inherited from campus Meta Prometheus Data Center (New Albany). Live grid demand and drought overlay only render on the campus page.
- Power source
- mixed
- Grid operator
- PJM
- Interconnection
Williams Socrates South (behind-the-meter gas), 0.20 GW gas, Under construction. ~307.5 MW nameplate, ~258 MW at design ambient, 200 MW firm; construction began June 2025, targeted before end of 2026.
Vistra Ohio nuclear PPA, 2.10 GW nuclear, Financed. Meta to buy >2.1 GW from two Vistra nuclear plants in Ohio plus expansions; also TerraPower, Oklo (Aurora Powerhouse, Pike County) and Constellation agreements.
Contracted renewables (Ohio solar / Indiana wind), 0.80 GW solar storage, Financed. Over 800 MW of renewable energy contracted.
Facility record
On the data center map
Evidence
Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.
Timeline
- Aug 2026First recordedAdded to the DEPLOY registry as a sourced facility record
- Sep 2026Current: operating
Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.
Common questions
What is Meta New Albany Data Center?
Who operates Meta New Albany Data Center?
Is Meta New Albany Data Center operating?
How verified is the data on Meta New Albany Data Center?
Deploy Watch
Track Meta New Albany Data Center on Deploy.
We notify you when operating status, capacity, or the operator changes against a sourced record.
Cite this page
DEPLOY. (2026). Meta New Albany Data Center: data center facility record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/facilities/meta-ohio-new-albany
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/facilities/meta-ohio-new-albany.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/facilities/meta-ohio-new-albany
- Data documentation: /data
- Query this programmatically: Deploy MCP