Data center facility

Meta New Albany Data Center

Meta · New Albany. Every figure below is individually sourced and dated.


Part of the tracked campus Meta Prometheus Data Center (New Albany).

The story of Meta New Albany Data Centerinherited from campus Meta Prometheus Data Center (New Albany)
Announced capex
$1.5B
Derived
Cost per MW
$2M/MW

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterOhio(141)

The deal

Inherited from campus Meta Prometheus Data Center (New Albany).

utility
AEP Ohio · Grid interconnection utility.
grid operator
PJM · AEP Ohio operates within PJM Interconnection.
construction
Williams Companies · Building the Socrates South behind-the-meter gas facility.
utility
Vistra / Constellation / Oklo / TerraPower · Nuclear power counterparties (PPAs and future SMR/advanced-reactor deals).
developer
Meta Platforms · Owner-operator; New Albany campus.
tenant
Meta Platforms · Self-tenant; AI supercluster compute.

Financial structure

Inherited from campus Meta Prometheus Data Center (New Albany).

Meta New Albany campus investment (to date)
$1.5B. Cumulative since breaking ground in 2017; understates full Prometheus buildout. journalist report

Power

Inherited from campus Meta Prometheus Data Center (New Albany). Live grid demand and drought overlay only render on the campus page.

Power source
mixed
Grid operator
PJM
Interconnection

Williams Socrates South (behind-the-meter gas), 0.20 GW gas, Under construction. ~307.5 MW nameplate, ~258 MW at design ambient, 200 MW firm; construction began June 2025, targeted before end of 2026.

Vistra Ohio nuclear PPA, 2.10 GW nuclear, Financed. Meta to buy >2.1 GW from two Vistra nuclear plants in Ohio plus expansions; also TerraPower, Oklo (Aurora Powerhouse, Pike County) and Constellation agreements.

Contracted renewables (Ohio solar / Indiana wind), 0.80 GW solar storage, Financed. Over 800 MW of renewable energy contracted.

Facility record

operating

Status

hyperscale

Type

Meta

Operator

New Albany

Location

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • capex usd: 1500000000 (reported) · source
  • jobs construction: 1200 (reported) · source
  • jobs permanent: 300 (reported) · source
  • record: Meta New Albany Data Center (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Sep 2026
    Current: operating

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Meta New Albany Data Center?
Meta New Albany Data Center is a data center facility record on the DEPLOY registry, in New Albany. Every fact on the record is individually sourced and dated.
Who operates Meta New Albany Data Center?
Meta operates Meta New Albany Data Center, per the sourced record on the DEPLOY registry.
Is Meta New Albany Data Center operating?
Meta New Albany Data Center is recorded as operating on the DEPLOY registry. Each figure traces to a source.
How verified is the data on Meta New Albany Data Center?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Meta New Albany Data Center on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). Meta New Albany Data Center: data center facility record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/facilities/meta-ohio-new-albany

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces