Data center campus

Lancium Fort Stockton Clean Campus

Lancium Fort Stockton Clean Campus is an AI data center campus developed by Lancium in Texas, Fort Stockton. 0.33 GW of capacity has been announced; 0.03 GW is energized. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Partially energized · Lancium · greenfield · ERCOT · Fort Stockton, Texas, United States


Capacity: announced vs energized

Announced-to-energized gap: 0.30 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Promised online: 2022. Energized capacity is now on record. Claimed by Lancium (source).

Lancium Fort Stockton Clean Campus capacity claims
Source
Announced0.33 GW2021-09-15reportedpress release
Energized0.03 GW2024-06-01claimedtracker

Key facts

0.33 GW

Announced

0.03 GW

Energized

Lancium

Developer

ERCOT

Grid

0.30 GW

Announced-to-energized gap

On the data center map

Every tracked data center is on this map, centered on Lancium Fort Stockton Clean Campus. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

In clusterTexas(607)

The deal

operator
Lancium · Blackstone-backed (~$500M investment reported)
utility
ERCOT · Controllable Load Resource designation Nov 2022
utility
Broad Reach Power · Retail energy supplier and qualified scheduling entity (QSE) for a portion of the Fort Stockton Clean Campus; also battery-storage arrangement. Broad Reach holds a ~21 GW wind/solar/storage portfolio. Per lancium.com/2022/07/07 partnership announcement.

Power

Power source
grid
Grid operator
ERCOT
Interconnection
Water
Closed-loop, non-evaporative liquid cooling that recirculates a sealed water volume; once filled it requires no additional water for the life of the project.

ERCOT grid interconnection (Controllable Load Resource), 0.33 GW grid interconnect, Partially energized. Lancium Smart Response demand-flexibility; designated CLR by ERCOT

The Texas (ERCOT) grid demand right now: 52.0 GW (EIA-930, 2026-09-27 10:00). Lancium Fort Stockton Clean Campus's announced 0.33 GW would be 0.6% of the grid's current load.

County water status: Moderate drought (D1) in Pecos County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Lancium Fort Stockton Clean Campus sits on greenfield in Texas, Fort Stockton. It connects to the ERCOT grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States

Investment, workforce and specs

Permanent jobs
dozens of local high-paying jobs (company estimate, not itemized) source

Timeline

  1. Aug 2026
    party added
    utility: Broad Reach Power
  2. Sep 2026
    Current: Partially energized

Sources

a91b1386-c93a-4a94-b298-767521f80726 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Lancium Fort Stockton Clean Campus?
Lancium Fort Stockton Clean Campus is an AI data center campus tracked on the DEPLOY registry, located in Fort Stockton. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will Lancium Fort Stockton Clean Campus use?
Lancium Fort Stockton Clean Campus has 0.33 GW of announced capacity on the DEPLOY registry, of which 0.03 GW is recorded as energized, an announced-to-energized gap of 0.30 GW. Each figure is individually dated and sourced.
Who is building Lancium Fort Stockton Clean Campus?
Lancium is recorded as a party to Lancium Fort Stockton Clean Campus on the DEPLOY registry.
Is Lancium Fort Stockton Clean Campus operating yet?
As of the most recent verification on the DEPLOY registry, Lancium Fort Stockton Clean Campus is partially energized. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Lancium Fort Stockton Clean Campus?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Lancium Fort Stockton Clean Campus on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Lancium Fort Stockton Clean Campus: AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/lancium-fort-stockton-clean-campus-texas

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces