# Lancium Fort Stockton Clean Campus

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** a91b1386-c93a-4a94-b298-767521f80726
- **Type:** AI data center campus
- **Location:** Fort Stockton, Texas, United States
- **Lifecycle state:** partially_energized
- **Announced capacity (GW):** 0.325
- **Energized capacity (GW):** 0.025
- **Announced-to-energized gap (GW):** 0.3

## Capacity ledger (append-only, dated, sourced)

- announced: 0.325 GW · reported · as of 2021-09-15 · https://www.prnewswire.com/news-releases/lancium-breaks-ground-on-first-clean-campus-in-fort-stockton-texas-301377974.html
- energized: 0.025 GW · claimed · as of 2024-06-01 · https://www.gem.wiki/Fort_Stockton_Clean_Campus

## Parties


## Common questions


**What is Lancium Fort Stockton Clean Campus?**

Lancium Fort Stockton Clean Campus is an AI data center campus tracked on the DEPLOY registry, located in Fort Stockton. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will Lancium Fort Stockton Clean Campus use?**

Lancium Fort Stockton Clean Campus has 0.33 GW of announced capacity on the DEPLOY registry, of which 0.03 GW is recorded as energized, an announced-to-energized gap of 0.30 GW. Each figure is individually dated and sourced.

**Is Lancium Fort Stockton Clean Campus operating yet?**

As of the most recent verification on the DEPLOY registry, Lancium Fort Stockton Clean Campus is partially energized. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on Lancium Fort Stockton Clean Campus?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- Lancium Breaks Ground On First Clean Campus In Fort Stockton, Texas: https://www.prnewswire.com/news-releases/lancium-breaks-ground-on-first-clean-campus-in-fort-stockton-texas-301377974.html
- Fort Stockton Clean Campus: https://www.gem.wiki/Fort_Stockton_Clean_Campus
- Fort Stockton Clean Campus Data Center (325 MW): https://www.datacentermap.com/usa/texas/fort-stockton/fort-stockton-clean-campus/
- Lancium Locations: https://lancium.com/locations/

Canonical: https://registry.deploy.report/datacenters/lancium-fort-stockton-clean-campus-texas
JSON: https://registry.deploy.report/v1/datacenters/lancium-fort-stockton-clean-campus-texas
