Matrix Data Center Campus (The Matrix Center)

Matrix Data Center Campus is an AI data center campus developed by MSB Global Services in Texas, Sulphur Springs. 0.80 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Under construction · MSB Global Services · greenfield · ERCOT · Sulphur Springs, Texas, United States


Capacity: announced vs energized

Announced-to-energized gap: 0.80 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Matrix Data Center Campus (The Matrix Center) capacity claims
Source
Announced0.80 GW2026-03-01claimedpress release
Announced3 GW2025-06-13claimedpress release
Under construction0.10 GW2026-03-01claimedpress release

Key facts

0.80 GW

Announced

0 GW

Energized

MSB Global Services

Developer

ERCOT

Grid

0.80 GW

Announced-to-energized gap

On the data center map

Every tracked data center is on this map, centered on Matrix Data Center Campus. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.
The story of Matrix Data Center Campus (The Matrix Center)
Announced capex
$18.7B
Jobs
1,500 permanent reported
Grid
ERCOT · Inside ERCOT with generation of its own: the campus is pitched on access to ERCOT's competitive wholesale market at around $0.06 per kWh, alongside on-site algae biofuel, solar with battery storage, fuel cells and geothermal. It is planned as 30 identical 100 MW buildings, with 400 MW by the end of 2026 and another 400 MW by early 2027. No interconnection position has been published.
Derived
Cost per MW
$23M/MW
Cost per job
$12M per permanent job

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterTexas(607)

The deal

developer
MSB Global Services · Houston-based; direct investment reported ~$140M vs $18B total-community-investment claim.
chip supplier
NVIDIA · Marketed as 'optimized for NVIDIA GB300'; no confirmed supply agreement.
utility
Bloom Energy · On-site fuel-cell microgrid provider for first 100 MW building (developer-claimed)

Power

Power source
mixed
Grid operator
ERCOT
Interconnection
Inside ERCOT with generation of its own: the campus is pitched on access to ERCOT's competitive wholesale market at around $0.06 per kWh, alongside on-site algae biofuel, solar with battery storage, fuel cells and geothermal. It is planned as 30 identical 100 MW buildings, with 400 MW by the end of 2026 and another 400 MW by early 2027. No interconnection position has been published.
Water
Zero water, per the operator. MSB describes the campus as zero-water and direct-to-chip cooled at a PUE of 1.1. No water source, volume or permit figure is published, so the claim cannot be checked against anything.

Bloom Energy fuel-cell microgrid (Phase 1), 0.10 GW gas, Announced. First 100 MW building to run on a natural-gas Bloom fuel-cell microgrid; no TCEQ air permit found.

Matrix Bloom Energy fuel-cell microgrid (Building 1), 0.10 GW gas, Announced. Behind-the-meter Bloom Energy fuel-cell microgrid powering the first 100 MW building; developer-claimed

Matrix Phase II geothermal microgrid, 1.20 GW other, Announced. Developer-claimed 1,200 MW Phase II via geothermal microgrid; highly speculative

The Texas (ERCOT) grid demand right now: 51.8 GW (EIA-930, 2026-09-27 13:00). Matrix Data Center Campus's announced 0.80 GW would be 1.5% of the grid's current load.

County water status: Extreme drought (D3) in Hopkins County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Matrix Data Center Campus sits on greenfield in Texas, Sulphur Springs. It connects to the ERCOT grid, draws on mixed power, interconnection is Inside ERCOT with generation of its own: the campus is pitched on access to ERCOT's competitive wholesale market at around $0.06 per kWh, alongside on-site algae biofuel, solar with battery storage, fuel cells and geothermal. It is planned as 30 identical 100 MW buildings, with 400 MW by the end of 2026 and another 400 MW by early 2027. No interconnection position has been published.. This siting summary is composed from the record's held fields, not speculation; see methodology.

Financial structure

Total Matrix campus investment
$18.7B. Developer/city-claimed full 3GW buildout; unverified journalist report

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States

Investment, workforce and specs

Permanent jobs
1,500 jobs (per city manager) source

Timeline

  1. Aug 2026
    party added
    utility: Bloom Energy
  2. Sep 2026
    Current: Under construction

Sources

0c2fac3e-e47d-416b-802d-98731445f823 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Matrix Data Center Campus (The Matrix Center)?
Matrix Data Center Campus (The Matrix Center) is an AI data center campus tracked on the DEPLOY registry, located in Sulphur Springs. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will Matrix Data Center Campus (The Matrix Center) use?
Matrix Data Center Campus (The Matrix Center) has 0.80 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building Matrix Data Center Campus (The Matrix Center)?
MSB Global Services is recorded as a party to Matrix Data Center Campus (The Matrix Center) on the DEPLOY registry.
Is Matrix Data Center Campus (The Matrix Center) operating yet?
As of the most recent verification on the DEPLOY registry, Matrix Data Center Campus (The Matrix Center) is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Matrix Data Center Campus (The Matrix Center)?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Matrix Data Center Campus (The Matrix Center) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Matrix Data Center Campus (The Matrix Center): AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/msb-global-matrix-sulphur-springs

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces