{"id":"a91b1386-c93a-4a94-b298-767521f80726","slug":"lancium-fort-stockton-clean-campus-texas","name":"Lancium Fort Stockton Clean Campus","aliases":["Fort Stockton Clean Campus","Lancium Pecos County"],"locationId":"ae3cd15c-df05-435c-8296-4bcacf2b37b6","lat":30.904473,"lng":-102.9177867,"locationPrecision":"exact","landStatus":"greenfield","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"ERCOT","waterSourceNotes":"Closed-loop, non-evaporative liquid cooling that recirculates a sealed water volume; once filled it requires no additional water for the life of the project.","servingUtility":null,"acreage":110,"totalBuildingSqft":null,"streetAddress":null,"notes":"Lancium's first Clean Campus in Pecos County, distinct from its Abilene campus. Designed for up to 325 MW of flexible/controllable load co-located with West Texas renewable oversupply; an initial ~25 MW stage energized and substations built out for expansion. ERCOT designated the site a Controllable Load Resource (Nov 2022) using Lancium Smart Response, a grid/ancillary-services signal. Current energized MW versus the 325 MW target and the AI-tenant mix are not fully disclosed.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.prnewswire.com/news-releases/lancium-breaks-ground-on-first-clean-campus-in-fort-stockton-texas-301377974.html","date":"2021-09-14","title":"Lancium Breaks Ground On First Clean Campus In Fort Stockton, Texas","publisher":"Lancium / PR Newswire"},{"url":"https://www.gem.wiki/Fort_Stockton_Clean_Campus","date":"2024-01-01","title":"Fort Stockton Clean Campus","publisher":"Global Energy Monitor"},{"url":"https://www.datacentermap.com/usa/texas/fort-stockton/fort-stockton-clean-campus/","date":"2024-01-01","title":"Fort Stockton Clean Campus Data Center (325 MW)","publisher":"Data Center Map"},{"url":"https://lancium.com/locations/","title":"Lancium Locations","sourceName":"Lancium"}],"reviewNote":null,"createdAt":"2026-08-17T20:23:18.896Z","updatedAt":"2026-08-28T14:22:23.508Z","location":{"id":"ae3cd15c-df05-435c-8296-4bcacf2b37b6","name":"Fort Stockton","slug":"fort-stockton-texas","kind":"city","parentLocationId":"45f67762-10f4-4255-be84-45c73efe25f9","region":"West Coast","lat":30.891901,"lng":-102.883662,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T18:20:54.166Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"68956daf-4276-4cbe-adff-2a9c13937ccd","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","companyId":null,"externalName":"Lancium","role":"operator","structureNotes":"Blackstone-backed (~$500M investment reported)","createdAt":"2026-08-17T20:23:20.521Z","company":null},{"id":"acec4e6d-f3e3-41ac-957f-0ea46d92eb0a","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","companyId":null,"externalName":"ERCOT","role":"utility","structureNotes":"Controllable Load Resource designation Nov 2022","createdAt":"2026-08-17T20:23:21.275Z","company":null},{"id":"13f60a07-23c4-4ec0-aee0-003a7dfe92df","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","companyId":null,"externalName":"Broad Reach Power","role":"utility","structureNotes":"Retail energy supplier and qualified scheduling entity (QSE) for a portion of the Fort Stockton Clean Campus; also battery-storage arrangement. Broad Reach holds a ~21 GW wind/solar/storage portfolio. Per lancium.com/2022/07/07 partnership announcement.","createdAt":"2026-08-19T00:16:11.106Z","company":null}],"capacityClaims":[{"id":"736a8142-3992-4e1b-b15c-e1d8d11ff56e","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","series":"announced","valueGw":0.325,"asOf":"2021-09-15T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/lancium-breaks-ground-on-first-clean-campus-in-fort-stockton-texas-301377974.html","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"325 MW full capacity. Original claimant Lancium own groundbreaking release 2021-09-15.","createdAt":"2026-08-17T20:23:19.598Z"},{"id":"7ea4c2b8-e6bb-49af-89d4-642abcbe58ba","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","series":"energized","valueGw":0.025,"asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://www.gem.wiki/Fort_Stockton_Clean_Campus","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":"GEM describes a 25 MW operating Bitcoin mining / data processing center on grid-powered substation; full 325 MW expansion not confirmed as built.","createdAt":"2026-08-19T00:16:09.755Z"}],"financialClaims":[],"metricClaims":[{"id":"59e570a0-d11f-453c-a68e-9c9100f0e73d","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","metricType":"jobs_permanent","valueNumeric":null,"valueText":"dozens of local high-paying jobs (company estimate, not itemized)","unit":null,"grantingJurisdiction":null,"asOf":"2021-06-01T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/lancium-breaks-ground-on-first-clean-campus-in-fort-stockton-texas-301377974.html","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:16:10.289Z"}],"powerProjects":[{"id":"c7a57ea4-3273-4338-b1cb-a9937d5bceae","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","name":"ERCOT grid interconnection (Controllable Load Resource)","type":"grid_interconnect","capacityGw":0.325,"lifecycleState":"partially_energized","sourceUrl":"https://www.gem.wiki/Fort_Stockton_Clean_Campus","evidenceTier":"reported","note":"Lancium Smart Response demand-flexibility; designated CLR by ERCOT","createdAt":"2026-08-17T20:23:20.134Z"}],"facilities":[],"incidents":[],"events":[{"id":"1ed38307-e0de-4315-8e1f-9c1b3b3e0453","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Broad Reach Power","occurredAt":"2026-08-19T00:16:11.487Z","createdAt":"2026-08-19T00:16:11.487Z"},{"id":"53211606-a534-43b3-97e4-ae131c88b013","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0.025","claimId":"7ea4c2b8-e6bb-49af-89d4-642abcbe58ba","detail":null,"occurredAt":"2026-08-19T00:16:10.058Z","createdAt":"2026-08-19T00:16:10.058Z"},{"id":"ee9fc91c-cc81-4fe3-9e8d-2c6467a0b716","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0.025","claimId":"7ea4c2b8-e6bb-49af-89d4-642abcbe58ba","detail":"claimed · tracker","occurredAt":"2026-08-19T00:16:09.906Z","createdAt":"2026-08-19T00:16:09.906Z"},{"id":"9b0191f2-dca0-45cc-93d8-7b0ee7e09f70","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: ERCOT","occurredAt":"2026-08-17T20:23:21.652Z","createdAt":"2026-08-17T20:23:21.652Z"},{"id":"252463a7-63e8-423a-bac3-ed3db9de2e53","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: Lancium","occurredAt":"2026-08-17T20:23:20.897Z","createdAt":"2026-08-17T20:23:20.897Z"},{"id":"13cee46d-9473-47ca-a8b9-0086579e5a27","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.325","claimId":"736a8142-3992-4e1b-b15c-e1d8d11ff56e","detail":null,"occurredAt":"2026-08-17T20:23:19.902Z","createdAt":"2026-08-17T20:23:19.902Z"},{"id":"27561a93-5a70-43ee-adf5-e5de47a38106","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.325","claimId":"736a8142-3992-4e1b-b15c-e1d8d11ff56e","detail":"reported · utility_filing","occurredAt":"2026-08-17T20:23:19.751Z","createdAt":"2026-08-17T20:23:19.751Z"}],"capacity_picture":{"announced_gw":0.325,"contracted_gw":null,"under_construction_gw":null,"energized_gw":0.025,"announced_minus_energized_gw":0.3,"by_series":{"announced":{"valueGw":0.325,"asOf":"2021-09-15T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.prnewswire.com/news-releases/lancium-breaks-ground-on-first-clean-campus-in-fort-stockton-texas-301377974.html"},"contracted":null,"under_construction":null,"energized":{"valueGw":0.025,"asOf":"2024-06-01T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://www.gem.wiki/Fort_Stockton_Clean_Campus"}}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Lancium Fort Stockton Clean Campus","url":"https://registry.deploy.report/datacenters/lancium-fort-stockton-clean-campus-texas","geo":{"@type":"GeoCoordinates","latitude":30.904473,"longitude":-102.9177867},"address":{"@type":"PostalAddress","addressLocality":"Fort Stockton"}}}