DEPLOY

Data center campus

EdgeCore Mesa (North Campus, Elliot Road Technology Corridor)

EdgeCore Mesa is an AI data center campus developed by EdgeCore Digital Infrastructure in Arizona, Mesa. 0.45 GW of capacity has been announced; 0.21 GW is energized. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Permitted · EdgeCore Digital Infrastructure · Private land · WECC · Mesa, Arizona, United States


Capacity: announced vs energized

Announced-to-energized gap: 0.24 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Promised online: 2026. Energized capacity is now on record. Claimed by EdgeCore Digital Infrastructure (source).

EdgeCore Mesa (North Campus, Elliot Road Technology Corridor) capacity claims
Source
Announced0.45 GW2025-05-21reportedcounty docket
Energized0.21 GW2025-05-20verifiedcompany filing

Key facts

permitted

Lifecycle

0.45 GW

Announced

0.21 GW

Energized

EdgeCore Digital Infrastructure

Developer

WECC

Grid

0.24 GW

Announced-to-energized gap

On the data center map

Every tracked data center is on this map, centered on EdgeCore Mesa. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

In clusterArizona(149)

The deal

developer
EdgeCore Digital Infrastructure
utility
Salt River Project (SRP) · Mesa/Eastmark corridor; specific service agreement not confirmed.

Power

Power source
grid
Grid operator
WECC
Interconnection

County water status: Extreme drought (D3) in Maricopa County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

EdgeCore Mesa sits on private land in Arizona, Mesa. It connects to the WECC grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States
FAA Proposed Rule: Enabling Supersonic Overland Flight (July 2026)operational restriction · 2026-07-02 · United States

Timeline

  1. Aug 2026
    capacity changed
    energized: unknown to 0.206
  2. Sep 2026
    Current: Permitted

Sources

1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is EdgeCore Mesa (North Campus, Elliot Road Technology Corridor)?
EdgeCore Mesa (North Campus, Elliot Road Technology Corridor) is an AI data center campus tracked on the DEPLOY registry, located in Mesa. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will EdgeCore Mesa (North Campus, Elliot Road Technology Corridor) use?
EdgeCore Mesa (North Campus, Elliot Road Technology Corridor) has 0.45 GW of announced capacity on the DEPLOY registry, of which 0.21 GW is recorded as energized, an announced-to-energized gap of 0.24 GW. Each figure is individually dated and sourced.
Who is building EdgeCore Mesa (North Campus, Elliot Road Technology Corridor)?
EdgeCore Digital Infrastructure is recorded as a party to EdgeCore Mesa (North Campus, Elliot Road Technology Corridor) on the DEPLOY registry.
Is EdgeCore Mesa (North Campus, Elliot Road Technology Corridor) operating yet?
As of the most recent verification on the DEPLOY registry, EdgeCore Mesa (North Campus, Elliot Road Technology Corridor) is permitted. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on EdgeCore Mesa (North Campus, Elliot Road Technology Corridor)?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track EdgeCore Mesa (North Campus, Elliot Road Technology Corridor) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). EdgeCore Mesa (North Campus, Elliot Road Technology Corridor): AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/edgecore-mesa-north-campus

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces