Microsoft Goodyear Data Center Campus (PHX70)

Microsoft Goodyear Data Center Campus is an AI data center campus developed by Microsoft Azure in Arizona, Goodyear. 0.26 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Partially energized · Microsoft Azure · Private land · WECC · Goodyear, Arizona, United States


Capacity: announced vs energized

Announced-to-energized gap: 0.26 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Promised online: 2027. 15 months away. Claimed by Blackridge Research project tracker (source).

Microsoft Goodyear Data Center Campus (PHX70) capacity claims
Source
Announced0.26 GW2025-06-01claimedtracker

Key facts

0.26 GW

Announced

0 GW

Energized

Microsoft Azure

Developer

WECC

Grid

0.26 GW

Announced-to-energized gap

On the data center map

Every tracked data center is on this map, centered on Microsoft Goodyear Data Center Campus. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

In clusterArizona(149)

The deal

operator
Microsoft Azure
utility
Arizona Public Service (APS)

Power

Power source
grid
Grid operator
WECC
Interconnection
Water
Microsoft committed ~$36M toward a ~$90M expansion of Goodyear wastewater treatment; targets ~42M gallons/yr water savings (tracker-reported). Sources conflict on total campus acreage (147-acre documented land parcel vs ~300-acre marketed campus).

County water status: Extreme drought (D3) in Maricopa County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Microsoft Goodyear Data Center Campus sits on private land in Arizona, Goodyear. It connects to the WECC grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States
FAA Proposed Rule: Enabling Supersonic Overland Flight (July 2026)operational restriction · 2026-07-02 · United States

Timeline

  1. Aug 2026
    capacity changed
    announced: unknown to 0.263
  2. Sep 2026
    Current: Partially energized

Sources

a1629c36-66b6-4b2a-b032-15c4882e56f5 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Microsoft Goodyear Data Center Campus (PHX70)?
Microsoft Goodyear Data Center Campus (PHX70) is an AI data center campus tracked on the DEPLOY registry, located in Goodyear. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will Microsoft Goodyear Data Center Campus (PHX70) use?
Microsoft Goodyear Data Center Campus (PHX70) has 0.26 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building Microsoft Goodyear Data Center Campus (PHX70)?
Microsoft Azure is recorded as a party to Microsoft Goodyear Data Center Campus (PHX70) on the DEPLOY registry.
Is Microsoft Goodyear Data Center Campus (PHX70) operating yet?
As of the most recent verification on the DEPLOY registry, Microsoft Goodyear Data Center Campus (PHX70) is partially energized. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Microsoft Goodyear Data Center Campus (PHX70)?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Microsoft Goodyear Data Center Campus (PHX70) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Microsoft Goodyear Data Center Campus (PHX70): AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/microsoft-goodyear-phx70

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.