# EdgeCore Mesa (North Campus, Elliot Road Technology Corridor)

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986
- **Type:** AI data center campus
- **Location:** Mesa, Arizona, United States
- **Lifecycle state:** permitted
- **Announced capacity (GW):** 0.45
- **Energized capacity (GW):** 0.206
- **Announced-to-energized gap (GW):** 0.244

## Capacity ledger (append-only, dated, sourced)

- announced: 0.45 GW · reported · as of 2025-05-21 · https://www.datacenterdynamics.com/en/news/edgecore-expands-mesa-data-center-campus-in-arizona/
- energized: 0.206 GW · verified · as of 2025-05-20 · https://edgecore.com/edgecore-digital-infrastructure-announces-expansion-of-its-metro-phoenix-data-center-market-to-over-450-mw/

## Parties


## Common questions


**What is EdgeCore Mesa (North Campus, Elliot Road Technology Corridor)?**

EdgeCore Mesa (North Campus, Elliot Road Technology Corridor) is an AI data center campus tracked on the DEPLOY registry, located in Mesa. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will EdgeCore Mesa (North Campus, Elliot Road Technology Corridor) use?**

EdgeCore Mesa (North Campus, Elliot Road Technology Corridor) has 0.45 GW of announced capacity on the DEPLOY registry, of which 0.21 GW is recorded as energized, an announced-to-energized gap of 0.24 GW. Each figure is individually dated and sourced.

**Is EdgeCore Mesa (North Campus, Elliot Road Technology Corridor) operating yet?**

As of the most recent verification on the DEPLOY registry, EdgeCore Mesa (North Campus, Elliot Road Technology Corridor) is permitted. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on EdgeCore Mesa (North Campus, Elliot Road Technology Corridor)?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- EdgeCore's massive data center campus in Mesa clears checkpoint: https://www.aztechcouncil.org/edgecore-data-center-mesa-planning-zoning/
- EdgeCore expands Mesa data center campus in Arizona: https://www.datacenterdynamics.com/en/news/edgecore-expands-mesa-data-center-campus-in-arizona/

Canonical: https://registry.deploy.report/datacenters/edgecore-mesa-north-campus
JSON: https://registry.deploy.report/v1/datacenters/edgecore-mesa-north-campus
