DEPLOY

Data center comparison

Project Blue vs EdgeCore Mesa

Announced-vs-energized capacity, lifecycle, developer, and location for two AI data center campuses, side by side and individually sourced.


Side by side

Project BlueEdgeCore Mesa
Announced capacity0.60 GW0.45 GW
Energized capacitynot recorded0.21 GW
Announced-to-energized gap0.60 GW0.24 GW
Lifecycleunder constructionpermitted
DeveloperBeale InfrastructureEdgeCore Digital Infrastructure
LocationTucson, Arizona, United StatesMesa, Arizona, United States
GridWECCWECC
Acreage290 acres84 acres

On the map

Common questions

Which is bigger, Project Blue or EdgeCore Mesa?
By announced capacity, Project Blue is larger: 0.60 GW versus 0.45 GW. Announced figures are claims, not built capacity.
Which is further along, Project Blue or EdgeCore Mesa?
Project Blue is under construction; EdgeCore Mesa is permitted. Energized capacity: not recorded versus 0.21 GW. DEPLOY tracks the announced-to-energized gap, so "further along" means more energized, not more announced.
Where are Project Blue and EdgeCore Mesa?
Project Blue is in Tucson, Arizona, United States; EdgeCore Mesa is in Mesa, Arizona, United States. Each record on DEPLOY is sourced and dated.

Compare more on the data center index or the national map. Announced numbers are claims, not built capacity; see the methodology.