Vermaland La Osa Data Center Park (Pinal County)

Vermaland La Osa Data Center Park is an AI data center campus developed by Vermaland, LLC in Arizona, Eloy. 1 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Rumored · Vermaland, LLC · greenfield · WECC · Eloy, Arizona, United States


Capacity: announced vs energized

Announced-to-energized gap: 1 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Vermaland La Osa Data Center Park (Pinal County) capacity claims
Source
Announced1 GW2026-05-01reportedjournalist report
Announced3 GW2025-09-01claimedcounty docket

Key facts

rumored

Lifecycle

1 GW

Announced

0 GW

Energized

Vermaland, LLC

Developer

WECC

Grid

1 GW

Announced-to-energized gap

On the data center map

Every tracked data center is on this map, centered on Vermaland La Osa Data Center Park. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.
The story of Vermaland La Osa Data Center Park (Pinal County)
Announced capex
$33B
Grid
WECC · A mix, with gas first and solar to follow: a gas-fired plant on 480 acres of the site provides initial power while the solar component is developed, alongside two large solar projects nearby and an application to the Arizona State Land Department for solar on state land. Of 3,374 acres, about 1,910 are for data centers and employment and 983 stay open space, against a ceiling of about 3 GW.
Derived
Cost per MW
$33M/MW

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterArizona(149)

The deal

developer
Vermaland, LLC · CEO Kuldip Verma; EPS Group Inc. civil engineer/planner.

Power

Power source
behind the meter gas
Grid operator
WECC
Interconnection
A mix, with gas first and solar to follow: a gas-fired plant on 480 acres of the site provides initial power while the solar component is developed, alongside two large solar projects nearby and an application to the Arizona State Land Department for solar on state land. Of 3,374 acres, about 1,910 are for data centers and employment and 983 stay open space, against a ceiling of about 3 GW.
Water
Site located along the Green Canal south of Eloy, Pinal County.

On-site gas-fired generation (~480 acres), gas, Announced. Behind-the-meter gas plant proposed as initial power; specific MW not stated.

La Osa on-site gas generation, gas, Announced. Originally two on-site natural-gas facilities plus utility-scale BESS; revised to a single gas-fired plant after the 80% scale-back. Pinal County land-use panel gave first recommendation to advance the rezone.

County water status: Severe drought (D2) in Pinal County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Vermaland La Osa Data Center Park sits on greenfield in Arizona, Eloy. It connects to the WECC grid, draws on behind the meter gas power, interconnection is A mix, with gas first and solar to follow: a gas-fired plant on 480 acres of the site provides initial power while the solar component is developed, alongside two large solar projects nearby and an application to the Arizona State Land Department for solar on state land. Of 3,374 acres, about 1,910 are for data centers and employment and 983 stay open space, against a ceiling of about 3 GW.. This siting summary is composed from the record's held fields, not speculation; see methodology.

Financial structure

Proposed total investment (~$33B)
$33B. Developer figure for the original full-scale La Osa proposal. tracker

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States
FAA Proposed Rule: Enabling Supersonic Overland Flight (July 2026)operational restriction · 2026-07-02 · United States

Timeline

  1. Aug 2026
    financial recorded
    capex: Proposed total investment (~$33B)
  2. Sep 2026
    Current: Rumored

Sources

7181d3aa-298b-4b24-8284-dac3c43239b6 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Vermaland La Osa Data Center Park (Pinal County)?
Vermaland La Osa Data Center Park (Pinal County) is an AI data center campus tracked on the DEPLOY registry, located in Eloy. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will Vermaland La Osa Data Center Park (Pinal County) use?
Vermaland La Osa Data Center Park (Pinal County) has 1 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building Vermaland La Osa Data Center Park (Pinal County)?
Vermaland, LLC is recorded as a party to Vermaland La Osa Data Center Park (Pinal County) on the DEPLOY registry.
Is Vermaland La Osa Data Center Park (Pinal County) operating yet?
As of the most recent verification on the DEPLOY registry, Vermaland La Osa Data Center Park (Pinal County) is rumored. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Vermaland La Osa Data Center Park (Pinal County)?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Vermaland La Osa Data Center Park (Pinal County) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Vermaland La Osa Data Center Park (Pinal County): AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/vermaland-la-osa-pinal

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces