Data center campus

QTS Phoenix 3 Campus (Glendale)

QTS Phoenix 3 Campus is an AI data center campus developed by QTS Data Centers in Arizona, Glendale. 0.75 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Permitted · QTS Data Centers · Private land · WECC · Glendale, Arizona, United States


Capacity: announced vs energized

Announced-to-energized gap: 0.75 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

QTS Phoenix 3 Campus (Glendale) capacity claims
Source
Announced0.75 GW2023-01-01reportedcounty docket

Key facts

permitted

Lifecycle

0.75 GW

Announced

0 GW

Energized

WECC

Grid

1

Facilities tracked

On the data center map

Every tracked data center is on this map, centered on QTS Phoenix 3 Campus. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.
The story of QTS Phoenix 3 Campus (Glendale)
Announced capex
$255M
Land owner
First Industrial Realty Trust
Derived
Cost per MW
$340K/MW

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterArizona(149)

The deal

financier
Blackstone
utility
Arizona Public Service (APS) · Glendale/Loop 303 corridor; service agreement not confirmed.
developer
QTS Data Centers · Owned by Blackstone.
land owner
First Industrial Realty Trust · Sold the 375-acre Glendale parcel to QTS in July 2022 for $255.3M

Power

Power source
grid
Grid operator
WECC
Interconnection

On-site ~29-acre substation, 0.75 GW grid interconnect, Announced. Dedicated substation planned to serve the campus.

County water status: Extreme drought (D3) in Maricopa County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

QTS Phoenix 3 Campus sits on private land in Arizona, Glendale. It connects to the WECC grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Financial structure

Land acquisition (375-acre parcel)
$255M. Purchased from First Industrial Realty Trust journalist report

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States
FAA Proposed Rule: Enabling Supersonic Overland Flight (July 2026)operational restriction · 2026-07-02 · United States

Facilities at this campus

Timeline

  1. Aug 2026
    party added
    land_owner: First Industrial Realty Trust
  2. Sep 2026
    Current: Permitted

Sources

65cc65ec-d466-4830-a24f-34926a4a9436 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is QTS Phoenix 3 Campus (Glendale)?
QTS Phoenix 3 Campus (Glendale) is an AI data center campus tracked on the DEPLOY registry, located in Glendale. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will QTS Phoenix 3 Campus (Glendale) use?
QTS Phoenix 3 Campus (Glendale) has 0.75 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building QTS Phoenix 3 Campus (Glendale)?
QTS Data Centers is recorded as a party to QTS Phoenix 3 Campus (Glendale) on the DEPLOY registry. The full party list, with each role, is on the record.
Is QTS Phoenix 3 Campus (Glendale) operating yet?
As of the most recent verification on the DEPLOY registry, QTS Phoenix 3 Campus (Glendale) is permitted. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on QTS Phoenix 3 Campus (Glendale)?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track QTS Phoenix 3 Campus (Glendale) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). QTS Phoenix 3 Campus (Glendale): AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/qts-phoenix-3-glendale

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces