Data center campus
QTS Phoenix 3 Campus (Glendale)
QTS Phoenix 3 Campus is an AI data center campus developed by QTS Data Centers in Arizona, Glendale. 0.75 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Permitted · QTS Data Centers · Private land · WECC · Glendale, Arizona, United States
Capacity: announced vs energized
Announced-to-energized gap: 0.75 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 0.75 GW | 2023-01-01 | reported | county docket |
Key facts
Lifecycle
Announced
Energized
Developer
Location
Grid
Land
Facilities tracked
On the data center map
Every tracked data center is on this map, centered on QTS Phoenix 3 Campus. Pan or zoom out to see how close rivals are building.
- Announced capex
- $255M
- Land owner
- First Industrial Realty Trust
- Cost per MW
- $340K/MW
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterArizona(149)
The deal
- financier
- Blackstone
- utility
- Arizona Public Service (APS) · Glendale/Loop 303 corridor; service agreement not confirmed.
- developer
- QTS Data Centers · Owned by Blackstone.
- land owner
- First Industrial Realty Trust · Sold the 375-acre Glendale parcel to QTS in July 2022 for $255.3M
Power
- Power source
- grid
- Grid operator
- WECC
- Interconnection
On-site ~29-acre substation, 0.75 GW grid interconnect, Announced. Dedicated substation planned to serve the campus.
County water status: Extreme drought (D3) in Maricopa County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
QTS Phoenix 3 Campus sits on private land in Arizona, Glendale. It connects to the WECC grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Financial structure
- Land acquisition (375-acre parcel)
- $255M. Purchased from First Industrial Realty Trust journalist report
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Facilities at this campus
- Phoenix 3hyperscale
Timeline
- Aug 2026party addedland_owner: First Industrial Realty Trust
- Sep 2026Current: Permitted
Sources
65cc65ec-d466-4830-a24f-34926a4a9436 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is QTS Phoenix 3 Campus (Glendale)?
How much power will QTS Phoenix 3 Campus (Glendale) use?
Who is building QTS Phoenix 3 Campus (Glendale)?
Is QTS Phoenix 3 Campus (Glendale) operating yet?
How verified is the data on QTS Phoenix 3 Campus (Glendale)?
Deploy Watch
Track QTS Phoenix 3 Campus (Glendale) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). QTS Phoenix 3 Campus (Glendale): AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/qts-phoenix-3-glendale
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/qts-phoenix-3-glendale.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/qts-phoenix-3-glendale
- Data documentation: /data
- Query this programmatically: Deploy MCP