Project Blue (Beale Infrastructure Pima County data center)

Project Blue is an AI data center campus developed by Beale Infrastructure in Arizona, Tucson. 0.60 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Under construction · Beale Infrastructure · greenfield · WECC · Tucson, Arizona, United States


Capacity: announced vs energized

Announced-to-energized gap: 0.60 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Promised online: 2027. 15 months away. Claimed by Beale Infrastructure (source).

Project Blue (Beale Infrastructure Pima County data center) capacity claims
Source
Announced0.60 GW2025-08-27reportedjournalist report
Contracted0.29 GW2025-12-05verifiedutility filing

Key facts

0.60 GW

Announced

0 GW

Energized

Beale Infrastructure

Developer

WECC

Grid

0.60 GW

Announced-to-energized gap

On the data center map

Every tracked data center is on this map, centered on Project Blue. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.
The story of Project Blue (Beale Infrastructure Pima County data center)
Announced capex
$3.6B
Land owner
Pima County
Derived
Cost per MW
$6M/MW

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterArizona(149)

The deal

developer
Beale Infrastructure · San Francisco-based; land purchaser entity Humphrey's Peak Properties.
utility
Tucson Electric Power (TEP) · ACC-approved delivery agreement 2025-12-05.
offtaker
Undisclosed · AWS reported original operator per 2023 county memo; never publicly confirmed and reportedly withdrew. Meta also rumored then reportedly out.
financier
Blue Owl Capital · Backer of Beale Infrastructure / Project Blue.
land owner
Pima County · Sold the ~290-acre parcel to Beale Infrastructure; transfer closed Dec 2025 after Board of Supervisors approval.

Power

Power source
grid
Grid operator
WECC
Interconnection
Water
Tucson City Council rejected annexation/city-water (2025-08-06); project proceeded on ~290 acres of unincorporated Pima County land immediately north of the Pima County Fairgrounds.

Tucson Electric Power grid interconnection, 0.29 GW grid interconnect, Announced. Grid-served via TEP (WECC); no on-site generation reported. ACC-approved.

County water status: Severe drought (D2) in Pima County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Project Blue sits on greenfield in Arizona, Tucson. It connects to the WECC grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Financial structure

Total planned investment (~$3.6B)
$3.6B journalist report

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States
FAA Proposed Rule: Enabling Supersonic Overland Flight (July 2026)operational restriction · 2026-07-02 · United States

Timeline

  1. Aug 2026
    party added
    land_owner: Pima County
  2. Sep 2026
    Current: Under construction

Sources

8232a60d-0da2-4f84-866f-abd7e82bfb0f · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Project Blue (Beale Infrastructure Pima County data center)?
Project Blue (Beale Infrastructure Pima County data center) is an AI data center campus tracked on the DEPLOY registry, located in Tucson. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will Project Blue (Beale Infrastructure Pima County data center) use?
Project Blue (Beale Infrastructure Pima County data center) has 0.60 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building Project Blue (Beale Infrastructure Pima County data center)?
Beale Infrastructure is recorded as a party to Project Blue (Beale Infrastructure Pima County data center) on the DEPLOY registry.
Is Project Blue (Beale Infrastructure Pima County data center) operating yet?
As of the most recent verification on the DEPLOY registry, Project Blue (Beale Infrastructure Pima County data center) is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Project Blue (Beale Infrastructure Pima County data center)?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Project Blue (Beale Infrastructure Pima County data center) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Project Blue (Beale Infrastructure Pima County data center): AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/beale-project-blue-pima

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces