PowerHouse 95 (Spotsylvania) Campus is an AI data center campus developed by PowerHouse Data Centers in Virginia, Spotsylvania County. 0.80 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Under construction · PowerHouse Data Centers · greenfield · PJM · Spotsylvania County, Virginia, United States


Capacity: announced vs energized

Announced-to-energized gap: 0.80 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

PowerHouse 95 (Spotsylvania) Campus capacity claims
Source
Announced0.80 GW2024-01-01reportedjournalist report
Under construction0.30 GW2025-10-01reportedjournalist report
Under construction0.15 GW2024-01-23verifiedpress release

Construction evidence

Dated satellite imagery of the site itself, oldest to newest, with the campus milestones that landed in each window. This is what the site looked like from orbit while announcements, permits, and energizations were dated into our ledger, so bare land, grading, and building mass tell their own story alongside the paper trail. Sentinel-2 true color, 10 m resolution, cloud-free scenes; click any frame to expand it.

Delivery paceAnnounced Q1 2024 · not yet energized

2018-07-08Contains modified Copernicus Sentinel data 2018
2020-08-26Contains modified Copernicus Sentinel data 2020
2022-06-29Contains modified Copernicus Sentinel data 2022
2024-09-09Contains modified Copernicus Sentinel data 2024
2025-06-03Contains modified Copernicus Sentinel data 2025

Dated Sentinel-2 imagery, gated to hand-verified site coordinates. Milestones synthesized from the campus's own capacity ledger, financial claims, and lifecycle events; each chip links to its source. How we source and verify it: satellite construction evidence.

Key facts

0.80 GW

Announced

0 GW

Energized

PowerHouse Data Centers

Developer

PJM

Grid

0.80 GW

Announced-to-energized gap

On the data center map

Every tracked data center is on this map, centered on PowerHouse 95 (Spotsylvania) Campus. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

In clusterVirginia(338)

The deal

financier
Harrison Street · Equity partner
utility
Dominion Energy · PJM interconnection
developer
PowerHouse Data Centers · Division of American Real Estate Partners (AREP)
developer
American Real Estate Partners · Parent of PowerHouse Data Centers; PowerHouse 95 is a joint venture with Harrison Street

Power

Power source
grid
Grid operator
PJM
Interconnection

Three 300MW utility substations, 0.90 GW grid interconnect, Permitted. Dominion/PJM interconnection via county-approved SUP

PowerHouse 95 first 300 MW substation, 0.30 GW grid, Under construction. First of three planned 300 MW substations; expected to deliver ~150 MW by Oct 2025

PowerHouse 95 substations 2 and 3 (300 MW each), 0.60 GW grid, Announced. Two additional 300 MW substations planned to reach up to 800 MW total

The PJM grid demand right now: 71.7 GW (EIA-930, 2026-09-27 10:00). PowerHouse 95 (Spotsylvania) Campus's announced 0.80 GW would be 1.1% of the grid's current load.

County water status: No drought in Spotsylvania County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

PowerHouse 95 (Spotsylvania) Campus sits on greenfield in Virginia, Spotsylvania County. It connects to the PJM grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States

Timeline

  1. Aug 2026
    party added
    developer: American Real Estate Partners
  2. Sep 2026
    Current: Under construction

Sources

329e5c3e-67ac-40a4-80bb-61e67065a8f4 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is PowerHouse 95 (Spotsylvania) Campus?
PowerHouse 95 (Spotsylvania) Campus is an AI data center campus tracked on the DEPLOY registry, located in Spotsylvania County. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will PowerHouse 95 (Spotsylvania) Campus use?
PowerHouse 95 (Spotsylvania) Campus has 0.80 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building PowerHouse 95 (Spotsylvania) Campus?
PowerHouse Data Centers is recorded as a party to PowerHouse 95 (Spotsylvania) Campus on the DEPLOY registry.
Is PowerHouse 95 (Spotsylvania) Campus operating yet?
As of the most recent verification on the DEPLOY registry, PowerHouse 95 (Spotsylvania) Campus is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on PowerHouse 95 (Spotsylvania) Campus?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track PowerHouse 95 (Spotsylvania) Campus on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). PowerHouse 95 (Spotsylvania) Campus: AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/powerhouse-95-spotsylvania-virginia

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces