Data center campus

STACK Stafford Technology Campus

STACK Stafford Technology Campus is an AI data center campus developed by STACK Infrastructure in Virginia, Stafford. 1.10 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Permitted · STACK Infrastructure · greenfield · PJM · Stafford, Virginia, United States


Capacity: announced vs energized

Announced-to-energized gap: 1.10 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

STACK Stafford Technology Campus capacity claims
Source
Announced1.10 GW2025-01-16reportedpress release

Key facts

permitted

Lifecycle

1.10 GW

Announced

0 GW

Energized

STACK Infrastructure

Developer

PJM

Grid

1.10 GW

Announced-to-energized gap

On the data center map

Every tracked data center is on this map, centered on STACK Stafford Technology Campus. Pan or zoom out to see how close rivals are building.

Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.

Free to use on your site, with a link back to DEPLOY.

In clusterVirginia(338)

The deal

developer
STACK Infrastructure
utility
Dominion Energy · six 300 MW substations committed

Power

Power source
grid
Grid operator
PJM
Interconnection
Water
Reclaimed water system for industrial cooling; project funds water/sewer upgrades eliminating $58M from Stafford County's Capital Improvement Program

The PJM grid demand right now: 82.8 GW (EIA-930, 2026-09-27 18:00). STACK Stafford Technology Campus's announced 1.10 GW would be 1.3% of the grid's current load.

County water status: Abnormally dry (D0) in Stafford County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

STACK Stafford Technology Campus sits on greenfield in Virginia, Stafford. It connects to the PJM grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States

Investment, workforce and specs

Construction jobs
Over 1,000 construction jobs at peak development source
Permanent jobs
Hundreds of full-time permanent positions source
Tax incentive
~$80M projected annual tax revenue to Stafford County at full buildout source

Timeline

  1. Aug 2026
    party added
    utility: Dominion Energy
  2. Sep 2026
    Current: Permitted

Sources

01bdc2de-ec3c-4d49-ab28-d2032658ed62 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is STACK Stafford Technology Campus?
STACK Stafford Technology Campus is an AI data center campus tracked on the DEPLOY registry, located in Stafford. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will STACK Stafford Technology Campus use?
STACK Stafford Technology Campus has 1.10 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building STACK Stafford Technology Campus?
STACK Infrastructure is recorded as a party to STACK Stafford Technology Campus on the DEPLOY registry.
Is STACK Stafford Technology Campus operating yet?
As of the most recent verification on the DEPLOY registry, STACK Stafford Technology Campus is permitted. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on STACK Stafford Technology Campus?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track STACK Stafford Technology Campus on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). STACK Stafford Technology Campus: AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/stack-stafford-technology-campus-virginia

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces