# PowerHouse 95 (Spotsylvania) Campus

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 329e5c3e-67ac-40a4-80bb-61e67065a8f4
- **Type:** AI data center campus
- **Location:** Spotsylvania County, Virginia, United States
- **Lifecycle state:** under_construction
- **Announced capacity (GW):** 0.8

## Capacity ledger (append-only, dated, sourced)

- announced: 0.8 GW · reported · as of 2024-01-01 · https://www.datacenterdynamics.com/en/news/powerhouse-breaks-ground-on-800mw-data-center-campus-in-spotsylvania-county-virginia/
- under_construction: 0.3 GW · reported · as of 2025-10-01 · https://www.datacenterdynamics.com/en/news/powerhouse-breaks-ground-on-800mw-data-center-campus-in-spotsylvania-county-virginia/
- under_construction: 0.15 GW · verified · as of 2024-01-23 · https://www.powerhousedata.com/news/powerhouse-data-centers-closes-on-site-of-800-mw-data-center-campus-in-spotsylvania-virginia

## Parties


## Common questions


**What is PowerHouse 95 (Spotsylvania) Campus?**

PowerHouse 95 (Spotsylvania) Campus is an AI data center campus tracked on the DEPLOY registry, located in Spotsylvania County. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will PowerHouse 95 (Spotsylvania) Campus use?**

PowerHouse 95 (Spotsylvania) Campus has 0.80 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.

**Is PowerHouse 95 (Spotsylvania) Campus operating yet?**

As of the most recent verification on the DEPLOY registry, PowerHouse 95 (Spotsylvania) Campus is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on PowerHouse 95 (Spotsylvania) Campus?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- Special Use Permit (SUP) Cases: https://www.spotsylvania.va.us/800/SUP-Cases
- PowerHouse breaks ground on 800MW data center campus in Spotsylvania County: https://www.datacenterdynamics.com/en/news/powerhouse-breaks-ground-on-800mw-data-center-campus-in-spotsylvania-county-virginia/
- PowerHouse Data Centers closes on site of 800 MW campus in Spotsylvania: https://www.powerhousedata.com/news/powerhouse-data-centers-closes-on-site-of-800-mw-data-center-campus-in-spotsylvania-virginia

Canonical: https://registry.deploy.report/datacenters/powerhouse-95-spotsylvania-virginia
JSON: https://registry.deploy.report/v1/datacenters/powerhouse-95-spotsylvania-virginia