{"id":"329e5c3e-67ac-40a4-80bb-61e67065a8f4","slug":"powerhouse-95-spotsylvania-virginia","name":"PowerHouse 95 (Spotsylvania) Campus","aliases":["PowerHouse 95","Spotsylvania data center campus","PowerHouse Spotsylvania 800MW"],"locationId":"2e64de15-4201-4f83-9f63-5a3cc4511982","lat":38.22318,"lng":-77.48282,"locationPrecision":"exact","landStatus":"greenfield","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"PJM","waterSourceNotes":null,"servingUtility":null,"acreage":145,"totalBuildingSqft":null,"streetAddress":null,"notes":"PowerHouse Data Centers (a division of American Real Estate Partners) campus along the I-95 corridor in Spotsylvania County, up to 800 MW delivered via three 300 MW substations, with up to eight three-story buildings totaling ~3.5M sq ft. First 300 MW substation targeted for October 2025. Backed by a county Special Use Permit docket; grid served by Dominion Energy/PJM. Offtaker/tenant is not publicly disclosed and later-phase MW timing is not fixed.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.spotsylvania.va.us/800/SUP-Cases","date":"2024-01-01","title":"Special Use Permit (SUP) Cases","publisher":"Spotsylvania County, VA"},{"url":"https://www.datacenterdynamics.com/en/news/powerhouse-breaks-ground-on-800mw-data-center-campus-in-spotsylvania-county-virginia/","date":"2024-01-01","title":"PowerHouse breaks ground on 800MW data center campus in Spotsylvania County","publisher":"DataCenterDynamics"},{"url":"https://www.powerhousedata.com/news/powerhouse-data-centers-closes-on-site-of-800-mw-data-center-campus-in-spotsylvania-virginia","date":"2023-01-01","title":"PowerHouse Data Centers closes on site of 800 MW campus in Spotsylvania","publisher":"PowerHouse Data Centers"}],"reviewNote":null,"createdAt":"2026-08-17T20:23:23.992Z","updatedAt":"2026-08-28T17:30:17.268Z","location":{"id":"2e64de15-4201-4f83-9f63-5a3cc4511982","name":"Spotsylvania County","slug":"spotsylvania-county-virginia","kind":"city","parentLocationId":"a0d3f9da-875c-4c6e-bdca-3be94155e191","region":"Virginia","lat":38.1880936,"lng":-77.6741751,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T20:23:23.610Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"efd73aea-ee37-4cf0-9475-942e2ea09f9d","dataCenterId":"329e5c3e-67ac-40a4-80bb-61e67065a8f4","companyId":null,"externalName":"Harrison Street","role":"financier","structureNotes":"Equity partner","createdAt":"2026-08-17T20:23:27.213Z","company":null},{"id":"9a3979fa-f180-409c-adef-a2c15a592888","dataCenterId":"329e5c3e-67ac-40a4-80bb-61e67065a8f4","companyId":null,"externalName":"Dominion Energy","role":"utility","structureNotes":"PJM interconnection","createdAt":"2026-08-17T20:23:27.982Z","company":null},{"id":"3dfc97b8-a1e9-4f92-9cb0-13925f630f46","dataCenterId":"329e5c3e-67ac-40a4-80bb-61e67065a8f4","companyId":null,"externalName":"PowerHouse Data Centers","role":"developer","structureNotes":"Division of American Real Estate Partners (AREP)","createdAt":"2026-08-17T20:23:26.460Z","company":null},{"id":"c15f7071-458a-4006-b675-a8b29bb48ba4","dataCenterId":"329e5c3e-67ac-40a4-80bb-61e67065a8f4","companyId":null,"externalName":"American Real Estate Partners","role":"developer","structureNotes":"Parent of PowerHouse Data Centers; PowerHouse 95 is a joint venture with Harrison Street","createdAt":"2026-08-19T00:15:59.869Z","company":null}],"capacityClaims":[{"id":"5fd36a42-c05b-44d7-a929-f524c8b5a7a3","dataCenterId":"329e5c3e-67ac-40a4-80bb-61e67065a8f4","series":"announced","valueGw":0.8,"asOf":"2024-01-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/powerhouse-breaks-ground-on-800mw-data-center-campus-in-spotsylvania-county-virginia/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Up to 800 MW across three 300 MW substations, 8 buildings","createdAt":"2026-08-17T20:23:24.685Z"},{"id":"ce9a8c2a-e74b-4afc-9538-85a0ff13e78d","dataCenterId":"329e5c3e-67ac-40a4-80bb-61e67065a8f4","series":"under_construction","valueGw":0.3,"asOf":"2025-10-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/powerhouse-breaks-ground-on-800mw-data-center-campus-in-spotsylvania-county-virginia/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"First 300 MW substation targeted live Oct 2025","createdAt":"2026-08-17T20:23:25.545Z"},{"id":"22e65a16-51f0-49e6-ad9f-3c6eab0e16be","dataCenterId":"329e5c3e-67ac-40a4-80bb-61e67065a8f4","series":"under_construction","valueGw":0.15,"asOf":"2024-01-23T00:00:00.000Z","sourceUrl":"https://www.powerhousedata.com/news/powerhouse-data-centers-closes-on-site-of-800-mw-data-center-campus-in-spotsylvania-virginia","sourceType":"press_release","evidenceTier":"verified","supersedesId":null,"note":"First substation under development, ~150 MW targeted by October 2025","createdAt":"2026-08-19T00:15:58.153Z"}],"financialClaims":[],"metricClaims":[],"powerProjects":[{"id":"34d500b6-8b60-4408-94de-ed43543a8d9c","dataCenterId":"329e5c3e-67ac-40a4-80bb-61e67065a8f4","name":"Three 300MW utility substations","type":"grid_interconnect","capacityGw":0.9,"lifecycleState":"permitted","sourceUrl":"https://www.spotsylvania.va.us/800/SUP-Cases","evidenceTier":"reported","note":"Dominion/PJM interconnection via county-approved SUP","createdAt":"2026-08-17T20:23:26.080Z"},{"id":"2e5e43d7-e398-490d-8aaf-14f0afceed81","dataCenterId":"329e5c3e-67ac-40a4-80bb-61e67065a8f4","name":"PowerHouse 95 first 300 MW substation","type":"grid","capacityGw":0.3,"lifecycleState":"under_construction","sourceUrl":"https://www.powerhousedata.com/news/powerhouse-data-centers-closes-on-site-of-800-mw-data-center-campus-in-spotsylvania-virginia","evidenceTier":"verified","note":"First of three planned 300 MW substations; expected to deliver ~150 MW by Oct 2025","createdAt":"2026-08-19T00:15:58.709Z"},{"id":"6ba85898-2e0a-418d-83c1-c34b01c364a6","dataCenterId":"329e5c3e-67ac-40a4-80bb-61e67065a8f4","name":"PowerHouse 95 substations 2 and 3 (300 MW each)","type":"grid","capacityGw":0.6,"lifecycleState":"announced","sourceUrl":"https://www.prnewswire.com/news-releases/powerhouse-data-centers-closes-on-site-of-800-mw-data-center-campus-in-spotsylvania-virginia-302041246.html","evidenceTier":"verified","note":"Two additional 300 MW substations planned to reach up to 800 MW total","createdAt":"2026-08-19T00:15:59.093Z"}],"facilities":[],"incidents":[],"events":[{"id":"aba7bfbd-395b-467b-95e0-690007e793e6","dataCenterId":"329e5c3e-67ac-40a4-80bb-61e67065a8f4","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: American Real Estate Partners","occurredAt":"2026-08-19T00:16:00.256Z","createdAt":"2026-08-19T00:16:00.256Z"},{"id":"5ce2b0de-e88b-4663-805b-dd05b2616c3c","dataCenterId":"329e5c3e-67ac-40a4-80bb-61e67065a8f4","eventType":"capacity_changed","series":"under_construction","oldValue":"0.3","newValue":"0.15","claimId":"22e65a16-51f0-49e6-ad9f-3c6eab0e16be","detail":null,"occurredAt":"2026-08-19T00:15:58.458Z","createdAt":"2026-08-19T00:15:58.458Z"},{"id":"6ae749b9-d265-40bb-895e-ca553158ba6a","dataCenterId":"329e5c3e-67ac-40a4-80bb-61e67065a8f4","eventType":"claim_recorded","series":"under_construction","oldValue":null,"newValue":"0.15","claimId":"22e65a16-51f0-49e6-ad9f-3c6eab0e16be","detail":"verified · press_release","occurredAt":"2026-08-19T00:15:58.305Z","createdAt":"2026-08-19T00:15:58.305Z"},{"id":"5747968e-38b8-478a-bbd8-bd14cbec2955","dataCenterId":"329e5c3e-67ac-40a4-80bb-61e67065a8f4","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Dominion Energy","occurredAt":"2026-08-17T20:23:28.357Z","createdAt":"2026-08-17T20:23:28.357Z"},{"id":"03e7ab32-a1e1-4779-9c9f-97591a7034ff","dataCenterId":"329e5c3e-67ac-40a4-80bb-61e67065a8f4","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"financier: Harrison Street","occurredAt":"2026-08-17T20:23:27.598Z","createdAt":"2026-08-17T20:23:27.598Z"},{"id":"c455fc9e-bb6f-4e15-8192-d56d6ab9dce2","dataCenterId":"329e5c3e-67ac-40a4-80bb-61e67065a8f4","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: PowerHouse Data Centers","occurredAt":"2026-08-17T20:23:26.837Z","createdAt":"2026-08-17T20:23:26.837Z"},{"id":"391478f5-6c60-48fa-a654-94d890ad0871","dataCenterId":"329e5c3e-67ac-40a4-80bb-61e67065a8f4","eventType":"capacity_changed","series":"under_construction","oldValue":null,"newValue":"0.3","claimId":"ce9a8c2a-e74b-4afc-9538-85a0ff13e78d","detail":null,"occurredAt":"2026-08-17T20:23:25.850Z","createdAt":"2026-08-17T20:23:25.850Z"},{"id":"56667cf3-e4c9-4f38-a1ac-8c834cd5db98","dataCenterId":"329e5c3e-67ac-40a4-80bb-61e67065a8f4","eventType":"claim_recorded","series":"under_construction","oldValue":null,"newValue":"0.3","claimId":"ce9a8c2a-e74b-4afc-9538-85a0ff13e78d","detail":"reported · journalist_report","occurredAt":"2026-08-17T20:23:25.699Z","createdAt":"2026-08-17T20:23:25.699Z"},{"id":"b5f034f7-2dc3-40b1-93e7-440b6f568058","dataCenterId":"329e5c3e-67ac-40a4-80bb-61e67065a8f4","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.8","claimId":"5fd36a42-c05b-44d7-a929-f524c8b5a7a3","detail":null,"occurredAt":"2026-08-17T20:23:24.993Z","createdAt":"2026-08-17T20:23:24.993Z"},{"id":"fe3bca11-d004-442a-b676-be86e3d51ef2","dataCenterId":"329e5c3e-67ac-40a4-80bb-61e67065a8f4","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.8","claimId":"5fd36a42-c05b-44d7-a929-f524c8b5a7a3","detail":"reported · journalist_report","occurredAt":"2026-08-17T20:23:24.838Z","createdAt":"2026-08-17T20:23:24.838Z"}],"capacity_picture":{"announced_gw":0.8,"contracted_gw":null,"under_construction_gw":0.15,"energized_gw":null,"announced_minus_energized_gw":0.8,"by_series":{"announced":{"valueGw":0.8,"asOf":"2024-01-01T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.datacenterdynamics.com/en/news/powerhouse-breaks-ground-on-800mw-data-center-campus-in-spotsylvania-county-virginia/"},"contracted":null,"under_construction":{"valueGw":0.15,"asOf":"2024-01-23T00:00:00.000Z","evidenceTier":"verified","sourceUrl":"https://www.powerhousedata.com/news/powerhouse-data-centers-closes-on-site-of-800-mw-data-center-campus-in-spotsylvania-virginia"},"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"PowerHouse 95 (Spotsylvania) Campus","url":"https://registry.deploy.report/datacenters/powerhouse-95-spotsylvania-virginia","geo":{"@type":"GeoCoordinates","latitude":38.22318,"longitude":-77.48282},"address":{"@type":"PostalAddress","addressLocality":"Spotsylvania County"}}}