Data center campus
Voltage Park Ashburn
Voltage Park Ashburn is a tracked AI data center campus in Virginia, Ashburn. East-coast H100 pod, part of the 6-DC / 4-state footprint
Capacity: announced vs energized
| Source |
|---|
Key facts
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Operator portfolio (company-claimed)
- Six Tier 3+ US data centers in four states; about 24,000 NVIDIA H100 GPUs.
- Hardware (company-claimed)
- NVIDIA HGX H100 on Dell PowerEdge XE9680; InfiniBand up to 3200 Gbps.
- City naming (unconfirmed)
- Voltage Park's public pages do not list Ashburn by name.
On the data center map
Every tracked data center is on this map, centered on Voltage Park Ashburn. Pan or zoom out to see how close rivals are building.
In clusterVirginia(342)
The deal
- developer
- Voltage Park
Power
- Power source
- grid
- Interconnection
County water status: Abnormally dry (D0) in Loudoun County, week of 2026-11-03 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Voltage Park Ashburn is in Virginia, Ashburn. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Sources
7a2e5832-8d23-49ea-b73f-d9eedfb3fcb4 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Voltage Park Ashburn?
Who is building Voltage Park Ashburn?
Is Voltage Park Ashburn operating yet?
How verified is the data on Voltage Park Ashburn?
Deploy Watch
Track Voltage Park Ashburn on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Voltage Park Ashburn: AI data center campus record. Retrieved November 11, 2026, from https://registry.deploy.report/datacenters/voltage-park-ashburn
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/voltage-park-ashburn.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/voltage-park-ashburn
- Data documentation: /data
- Query this programmatically: Deploy MCP