Prince William Digital Gateway is an AI data center campus developed by Compass Datacenters in Virginia, Gainesville. 1.70 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Cancelled · Compass Datacenters · greenfield · PJM · Gainesville, Virginia, United States
Capacity: announced vs energized
Announced-to-energized gap: 1.70 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 1.70 GW | 2025-01-01 | reported | press release |
Key facts
Lifecycle
Announced
Energized
Developer
Location
Grid
Land
Announced-to-energized gap
On the data center map
Every tracked data center is on this map, centered on Prince William Digital Gateway. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
- Grid
- PJM · Blocked upstream of any connection: a court voided the rezoning in August 2025 because the county failed to meet public notice rules under state law and its own ordinance, and on 1 April 2026 the Virginia Court of Appeals upheld that. Until the land-use approval is restored there is nothing to connect.
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterVirginia(338)
The deal
- utility
- Dominion Energy
- developer
- Compass Datacenters · H&H Capital Acquisitions; Brookfield/Ontario Teachers'-backed
- financier
- Blackstone · Owner of QTS; QTS petitioner entity was GW Acquisition Co.
- developer
- QTS Data Centers · GW Acquisition Co.; Blackstone-owned
Power
- Power source
- grid
- Grid operator
- PJM
- Interconnection
- Blocked upstream of any connection: a court voided the rezoning in August 2025 because the county failed to meet public notice rules under state law and its own ordinance, and on 1 April 2026 the Virginia Court of Appeals upheld that. Until the land-use approval is restored there is nothing to connect.
- Water
- Potable public supply, with no closed-loop requirement. Prince William Water draws from the Potomac and the Occoquan Reservoir through Fairfax Water, plus a small amount from Lake Manassas. The county has no reclaimed water facilities, so every data center in it runs on drinking water; neighbouring Fauquier mandates closed-loop cooling and Prince William does not. Across the county data centers take about 4 percent of average daily demand and about 10 percent at peak, more than 4.6 million gallons in a single day. The campus itself has no published figure.
The PJM grid demand right now: 71.7 GW (EIA-930, 2026-09-27 10:00). Prince William Digital Gateway's announced 1.70 GW would be 2.4% of the grid's current load.
County water status: Abnormally dry (D0) in Prince William County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Prince William Digital Gateway sits on greenfield in Virginia, Gainesville. It connects to the PJM grid, draws on grid power, interconnection is Blocked upstream of any connection: a court voided the rezoning in August 2025 because the county failed to meet public notice rules under state law and its own ordinance, and on 1 April 2026 the Virginia Court of Appeals upheld that. Until the land-use approval is restored there is nothing to connect.. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Timeline
- Aug 2026party addedfinancier: Blackstone
- Sep 2026Current: Cancelled
Sources
- Prince William Digital Gateway data center project officially dies
- Judge rules zoning for PW Digital Gateway data center campus in Virginia voided
- Virginia Appeals Court upholds block on Prince William Digital Gateway project · Virginia Business
- Perfect storm: Drought, data centers and NDAs · Prince William Times
acd089aa-28ba-4d61-a840-e48de31172eb · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Prince William Digital Gateway (QTS + Compass)?
How much power will Prince William Digital Gateway (QTS + Compass) use?
Who is building Prince William Digital Gateway (QTS + Compass)?
Is Prince William Digital Gateway (QTS + Compass) operating yet?
How verified is the data on Prince William Digital Gateway (QTS + Compass)?
Deploy Watch
Track Prince William Digital Gateway (QTS + Compass) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Prince William Digital Gateway (QTS + Compass): AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/prince-william-digital-gateway-virginia
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/prince-william-digital-gateway-virginia.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/prince-william-digital-gateway-virginia
- Data documentation: /data
- Query this programmatically: Deploy MCP