Data center campus

Prince William Digital Gateway (QTS + Compass)

Prince William Digital Gateway is an AI data center campus developed by Compass Datacenters in Virginia, Gainesville. 1.70 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Cancelled · Compass Datacenters · greenfield · PJM · Gainesville, Virginia, United States


Capacity: announced vs energized

Announced-to-energized gap: 1.70 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Prince William Digital Gateway (QTS + Compass) capacity claims
Source
Announced1.70 GW2025-01-01reportedpress release

Key facts

cancelled

Lifecycle

1.70 GW

Announced

0 GW

Energized

PJM

Grid

1.70 GW

Announced-to-energized gap

On the data center map

Every tracked data center is on this map, centered on Prince William Digital Gateway. Pan or zoom out to see how close rivals are building.

Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.

Free to use on your site, with a link back to DEPLOY.
The story of Prince William Digital Gateway (QTS + Compass)
Grid
PJM · Blocked upstream of any connection: a court voided the rezoning in August 2025 because the county failed to meet public notice rules under state law and its own ordinance, and on 1 April 2026 the Virginia Court of Appeals upheld that. Until the land-use approval is restored there is nothing to connect.

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterVirginia(338)

The deal

utility
Dominion Energy
developer
Compass Datacenters · H&H Capital Acquisitions; Brookfield/Ontario Teachers'-backed
financier
Blackstone · Owner of QTS; QTS petitioner entity was GW Acquisition Co.
developer
QTS Data Centers · GW Acquisition Co.; Blackstone-owned

Power

Power source
grid
Grid operator
PJM
Interconnection
Blocked upstream of any connection: a court voided the rezoning in August 2025 because the county failed to meet public notice rules under state law and its own ordinance, and on 1 April 2026 the Virginia Court of Appeals upheld that. Until the land-use approval is restored there is nothing to connect.
Water
Potable public supply, with no closed-loop requirement. Prince William Water draws from the Potomac and the Occoquan Reservoir through Fairfax Water, plus a small amount from Lake Manassas. The county has no reclaimed water facilities, so every data center in it runs on drinking water; neighbouring Fauquier mandates closed-loop cooling and Prince William does not. Across the county data centers take about 4 percent of average daily demand and about 10 percent at peak, more than 4.6 million gallons in a single day. The campus itself has no published figure.

The PJM grid demand right now: 71.7 GW (EIA-930, 2026-09-27 10:00). Prince William Digital Gateway's announced 1.70 GW would be 2.4% of the grid's current load.

County water status: Abnormally dry (D0) in Prince William County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Prince William Digital Gateway sits on greenfield in Virginia, Gainesville. It connects to the PJM grid, draws on grid power, interconnection is Blocked upstream of any connection: a court voided the rezoning in August 2025 because the county failed to meet public notice rules under state law and its own ordinance, and on 1 April 2026 the Virginia Court of Appeals upheld that. Until the land-use approval is restored there is nothing to connect.. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States

Timeline

  1. Aug 2026
    party added
    financier: Blackstone
  2. Sep 2026
    Current: Cancelled

Sources

acd089aa-28ba-4d61-a840-e48de31172eb · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Prince William Digital Gateway (QTS + Compass)?
Prince William Digital Gateway (QTS + Compass) is an AI data center campus tracked on the DEPLOY registry, located in Gainesville. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will Prince William Digital Gateway (QTS + Compass) use?
Prince William Digital Gateway (QTS + Compass) has 1.70 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building Prince William Digital Gateway (QTS + Compass)?
Compass Datacenters is recorded as a party to Prince William Digital Gateway (QTS + Compass) on the DEPLOY registry. The full party list, with each role, is on the record.
Is Prince William Digital Gateway (QTS + Compass) operating yet?
As of the most recent verification on the DEPLOY registry, Prince William Digital Gateway (QTS + Compass) is cancelled. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Prince William Digital Gateway (QTS + Compass)?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Prince William Digital Gateway (QTS + Compass) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Prince William Digital Gateway (QTS + Compass): AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/prince-william-digital-gateway-virginia

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces