Data center campus
GW Ranch (Pacifico Energy)
GW Ranch is an AI data center campus developed by Pacifico Energy in Texas, Fort Stockton. 1 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Permitted · Pacifico Energy · Private land · ERCOT · Fort Stockton, Texas, United States
Capacity: announced vs energized
Announced-to-energized gap: 1 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
Promised online: 2027. 15 months away. Claimed by Pacifico Energy (source).
| Source | ||||
|---|---|---|---|---|
| Announced | 1 GW | 2027-06-01 | reported | press release |
| Announced | 7.65 GW | 2026-01-30 | reported | press release |
| Announced | 5 GW | 2026-01-26 | reported | press release |
Construction evidence
Dated satellite imagery of the site itself, oldest to newest, with the campus milestones that landed in each window. This is what the site looked like from orbit while announcements, permits, and energizations were dated into our ledger, so bare land, grading, and building mass tell their own story alongside the paper trail. Sentinel-2 true color, 10 m resolution, cloud-free scenes; click any frame to expand it.
Delivery paceAnnounced Q2 2027 · not yet energized
Dated Sentinel-2 imagery, gated to hand-verified site coordinates. Milestones synthesized from the campus's own capacity ledger, financial claims, and lifecycle events; each chip links to its source. How we source and verify it: satellite construction evidence.
Key facts
Lifecycle
Announced
Energized
Pacifico Energy
Developer
Location
Grid
Land
Announced-to-energized gap
On the data center map
Every tracked data center is on this map, centered on GW Ranch. Pan or zoom out to see how close rivals are building.
- Grid
- ERCOT · Off grid by design: no ERCOT interconnection. The campus runs as a private grid, and the air permit authorises generation that serves only the on-site load, with no ability to sell power to or draw power from the local utility system.
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterTexas(607)
The deal
- developer
- Pacifico Energy · Permit holder Pacifico GW LLC
- utility
- Pacifico Energy · Owns/operates private island grid
Power
- Power source
- mixed
- Grid operator
- ERCOT
- Interconnection
- Off grid by design: no ERCOT interconnection. The campus runs as a private grid, and the air permit authorises generation that serves only the on-site load, with no ability to sell power to or draw power from the local utility system.
- Water
- Self-supplying, per the developer. Pacifico says the power generation system is self-sufficient and will itself produce water the data center can use. Local coverage notes the general move to closed-loop cooling, which still needs a large volume on initial fill and periodic refills. No water source, volume or permit figure has been published for the campus.
GW Ranch gas generation, 7.65 GW gas, Announced. TCEQ air permit issued for up to 7.65 GW gas turbines
GW Ranch gas-fired generation, 7.65 GW gas, Permitted. Gas capacity authorized by TCEQ air permit; fed by dedicated high-capacity pipeline to the Waha Hub in the Permian Basin.
GW Ranch battery energy storage, 1.80 GW storage, Announced. 1.8 GW battery energy storage.
GW Ranch solar, 0.75 GW solar, Announced. 750 MWac solar generation.
The Texas (ERCOT) grid demand right now: 54.4 GW (EIA-930, 2026-09-27 08:00). GW Ranch's announced 1 GW would be 1.8% of the grid's current load.
County water status: Moderate drought (D1) in Pecos County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
GW Ranch sits on private land in Texas, Fort Stockton. It connects to the ERCOT grid, draws on mixed power, interconnection is Off grid by design: no ERCOT interconnection. The campus runs as a private grid, and the air permit authorises generation that serves only the on-site load, with no ability to sell power to or draw power from the local utility system.. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Timeline
- Aug 2026capacity changedannounced: 7.65 to 1
- Sep 2026Current: Permitted
Sources
- Pacifico Energy Secures 7.65 GW Power Generation Permit for GW Ranch Project
- Country's Largest Air Pollution Permit Issued to Power Plant for Data Centers in West Texas
- Preliminary Determination Summary — Pacifico GW LLC
- GW Ranch Energy Center · Global Energy Monitor
- Pacifico unveils 5 GW off-grid Texas power for data centers · EnergyTech
- Amazon acquires 8,000-acre site in Pecos, Texas, for natural gas powered behind-the-meter data center · Data Center Dynamics
- Massive AI data center coming to Pecos County · Big Bend Sentinel
33c65299-63d4-4b41-8137-93839680e5f3 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is GW Ranch (Pacifico Energy)?
How much power will GW Ranch (Pacifico Energy) use?
Who is building GW Ranch (Pacifico Energy)?
Is GW Ranch (Pacifico Energy) operating yet?
How verified is the data on GW Ranch (Pacifico Energy)?
Deploy Watch
Track GW Ranch (Pacifico Energy) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). GW Ranch (Pacifico Energy): AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/pacifico-gw-ranch-pecos-texas
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/pacifico-gw-ranch-pecos-texas.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/pacifico-gw-ranch-pecos-texas
- Data documentation: /data
- Query this programmatically: Deploy MCP