# GW Ranch (Pacifico Energy)

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 33c65299-63d4-4b41-8137-93839680e5f3
- **Type:** AI data center campus
- **Location:** Fort Stockton, Texas, United States
- **Lifecycle state:** permitted
- **Announced capacity (GW):** 1

## Capacity ledger (append-only, dated, sourced)

- announced: 1 GW · reported · as of 2027-06-01 · https://www.constructionowners.com/news/pacifico-energy-wins-permit-for-7-65-gw-gw-ranch-power-campus-in-texas
- announced: 7.65 GW · reported · as of 2026-01-30 · https://www.businesswire.com/news/home/20260126236053/en/Pacifico-Energy-Secures-7.65-GW-Power-Generation-Permit-for-GW-Ranch-Project
- announced: 5 GW · reported · as of 2026-01-26 · https://www.pacificoenergy.com/gw-ranch

## Parties


## Common questions


**What is GW Ranch (Pacifico Energy)?**

GW Ranch (Pacifico Energy) is an AI data center campus tracked on the DEPLOY registry, located in Fort Stockton. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will GW Ranch (Pacifico Energy) use?**

GW Ranch (Pacifico Energy) has 1 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.

**Is GW Ranch (Pacifico Energy) operating yet?**

As of the most recent verification on the DEPLOY registry, GW Ranch (Pacifico Energy) is permitted. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on GW Ranch (Pacifico Energy)?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- Pacifico Energy Secures 7.65 GW Power Generation Permit for GW Ranch Project: https://www.businesswire.com/news/home/20260126236053/en/Pacifico-Energy-Secures-7.65-GW-Power-Generation-Permit-for-GW-Ranch-Project
- Country's Largest Air Pollution Permit Issued to Power Plant for Data Centers in West Texas: https://www.texasobserver.org/developer-gw-ranch-pecos-county-largest-power-project-us/
- Preliminary Determination Summary — Pacifico GW LLC: https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&Rendition=Web&SearchID=15228583&dID=9305207&searchType=External
- GW Ranch Energy Center: https://www.gem.wiki/GW_Ranch_Energy_Center
- Pacifico unveils 5 GW off-grid Texas power for data centers: https://www.energytech.com/data-center-power/article/55311675/pacifico-unveils-5-gw-off-grid-texas-power-for-data-centers
- Amazon acquires 8,000-acre site in Pecos, Texas, for natural gas powered behind-the-meter data center: https://www.datacenterdynamics.com/en/news/amazon-acquires-8000-acre-site-in-pecos-texas-for-natural-gas-powered-behind-the-meter-data-center-report/
- Massive AI data center coming to Pecos County: https://bigbendsentinel.com/2026/02/04/massive-ai-data-center-coming-to-pecos-county/

Canonical: https://registry.deploy.report/datacenters/pacifico-gw-ranch-pecos-texas
JSON: https://registry.deploy.report/v1/datacenters/pacifico-gw-ranch-pecos-texas
