Alpha Digital Campus (LandBridge / PowerBridge)

Alpha Digital Campus is an AI data center campus developed by PowerBridge in Texas, Pecos. 2 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Announced · PowerBridge · Private land · ERCOT · Pecos, Texas, United States


Capacity: announced vs energized

Announced-to-energized gap: 2 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Promised online: 2027. 15 months away. Claimed by LandBridge / PowerBridge (source).

Alpha Digital Campus (LandBridge / PowerBridge) capacity claims
Source
Announced2 GW2026-04-02reportedutility filing

Key facts

announced

Lifecycle

2 GW

Announced

0 GW

Energized

PowerBridge

Developer

ERCOT

Grid

2 GW

Announced-to-energized gap

On the data center map

Every tracked data center is on this map, centered on Alpha Digital Campus. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.
The story of Alpha Digital Campus (LandBridge / PowerBridge)
Grid
ERCOT · Private network, with the paperwork already filed: PowerBridge has submitted its Generation Interconnection Request covering the generation and the data center load, all of which is to be served by PowerBridge's own private use network rather than the public grid. The campus covers up to about 3,400 acres in Reeves County beside the Waha gas hub, with first power expected in 2027 and large-scale generation in 2028.

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterTexas(607)

The deal

developer
PowerBridge · Power + data-center developer
financier
LandBridge Company (NYSE: LB) · Surface-land owner/lessor
financier
Five Point Infrastructure · Texas-based PE/infrastructure investor (~$8B AUM) that established both LandBridge and PowerBridge.

Power

Power source
behind the meter gas
Grid operator
ERCOT
Interconnection
Private network, with the paperwork already filed: PowerBridge has submitted its Generation Interconnection Request covering the generation and the data center load, all of which is to be served by PowerBridge's own private use network rather than the public grid. The campus covers up to about 3,400 acres in Reeves County beside the Waha gas hub, with first power expected in 2027 and large-scale generation in 2028.
Water
Not published. The announcement lists significant water availability among West Texas's advantages and says nothing further: no source, no volume, no arrangement, on a campus of about 3,400 acres.

Alpha Digital co-located generation, 2 GW gas, Announced. Co-located gas generation near Waha hub

Alpha Digital Campus co-located generation, 2 GW gas, Announced. Up to 2 GW of on-site power generation adjacent to the Waha natural gas hub; first power delivery anticipated 2027.

The Texas (ERCOT) grid demand right now: 52.0 GW (EIA-930, 2026-09-27 10:00). Alpha Digital Campus's announced 2 GW would be 3.8% of the grid's current load.

County water status: Moderate drought (D1) in Pecos County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Alpha Digital Campus sits on private land in Texas, Pecos. It connects to the ERCOT grid, draws on behind the meter gas power, interconnection is Private network, with the paperwork already filed: PowerBridge has submitted its Generation Interconnection Request covering the generation and the data center load, all of which is to be served by PowerBridge's own private use network rather than the public grid. The campus covers up to about 3,400 acres in Reeves County beside the Waha gas hub, with first power expected in 2027 and large-scale generation in 2028.. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States

Timeline

  1. Aug 2026
    party added
    financier: Five Point Infrastructure
  2. Sep 2026
    Current: Announced

Sources

88a8d36e-a461-4d72-be47-0deb84cdb9d9 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Alpha Digital Campus (LandBridge / PowerBridge)?
Alpha Digital Campus (LandBridge / PowerBridge) is an AI data center campus tracked on the DEPLOY registry, located in Pecos. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will Alpha Digital Campus (LandBridge / PowerBridge) use?
Alpha Digital Campus (LandBridge / PowerBridge) has 2 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building Alpha Digital Campus (LandBridge / PowerBridge)?
PowerBridge is recorded as a party to Alpha Digital Campus (LandBridge / PowerBridge) on the DEPLOY registry.
Is Alpha Digital Campus (LandBridge / PowerBridge) operating yet?
As of the most recent verification on the DEPLOY registry, Alpha Digital Campus (LandBridge / PowerBridge) is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Alpha Digital Campus (LandBridge / PowerBridge)?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Alpha Digital Campus (LandBridge / PowerBridge) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Alpha Digital Campus (LandBridge / PowerBridge): AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/landbridge-powerbridge-alpha-digital-reeves-texas

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces