Data center campus
Alpha Digital Campus (LandBridge / PowerBridge)
Alpha Digital Campus is an AI data center campus developed by PowerBridge in Texas, Pecos. 2 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Announced · PowerBridge · Private land · ERCOT · Pecos, Texas, United States
Capacity: announced vs energized
Announced-to-energized gap: 2 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
Promised online: 2027. 15 months away. Claimed by LandBridge / PowerBridge (source).
| Source | ||||
|---|---|---|---|---|
| Announced | 2 GW | 2026-04-02 | reported | utility filing |
Key facts
Lifecycle
Announced
Energized
PowerBridge
Developer
Location
Grid
Land
Announced-to-energized gap
On the data center map
Every tracked data center is on this map, centered on Alpha Digital Campus. Pan or zoom out to see how close rivals are building.
- Grid
- ERCOT · Private network, with the paperwork already filed: PowerBridge has submitted its Generation Interconnection Request covering the generation and the data center load, all of which is to be served by PowerBridge's own private use network rather than the public grid. The campus covers up to about 3,400 acres in Reeves County beside the Waha gas hub, with first power expected in 2027 and large-scale generation in 2028.
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterTexas(607)
The deal
- developer
- PowerBridge · Power + data-center developer
- financier
- LandBridge Company (NYSE: LB) · Surface-land owner/lessor
- financier
- Five Point Infrastructure · Texas-based PE/infrastructure investor (~$8B AUM) that established both LandBridge and PowerBridge.
Power
- Power source
- behind the meter gas
- Grid operator
- ERCOT
- Interconnection
- Private network, with the paperwork already filed: PowerBridge has submitted its Generation Interconnection Request covering the generation and the data center load, all of which is to be served by PowerBridge's own private use network rather than the public grid. The campus covers up to about 3,400 acres in Reeves County beside the Waha gas hub, with first power expected in 2027 and large-scale generation in 2028.
- Water
- Not published. The announcement lists significant water availability among West Texas's advantages and says nothing further: no source, no volume, no arrangement, on a campus of about 3,400 acres.
Alpha Digital co-located generation, 2 GW gas, Announced. Co-located gas generation near Waha hub
Alpha Digital Campus co-located generation, 2 GW gas, Announced. Up to 2 GW of on-site power generation adjacent to the Waha natural gas hub; first power delivery anticipated 2027.
The Texas (ERCOT) grid demand right now: 52.0 GW (EIA-930, 2026-09-27 10:00). Alpha Digital Campus's announced 2 GW would be 3.8% of the grid's current load.
County water status: Moderate drought (D1) in Pecos County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Alpha Digital Campus sits on private land in Texas, Pecos. It connects to the ERCOT grid, draws on behind the meter gas power, interconnection is Private network, with the paperwork already filed: PowerBridge has submitted its Generation Interconnection Request covering the generation and the data center load, all of which is to be served by PowerBridge's own private use network rather than the public grid. The campus covers up to about 3,400 acres in Reeves County beside the Waha gas hub, with first power expected in 2027 and large-scale generation in 2028.. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Timeline
- Aug 2026party addedfinancier: Five Point Infrastructure
- Sep 2026Current: Announced
Sources
- LandBridge Announces Agreement with PowerBridge for the Development of a 2 GW Powered Data Center Campus
- LandBridge & PowerBridge partner for 2GW data center campus in West Texas
- LandBridge Announces Agreement with PowerBridge for the Development of a 2 GW Powered Data Center Campus · LandBridge
88a8d36e-a461-4d72-be47-0deb84cdb9d9 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Alpha Digital Campus (LandBridge / PowerBridge)?
How much power will Alpha Digital Campus (LandBridge / PowerBridge) use?
Who is building Alpha Digital Campus (LandBridge / PowerBridge)?
Is Alpha Digital Campus (LandBridge / PowerBridge) operating yet?
How verified is the data on Alpha Digital Campus (LandBridge / PowerBridge)?
Deploy Watch
Track Alpha Digital Campus (LandBridge / PowerBridge) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Alpha Digital Campus (LandBridge / PowerBridge): AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/landbridge-powerbridge-alpha-digital-reeves-texas
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/landbridge-powerbridge-alpha-digital-reeves-texas.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/landbridge-powerbridge-alpha-digital-reeves-texas
- Data documentation: /data
- Query this programmatically: Deploy MCP