{"id":"88a8d36e-a461-4d72-be47-0deb84cdb9d9","slug":"landbridge-powerbridge-alpha-digital-reeves-texas","name":"Alpha Digital Campus (LandBridge / PowerBridge)","aliases":["Alpha Digital Campus","LandBridge PowerBridge Reeves"],"locationId":"8ba6b6b6-6340-4ffe-8649-dacd7c607c26","lat":null,"lng":null,"locationPrecision":null,"landStatus":"private","lifecycleState":"announced","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":"Private network, with the paperwork already filed: PowerBridge has submitted its Generation Interconnection Request covering the generation and the data center load, all of which is to be served by PowerBridge's own private use network rather than the public grid. The campus covers up to about 3,400 acres in Reeves County beside the Waha gas hub, with first power expected in 2027 and large-scale generation in 2028.","interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"ERCOT","waterSourceNotes":"Not published. The announcement lists significant water availability among West Texas's advantages and says nothing further: no source, no volume, no arrangement, on a campus of about 3,400 acres.","servingUtility":null,"acreage":3400,"totalBuildingSqft":null,"streetAddress":null,"notes":"LandBridge (NYSE: LB) signed an April 2026 lease-development agreement with PowerBridge for up to ~3,400 acres in Reeves County near the Waha gas hub for a giga-scale data center campus with up to 2 GW of co-located power generation. End data-center tenant and financing are not disclosed; initial power targeted 2027.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.businesswire.com/news/home/20260402043900/en/LandBridge-Announces-Agreement-with-PowerBridge-for-the-Development-of-a-2-GW-Powered-Data-Center-Campus","date":"2026-04-02","title":"LandBridge Announces Agreement with PowerBridge for the Development of a 2 GW Powered Data Center Campus","publisher":"BusinessWire"},{"url":"https://www.datacenterdynamics.com/en/news/landbridge-powerbridge-partner-for-2gw-data-center-campus-in-west-texas/","date":"2026-04-02","title":"LandBridge & PowerBridge partner for 2GW data center campus in West Texas","publisher":"DCD"},{"url":"https://www.landbridgeco.com/investor-relations/news/news-details/2026/LandBridge-Announces-Agreement-with-PowerBridge-for-the-Development-of-a-2-GW-Powered-Data-Center-Campus/default.aspx","title":"LandBridge Announces Agreement with PowerBridge for the Development of a 2 GW Powered Data Center Campus","sourceName":"LandBridge"}],"reviewNote":null,"createdAt":"2026-08-17T20:24:04.786Z","updatedAt":"2026-08-28T20:06:25.473Z","location":{"id":"8ba6b6b6-6340-4ffe-8649-dacd7c607c26","name":"Pecos","slug":"pecos-texas","kind":"city","parentLocationId":"45f67762-10f4-4255-be84-45c73efe25f9","region":"Texas","lat":30.7857437,"lng":-102.8065415,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T20:23:34.947Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"f7656630-1608-4ada-95a6-258344f1a447","dataCenterId":"88a8d36e-a461-4d72-be47-0deb84cdb9d9","companyId":null,"externalName":"PowerBridge","role":"developer","structureNotes":"Power + data-center developer","createdAt":"2026-08-17T20:24:06.384Z","company":null},{"id":"83fb9f62-d803-4a4c-bf0c-f62821d45039","dataCenterId":"88a8d36e-a461-4d72-be47-0deb84cdb9d9","companyId":null,"externalName":"LandBridge Company (NYSE: LB)","role":"financier","structureNotes":"Surface-land owner/lessor","createdAt":"2026-08-17T20:24:07.140Z","company":null},{"id":"47d5e130-5fad-40a5-ab06-37971e1594ae","dataCenterId":"88a8d36e-a461-4d72-be47-0deb84cdb9d9","companyId":null,"externalName":"Five Point Infrastructure","role":"financier","structureNotes":"Texas-based PE/infrastructure investor (~$8B AUM) that established both LandBridge and PowerBridge.","createdAt":"2026-08-19T00:29:19.273Z","company":null}],"capacityClaims":[{"id":"41f51eba-8d27-4649-b2b3-6c23b23a4824","dataCenterId":"88a8d36e-a461-4d72-be47-0deb84cdb9d9","series":"announced","valueGw":2,"asOf":"2026-04-02T00:00:00.000Z","sourceUrl":"https://www.businesswire.com/news/home/20260402043900/en/LandBridge-Announces-Agreement-with-PowerBridge-for-the-Development-of-a-2-GW-Powered-Data-Center-Campus","sourceType":"utility_filing","evidenceTier":"reported","supersedesId":null,"note":"Up to 2 GW co-located power; disclosed by public-company (LandBridge) IR/SEC","createdAt":"2026-08-17T20:24:05.470Z"}],"financialClaims":[],"metricClaims":[],"powerProjects":[{"id":"66038513-bfef-4461-a2fc-e06adb5ba288","dataCenterId":"88a8d36e-a461-4d72-be47-0deb84cdb9d9","name":"Alpha Digital co-located generation","type":"gas","capacityGw":2,"lifecycleState":"announced","sourceUrl":"https://www.datacenterdynamics.com/en/news/landbridge-powerbridge-partner-for-2gw-data-center-campus-in-west-texas/","evidenceTier":"reported","note":"Co-located gas generation near Waha hub","createdAt":"2026-08-17T20:24:06.004Z"},{"id":"6429aae1-0757-4578-9d19-101d0774c0f5","dataCenterId":"88a8d36e-a461-4d72-be47-0deb84cdb9d9","name":"Alpha Digital Campus co-located generation","type":"gas","capacityGw":2,"lifecycleState":"announced","sourceUrl":"https://www.businesswire.com/news/home/20260402043900/en/LandBridge-Announces-Agreement-with-PowerBridge-for-the-Development-of-a-2-GW-Powered-Data-Center-Campus","evidenceTier":"reported","note":"Up to 2 GW of on-site power generation adjacent to the Waha natural gas hub; first power delivery anticipated 2027.","createdAt":"2026-08-19T00:29:18.514Z"}],"facilities":[],"incidents":[],"events":[{"id":"83f8ffe2-ab1c-468b-a435-b33f4ddc9c2c","dataCenterId":"88a8d36e-a461-4d72-be47-0deb84cdb9d9","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"financier: Five Point Infrastructure","occurredAt":"2026-08-19T00:29:19.658Z","createdAt":"2026-08-19T00:29:19.658Z"},{"id":"74bf5db9-e213-402a-b683-257fe0124c80","dataCenterId":"88a8d36e-a461-4d72-be47-0deb84cdb9d9","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"financier: LandBridge Company (NYSE: LB)","occurredAt":"2026-08-17T20:24:07.521Z","createdAt":"2026-08-17T20:24:07.521Z"},{"id":"5b8dc555-4914-4fd2-b1be-c90dc1e508b1","dataCenterId":"88a8d36e-a461-4d72-be47-0deb84cdb9d9","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: PowerBridge","occurredAt":"2026-08-17T20:24:06.765Z","createdAt":"2026-08-17T20:24:06.765Z"},{"id":"1cab3997-96db-4154-8dc0-1c5d66efd9d2","dataCenterId":"88a8d36e-a461-4d72-be47-0deb84cdb9d9","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"2","claimId":"41f51eba-8d27-4649-b2b3-6c23b23a4824","detail":null,"occurredAt":"2026-08-17T20:24:05.770Z","createdAt":"2026-08-17T20:24:05.770Z"},{"id":"ad800b3a-e48f-45bb-b2df-2621b832e0a5","dataCenterId":"88a8d36e-a461-4d72-be47-0deb84cdb9d9","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"2","claimId":"41f51eba-8d27-4649-b2b3-6c23b23a4824","detail":"reported · utility_filing","occurredAt":"2026-08-17T20:24:05.620Z","createdAt":"2026-08-17T20:24:05.620Z"}],"capacity_picture":{"announced_gw":2,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":2,"by_series":{"announced":{"valueGw":2,"asOf":"2026-04-02T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.businesswire.com/news/home/20260402043900/en/LandBridge-Announces-Agreement-with-PowerBridge-for-the-Development-of-a-2-GW-Powered-Data-Center-Campus"},"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Alpha Digital Campus (LandBridge / PowerBridge)","url":"https://registry.deploy.report/datacenters/landbridge-powerbridge-alpha-digital-reeves-texas","address":{"@type":"PostalAddress","addressLocality":"Pecos"}}}