Data center campus
Project Llano (Crusoe / Google Goodnight Campus, Claude TX)
Project Llano is a tracked AI data center campus in Texas, Armstrong. Crusoe-developed campus for Google in Claude, Armstrong County, TX (Project Llano / Goodnight Campus). Six buildings under construction as of Sep 2026 open house; first Google handoff expected early 2027. Filed under Cru
Under construction · Crusoe · Private land · ERCOT · Armstrong, Texas, United States
Capacity: announced vs energized
| Source |
|---|
Key facts
Lifecycle
Energized
Developer
Location
Grid
Land
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Campus (reported, Sep 2026)
- Six-building campus in Claude, Armstrong County, TX; first buildings to Google early 2027, build done end 2027.
- Jobs (company-claimed)
- Google committed to 50 permanent jobs once operational.
- Cooling and power (company-claimed)
- Closed-loop cooling; powered by Goodnight 1 and 2 wind farms with ERCOT grid backup.
- Water use (company-claimed)
- About 2M gallons a year per building once operating; construction use falling from 600k to 275k gpd.
- Filings (reported, Jul 2026)
- Also called Goodnight Campus, 10001 Lima Road; filed under Crusoe affiliate GN DC1 LLC.
- Developer (company-claimed, Sep 2026)
- Crusoe develops the campus for Google; ground broken June 2025; 5,500+ workers on site daily.
- Wind supply (company-claimed)
- Direct link to Goodnight 1 (265.5 MW operating) and Goodnight 2 (265.5 MW under construction).
On the data center map
Every tracked data center is on this map, centered on Project Llano. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
- Tenant
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterArmstrong(4)·Texas(611)
The deal
Power
- Power source
- mixed
- Grid operator
- ERCOT
- Interconnection
- Water
- Closed-loop cooling per Sep 2026 open house (KFDA). Primary power Goodnight 1/2 wind; ERCOT backup.
The Texas (ERCOT) grid demand right now: 50.6 GW (EIA-930, 2026-11-07 05:00).
County water status: Severe drought (D2) in Armstrong County, week of 2026-11-03 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Project Llano sits on private land in Texas, Armstrong. It connects to the ERCOT grid, draws on mixed power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Sources
- Construction underway on six-building Claude data center (Project Llano open house) · KFDA NewsChannel 10
- Crusoe files for two more data centers at Goodnight Campus (Project Llano) · Data Center Dynamics
- Project Llano Claude TX open-house coverage (secondary X) · X (@drmikemyers)
- Crusoe Developing Data Center Campus in Armstrong County, Texas · Crusoe
- Google named as customer for Crusoe's data center campus in Amarillo, Texas · Data Center Dynamics
870c7408-d9d1-4879-986a-051504df7f9d · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Project Llano (Crusoe / Google Goodnight Campus, Claude TX)?
Who is building Project Llano (Crusoe / Google Goodnight Campus, Claude TX)?
Is Project Llano (Crusoe / Google Goodnight Campus, Claude TX) operating yet?
How verified is the data on Project Llano (Crusoe / Google Goodnight Campus, Claude TX)?
Deploy Watch
Track Project Llano (Crusoe / Google Goodnight Campus, Claude TX) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Project Llano (Crusoe / Google Goodnight Campus, Claude TX): AI data center campus record. Retrieved November 11, 2026, from https://registry.deploy.report/datacenters/crusoe-google-project-llano-claude-texas
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/crusoe-google-project-llano-claude-texas.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/crusoe-google-project-llano-claude-texas
- Data documentation: /data
- Query this programmatically: Deploy MCP