# Project Llano (Crusoe / Google Goodnight Campus, Claude TX)

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 870c7408-d9d1-4879-986a-051504df7f9d
- **Type:** AI data center campus
- **Operator / developer:** [Crusoe](/companies/crusoe.md)
- **Location:** Armstrong, Texas, United States
- **Lifecycle state:** under_construction

## Parties

- Crusoe (developer): https://registry.deploy.report/companies/crusoe
- Google (tenant): https://registry.deploy.report/companies/google

## Common questions


**What is Project Llano (Crusoe / Google Goodnight Campus, Claude TX)?**

Project Llano (Crusoe / Google Goodnight Campus, Claude TX) is an AI data center campus tracked on the DEPLOY registry, located in Armstrong. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**Who is building Project Llano (Crusoe / Google Goodnight Campus, Claude TX)?**

Crusoe is recorded as a party to Project Llano (Crusoe / Google Goodnight Campus, Claude TX) on the DEPLOY registry. The full party list, with each role, is on the record.

**Is Project Llano (Crusoe / Google Goodnight Campus, Claude TX) operating yet?**

As of the most recent verification on the DEPLOY registry, Project Llano (Crusoe / Google Goodnight Campus, Claude TX) is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on Project Llano (Crusoe / Google Goodnight Campus, Claude TX)?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- Construction underway on six-building Claude data center (Project Llano open house): https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/
- Crusoe files for two more data centers at Goodnight Campus (Project Llano): https://www.datacenterdynamics.com/en/news/crusoe-files-for-two-more-data-centers-at-goodnight-campus-in-armstrong-county-texas/
- Project Llano Claude TX open-house coverage (secondary X): https://x.com/drmikemyers/status/2102925201029681212

Canonical: https://registry.deploy.report/datacenters/crusoe-google-project-llano-claude-texas
JSON: https://registry.deploy.report/v1/datacenters/crusoe-google-project-llano-claude-texas
