Google / DTE 'Project Cannoli' — Van Buren Township

Google / DTE 'Project Cannoli' — Van Buren Township is an AI data center campus developed by Panattoni Development in Michigan, Van Buren Township. 1 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Permitted · Panattoni Development · greenfield · MISO · Van Buren Township, Michigan, United States


Capacity: announced vs energized

Announced-to-energized gap: 1 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Promised online: 2026-09-10. 1 month past the claimed date, with no energized capacity on record. Claimed by DTE Energy (source).

Google / DTE 'Project Cannoli' — Van Buren Township capacity claims
Source
Announced1 GW2026-03-17reportedutility filing

Key facts

permitted

Lifecycle

1 GW

Announced

0 GW

Energized

Panattoni Development

Developer

MISO

Grid

1 GW

Announced-to-energized gap

On the data center map

Every tracked data center is on this map, centered on Google / DTE 'Project Cannoli' — Van Buren Township. Pan or zoom out to see how close rivals are building.

Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.

Free to use on your site, with a link back to DEPLOY.

In clusterMichigan(59)

The deal

developer
Panattoni Development · site developer, 'Project Cannoli'
utility
DTE Energy · 20-year special contract, MPSC contested case
offtaker
Google · confirmed end user Mar 2026

Power

Power source
mixed
Grid operator
MISO
Interconnection

DTE renewable resources for Van Buren load, 1.60 GW solar, Announced. 1.6 GW renewable in DTE 2.7 GW build-out to serve load

DTE storage for Van Buren load, 0.45 GW storage, Announced. 450 MW storage

DTE renewable generation for Google load, 1.60 GW solar, Announced. 1.6 GW renewable within the 2.7 GW package of new DTE resources to serve the data center

DTE energy storage for Google load, 0.45 GW storage, Announced. 450 MW of energy storage within the 2.7 GW package

The MISO grid demand right now: 60.3 GW (EIA-930, 2026-09-27 11:00). Google / DTE 'Project Cannoli' — Van Buren Township's announced 1 GW would be 1.7% of the grid's current load.

County water status: Moderate drought (D1) in Wayne County, week of 2026-09-08 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Google / DTE 'Project Cannoli' — Van Buren Township sits on greenfield in Michigan, Van Buren Township. It connects to the MISO grid, draws on mixed power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Financial structure

Google energy affordability pledge
$10M. Google pledge to scale energy affordability initiatives in Michigan (company commitment, not an incentive received) journalist report

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States
FAA Proposed Rule: Enabling Supersonic Overland Flight (July 2026)operational restriction · 2026-07-02 · United States

Timeline

  1. Aug 2026
    financial recorded
    incentive: Google energy affordability pledge
  2. Sep 2026
    Current: Permitted

Sources

3855ca30-2f90-46ea-9f56-34907bfdf94c · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Google / DTE 'Project Cannoli' — Van Buren Township?
Google / DTE 'Project Cannoli' — Van Buren Township is an AI data center campus tracked on the DEPLOY registry, located in Van Buren Township. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will Google / DTE 'Project Cannoli' — Van Buren Township use?
Google / DTE 'Project Cannoli' — Van Buren Township has 1 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building Google / DTE 'Project Cannoli' — Van Buren Township?
Panattoni Development is recorded as a party to Google / DTE 'Project Cannoli' — Van Buren Township on the DEPLOY registry.
Is Google / DTE 'Project Cannoli' — Van Buren Township operating yet?
As of the most recent verification on the DEPLOY registry, Google / DTE 'Project Cannoli' — Van Buren Township is permitted. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Google / DTE 'Project Cannoli' — Van Buren Township?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Google / DTE 'Project Cannoli' — Van Buren Township on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Google / DTE 'Project Cannoli' — Van Buren Township: AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/google-dte-van-buren-michigan

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces