DEPLOYDatabase

Data center campus

Aligned Conesville Industrial Park Campus

Aligned Conesville Industrial Park Campus is a tracked AI data center campus in Ohio, Coshocton County. Aligned Data Centers mega-scale campus inside the Conesville Industrial Park, Coshocton County, Ohio, on a ~197-acre parcel adjacent to the former AEP Conesville Power Plant (brownfield revitalization). Company press rel

Under construction · Aligned Data Centers · Former industrial site · PJM · Conesville, Coshocton County, Ohio, United States


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Aligned Conesville Industrial Park Campus capacity claims
Source

Key facts

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

Location
Conesville Industrial Park, Coshocton County, Ohio; ~197 acres adjacent to the former AEP Conesville Power Plant (Aligned Data Centers)
Lifecycle / timeline
Under construction / buildout; company targeted initial capacity delivery mid-2026 and described a foundational customer for the first building; Coshocton Tribune gallery documents a Sept 30, 2025 groundbreaking (Aligned Data Centers; Coshocton Tribune)
Land status
Former industrial / brownfield revitalization adjacent to former AEP Conesville Power Plant (Aligned Data Centers; Data Center Frontier)
Site size
197-acre parcel (Aligned Data Centers)
Investment framing
Multi-billion dollar phased development (company; no single public MW or exact dollar figure in the primary release) (Aligned Data Centers)
Foundational customer
Company says the first data center has secured a foundational customer; counterparty not named (Aligned Data Centers)
Jobs (company claim)
Thousands of construction jobs and hundreds of long-term operational roles anticipated (company) (Aligned Data Centers)
Ohio portfolio context
Described by Aligned as its third data center campus in Ohio (Aligned Data Centers)
Grid
PJM territory (registry gridOperator); adjacent to former AEP Conesville generating site (Aligned Data Centers)

On the data center map

Every tracked data center is on this map, centered on Aligned Conesville Industrial Park Campus. Pan or zoom out to see how close rivals are building.

Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.

Free to use on your site, with a link back to DEPLOY.
The story of Aligned Conesville Industrial Park Campus
Grid
PJM · due 2026
Tenant
Unnamed foundational customer

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterCoshocton County(4)·Ohio(142)

The deal

developer
Aligned Data Centers · Developing the Conesville Industrial Park multi-building campus.
tenant
Unnamed foundational customer · Aligned says the first data center has secured a foundational customer; counterparty not named in the Jul 24, 2025 release.
grid operator
PJM Interconnection · Campus sits in PJM territory (registry gridOperator).

Power

Power source
grid
Grid operator
PJM
Interconnection

The PJM grid demand right now: 82.1 GW (EIA-930, 2026-09-28 03:00).

County water status: No drought in Coshocton County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Aligned Conesville Industrial Park Campus sits on former industrial site in Ohio, Coshocton County. It connects to the PJM grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States
FAA Proposed Rule: Enabling Supersonic Overland Flight (July 2026)operational restriction · 2026-07-02 · United States

Timeline

  1. Sep 2026
    party added
    grid_operator: PJM Interconnection
  2. Sep 2026
    Current: Under construction

Sources

40512f0c-0bba-4853-8ea5-420accc2e328 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Aligned Conesville Industrial Park Campus?
Aligned Conesville Industrial Park Campus is an AI data center campus tracked on the DEPLOY registry, located in Conesville. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Aligned Conesville Industrial Park Campus?
Aligned Data Centers is recorded as a party to Aligned Conesville Industrial Park Campus on the DEPLOY registry. The full party list, with each role, is on the record.
Is Aligned Conesville Industrial Park Campus operating yet?
As of the most recent verification on the DEPLOY registry, Aligned Conesville Industrial Park Campus is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Aligned Conesville Industrial Park Campus?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Aligned Conesville Industrial Park Campus on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Aligned Conesville Industrial Park Campus: AI data center campus record. Retrieved September 28, 2026, from https://registry.deploy.report/datacenters/aligned-conesville-ohio

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces