{"id":"40512f0c-0bba-4853-8ea5-420accc2e328","slug":"aligned-conesville-ohio","name":"Aligned Conesville Industrial Park Campus","aliases":["Aligned Conesville","Aligned Coshocton County","Aligned CMH-02","Aligned Conesville Industrial Park","Aligned Coshocton Conesville","Aligned former AEP Conesville site","Aligned Ohio third campus"],"locationId":"1db65c32-7f55-4b23-be44-a7d4b13e355b","lat":40.184,"lng":-81.893,"locationPrecision":"city","landStatus":"former_industrial","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":"2026-07-01T00:00:00.000Z","dedicatedSubstation":null,"gridOperator":"PJM","waterSourceNotes":null,"servingUtility":null,"acreage":197,"totalBuildingSqft":null,"streetAddress":null,"notes":"Aligned Data Centers mega-scale campus inside the Conesville Industrial Park, Coshocton County, Ohio, on a ~197-acre parcel adjacent to the former AEP Conesville Power Plant (brownfield revitalization). Company press release (Jul 24, 2025) describes a multi-billion-dollar phased development that had already secured a foundational customer for the first data center, targeting initial capacity delivery mid-2026; Aligned called it its third Ohio campus. Coshocton Tribune picture gallery documents a Sept 30, 2025 groundbreaking ceremony. No public campus-wide MW figure is taken onto this row from primary sources (aggregator MW figures vary and are held).","keyFacts":[{"label":"Operator / developer","value":"Aligned Data Centers ([Aligned Data Centers](https://aligneddc.com/press-release/aligned-data-centers-expands-in-ohio-with-new-mega-scale-ai-campus/))"},{"label":"Location","value":"Conesville Industrial Park, Coshocton County, Ohio; ~197 acres adjacent to the former AEP Conesville Power Plant ([Aligned Data Centers](https://aligneddc.com/press-release/aligned-data-centers-expands-in-ohio-with-new-mega-scale-ai-campus/))"},{"label":"Lifecycle / timeline","value":"Under construction / buildout; company targeted initial capacity delivery mid-2026 and described a foundational customer for the first building; Coshocton Tribune gallery documents a Sept 30, 2025 groundbreaking ([Aligned Data Centers](https://aligneddc.com/press-release/aligned-data-centers-expands-in-ohio-with-new-mega-scale-ai-campus/); [Coshocton Tribune](https://www.coshoctontribune.com/picture-gallery/news/local/coshocton-county/2025/10/02/photos-from-aligned-data-centers-sept-30-groundbreaking-ceremony/86444544007/))"},{"label":"Land status","value":"Former industrial / brownfield revitalization adjacent to former AEP Conesville Power Plant ([Aligned Data Centers](https://aligneddc.com/press-release/aligned-data-centers-expands-in-ohio-with-new-mega-scale-ai-campus/); [Data Center Frontier](https://www.datacenterfrontier.com/site-selection/article/55306993/from-brownfield-to-breakthrough-aligned-data-centers-extends-its-ai-first-infrastructure-vision-from-ohio-to-the-edge-of-innovation))"},{"label":"Site size","value":"197-acre parcel ([Aligned Data Centers](https://aligneddc.com/press-release/aligned-data-centers-expands-in-ohio-with-new-mega-scale-ai-campus/))"},{"label":"Investment framing","value":"Multi-billion dollar phased development (company; no single public MW or exact dollar figure in the primary release) ([Aligned Data Centers](https://aligneddc.com/press-release/aligned-data-centers-expands-in-ohio-with-new-mega-scale-ai-campus/))"},{"label":"Foundational customer","value":"Company says the first data center has secured a foundational customer; counterparty not named ([Aligned Data Centers](https://aligneddc.com/press-release/aligned-data-centers-expands-in-ohio-with-new-mega-scale-ai-campus/))"},{"label":"Jobs (company claim)","value":"Thousands of construction jobs and hundreds of long-term operational roles anticipated (company) ([Aligned Data Centers](https://aligneddc.com/press-release/aligned-data-centers-expands-in-ohio-with-new-mega-scale-ai-campus/))"},{"label":"Ohio portfolio context","value":"Described by Aligned as its third data center campus in Ohio ([Aligned Data Centers](https://aligneddc.com/press-release/aligned-data-centers-expands-in-ohio-with-new-mega-scale-ai-campus/))"},{"label":"Grid","value":"PJM territory (registry gridOperator); adjacent to former AEP Conesville generating site ([Aligned Data Centers](https://aligneddc.com/press-release/aligned-data-centers-expands-in-ohio-with-new-mega-scale-ai-campus/))"}],"reviewStatus":"reviewed","sources":[{"url":"https://aligneddc.com/press-release/aligned-data-centers-expands-in-ohio-with-new-mega-scale-ai-campus/","title":"Aligned Data Centers Expands in Ohio with New Mega-Scale AI Campus","sourceName":"Aligned Data Centers"},{"url":"https://www.datacenterdynamics.com/en/news/aligned-to-develop-200-acre-data-center-campus-in-coshocton-ohio/","title":"Aligned to develop 200-acre data center campus in Coshocton, Ohio","sourceName":"Data Center Dynamics"},{"url":"https://www.datacenterfrontier.com/site-selection/article/55306993/from-brownfield-to-breakthrough-aligned-data-centers-extends-its-ai-first-infrastructure-vision-from-ohio-to-the-edge-of-innovation","title":"From Brownfield to Breakthrough: Aligned Data Centers Extends Its AI-First Infrastructure Vision from Ohio to the Edge of Innovation","sourceName":"Data Center Frontier"},{"url":"https://www.coshoctontribune.com/picture-gallery/news/local/coshocton-county/2025/10/02/photos-from-aligned-data-centers-sept-30-groundbreaking-ceremony/86444544007/","title":"Photos from Aligned Data Centers' Sept. 30 groundbreaking ceremony","sourceName":"Coshocton Tribune"}],"reviewNote":null,"createdAt":"2026-09-27T05:17:44.816Z","updatedAt":"2026-09-28T02:44:15.248Z","location":{"id":"1db65c32-7f55-4b23-be44-a7d4b13e355b","name":"Conesville","slug":"conesville-ohio","kind":"city","parentLocationId":"4569db22-1c26-45cc-b828-727871dcb5ce","region":"Ohio","lat":40.1839598,"lng":-81.8909653,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-19T02:14:05.419Z","updatedAt":"2026-08-21T18:01:48.568Z"},"parties":[{"id":"85acc898-9824-4f1f-85ef-9417afa391b7","dataCenterId":"40512f0c-0bba-4853-8ea5-420accc2e328","companyId":"725e4223-b7d1-44f4-a183-e0b0e7cad7bf","externalName":null,"role":"developer","structureNotes":"Developing the Conesville Industrial Park multi-building campus.","createdAt":"2026-09-27T05:17:45.572Z","company":{"id":"725e4223-b7d1-44f4-a183-e0b0e7cad7bf","name":"Aligned Data Centers","slug":"aligned-data-centers"}},{"id":"5b4cf52d-b9ce-443d-a52e-15c7792a144d","dataCenterId":"40512f0c-0bba-4853-8ea5-420accc2e328","companyId":null,"externalName":"Unnamed foundational customer","role":"tenant","structureNotes":"Aligned says the first data center has secured a foundational customer; counterparty not named in the Jul 24, 2025 release.","createdAt":"2026-09-27T12:41:25.154Z","company":null},{"id":"5629b68a-d1e0-409f-87f1-bea45b3c0cb0","dataCenterId":"40512f0c-0bba-4853-8ea5-420accc2e328","companyId":null,"externalName":"PJM Interconnection","role":"grid_operator","structureNotes":"Campus sits in PJM territory (registry gridOperator).","createdAt":"2026-09-27T12:41:25.908Z","company":null}],"capacityClaims":[],"financialClaims":[],"metricClaims":[],"powerProjects":[],"facilities":[],"incidents":[],"events":[{"id":"b26c69da-9ca6-4992-ad65-575c3b43376c","dataCenterId":"40512f0c-0bba-4853-8ea5-420accc2e328","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"grid_operator: PJM Interconnection","occurredAt":"2026-09-27T12:41:26.306Z","createdAt":"2026-09-27T12:41:26.306Z"},{"id":"8c9b73ac-ae0a-4147-9b0f-5dcff58ab4a1","dataCenterId":"40512f0c-0bba-4853-8ea5-420accc2e328","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tenant: Unnamed foundational customer","occurredAt":"2026-09-27T12:41:25.532Z","createdAt":"2026-09-27T12:41:25.532Z"},{"id":"7a4e650c-ea28-4577-9ebd-0c51790178e8","dataCenterId":"40512f0c-0bba-4853-8ea5-420accc2e328","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: 725e4223-b7d1-44f4-a183-e0b0e7cad7bf","occurredAt":"2026-09-27T05:17:45.950Z","createdAt":"2026-09-27T05:17:45.950Z"}],"capacity_picture":{"announced_gw":null,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":null,"by_series":{"announced":null,"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Aligned Conesville Industrial Park Campus","url":"https://registry.deploy.report/datacenters/aligned-conesville-ohio","geo":{"@type":"GeoCoordinates","latitude":40.184,"longitude":-81.893},"address":{"@type":"PostalAddress","addressLocality":"Conesville"}}}