{"id":"01bdc2de-ec3c-4d49-ab28-d2032658ed62","slug":"stack-stafford-technology-campus-virginia","name":"STACK Stafford Technology Campus","aliases":["Stafford Technology Campus"],"locationId":"f2bc33ef-c079-40aa-80da-8badd64e078e","lat":38.42,"lng":-77.42,"locationPrecision":"city","landStatus":"greenfield","lifecycleState":"permitted","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"PJM","waterSourceNotes":"Reclaimed water system for industrial cooling; project funds water/sewer upgrades eliminating $58M from Stafford County's Capital Improvement Program","servingUtility":null,"acreage":500,"totalBuildingSqft":null,"streetAddress":null,"notes":"STACK Infrastructure campus on both sides of Eskimo Hill Rd (Falmouth District), Stafford County; ~500 acres, 19-23 buildings, ~5.8M sq ft, stated 1.1 GW drawing six committed 300 MW Dominion substations. Board of Supervisors approved rezoning (ag to heavy industrial) plus comp-plan change 6-1 on 2024-09-17; listed 'Approved' on the county's official data-center tracker. Formal case number, critical-IT MW vs total, and air-permit status unknown; coordinates approximate.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-landmark-1gw-stafford-technology-campus-in-northern-virginia/","date":"2025-01-16","title":"STACK Infrastructure Announces Landmark 1+GW Stafford Technology Campus in Northern Virginia","publisher":"STACK Infrastructure"},{"url":"https://staffordcountyva.gov/government/departments_p-z/planning_and_zoning/data_centers/index.php","date":"2024-09-17","title":"Data Centers (official county tracker)","publisher":"Stafford County, VA"}],"reviewNote":null,"createdAt":"2026-08-17T20:21:41.715Z","updatedAt":"2026-08-28T14:22:23.889Z","location":{"id":"f2bc33ef-c079-40aa-80da-8badd64e078e","name":"Stafford","slug":"stafford-virginia","kind":"city","parentLocationId":"a0d3f9da-875c-4c6e-bdca-3be94155e191","region":"Virginia","lat":38.42,"lng":-77.42,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T20:21:41.256Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"25517412-b3ab-4bf9-bed4-387db9e56013","dataCenterId":"01bdc2de-ec3c-4d49-ab28-d2032658ed62","companyId":null,"externalName":"STACK Infrastructure","role":"developer","structureNotes":null,"createdAt":"2026-08-17T20:21:42.955Z","company":null},{"id":"ea5ef100-234c-4687-b406-20646f6e2c4c","dataCenterId":"01bdc2de-ec3c-4d49-ab28-d2032658ed62","companyId":null,"externalName":"Dominion Energy","role":"utility","structureNotes":"six 300 MW substations committed","createdAt":"2026-08-17T20:21:43.718Z","company":null}],"capacityClaims":[{"id":"11d09449-381c-41b7-ad96-f12179b5f069","dataCenterId":"01bdc2de-ec3c-4d49-ab28-d2032658ed62","series":"announced","valueGw":1.1,"asOf":"2025-01-16T00:00:00.000Z","sourceUrl":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-landmark-1gw-stafford-technology-campus-in-northern-virginia/","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"stated 1.1 GW; six committed 300 MW Dominion substations = 1.8 GW substation capacity; IT load not separated","createdAt":"2026-08-17T20:21:42.403Z"}],"financialClaims":[],"metricClaims":[{"id":"1e0d53a6-72c2-4d44-ada5-9daec483acf3","dataCenterId":"01bdc2de-ec3c-4d49-ab28-d2032658ed62","metricType":"jobs_construction","valueNumeric":1000,"valueText":"Over 1,000 construction jobs at peak development","unit":null,"grantingJurisdiction":null,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-landmark-1gw-stafford-technology-campus-in-northern-virginia/","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:28:43.060Z"},{"id":"4f6dd3f2-2c2a-4f59-8403-e6eccaaa7b8d","dataCenterId":"01bdc2de-ec3c-4d49-ab28-d2032658ed62","metricType":"jobs_permanent","valueNumeric":null,"valueText":"Hundreds of full-time permanent positions","unit":null,"grantingJurisdiction":null,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-landmark-1gw-stafford-technology-campus-in-northern-virginia/","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:28:43.443Z"},{"id":"877a6a73-f585-42b1-9276-2b56f9f4e6f2","dataCenterId":"01bdc2de-ec3c-4d49-ab28-d2032658ed62","metricType":"tax_incentive_usd","valueNumeric":null,"valueText":"~$80M projected annual tax revenue to Stafford County at full buildout","unit":null,"grantingJurisdiction":null,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/stack-plans-1gw-campus-in-stafford-county-virginia/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:28:43.822Z"}],"powerProjects":[],"facilities":[],"incidents":[],"events":[{"id":"21e3e21e-c06e-47ca-953f-e97291283e00","dataCenterId":"01bdc2de-ec3c-4d49-ab28-d2032658ed62","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Dominion Energy","occurredAt":"2026-08-17T20:21:44.093Z","createdAt":"2026-08-17T20:21:44.093Z"},{"id":"67de3e90-72fe-42bf-bbc2-d961a91a1808","dataCenterId":"01bdc2de-ec3c-4d49-ab28-d2032658ed62","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: STACK Infrastructure","occurredAt":"2026-08-17T20:21:43.336Z","createdAt":"2026-08-17T20:21:43.336Z"},{"id":"b8b00344-529d-498c-ac0e-ede3db211e4a","dataCenterId":"01bdc2de-ec3c-4d49-ab28-d2032658ed62","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"1.1","claimId":"11d09449-381c-41b7-ad96-f12179b5f069","detail":null,"occurredAt":"2026-08-17T20:21:42.714Z","createdAt":"2026-08-17T20:21:42.714Z"},{"id":"40b71463-dea8-4013-b7ef-f7154207ab25","dataCenterId":"01bdc2de-ec3c-4d49-ab28-d2032658ed62","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1.1","claimId":"11d09449-381c-41b7-ad96-f12179b5f069","detail":"reported · press_release","occurredAt":"2026-08-17T20:21:42.561Z","createdAt":"2026-08-17T20:21:42.561Z"}],"capacity_picture":{"announced_gw":1.1,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":1.1,"by_series":{"announced":{"valueGw":1.1,"asOf":"2025-01-16T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-landmark-1gw-stafford-technology-campus-in-northern-virginia/"},"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"STACK Stafford Technology Campus","url":"https://registry.deploy.report/datacenters/stack-stafford-technology-campus-virginia","geo":{"@type":"GeoCoordinates","latitude":38.42,"longitude":-77.42},"address":{"@type":"PostalAddress","addressLocality":"Stafford"}}}