Data center facility
Phoenix 3
QTS Data Centers · Glendale · 17408 W Camelback Rd, Litchfield Park, AZ 85340. Every figure below is individually sourced and dated.
Part of the tracked campus QTS Phoenix 3 Campus (Glendale).
- Announced capex
- $255M
- Land owner
- First Industrial Realty Trust
- Cost per MW
- $340K/MW
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterArizona(149)
The deal
Inherited from campus QTS Phoenix 3 Campus (Glendale).
- financier
- Blackstone
- utility
- Arizona Public Service (APS) · Glendale/Loop 303 corridor; service agreement not confirmed.
- developer
- QTS Data Centers · Owned by Blackstone.
- land owner
- First Industrial Realty Trust · Sold the 375-acre Glendale parcel to QTS in July 2022 for $255.3M
Financial structure
Inherited from campus QTS Phoenix 3 Campus (Glendale).
- Land acquisition (375-acre parcel)
- $255M. Purchased from First Industrial Realty Trust journalist report
Power
Inherited from campus QTS Phoenix 3 Campus (Glendale). Live grid demand and drought overlay only render on the campus page.
- Power source
- grid
- Grid operator
- WECC
- Interconnection
On-site ~29-acre substation, 0.75 GW grid interconnect, Announced. Dedicated substation planned to serve the campus.
Facility record
On the data center map
Construction evidence
Dated satellite imagery of the site itself, oldest to newest, with the campus milestones that landed in each window. This is what the site looked like from orbit while announcements, permits, and energizations were dated into our ledger, so bare land, grading, and building mass tell their own story alongside the paper trail. Sentinel-2 true color, 10 m resolution, cloud-free scenes; click any frame to expand it.
Delivery paceAnnounced Q1 2023 · not yet energized
Dated Sentinel-2 imagery, gated to hand-verified site coordinates. Milestones inherited from campus QTS Phoenix 3 Campus (Glendale). How we source and verify it: satellite construction evidence.
Evidence
Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.
Timeline
- Aug 2026First recordedAdded to the DEPLOY registry as a sourced facility record
- Sep 2026Current: operating
Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.
Common questions
What is Phoenix 3?
Who operates Phoenix 3?
Is Phoenix 3 operating?
How verified is the data on Phoenix 3?
Deploy Watch
Track Phoenix 3 on Deploy.
We notify you when operating status, capacity, or the operator changes against a sourced record.
Cite this page
DEPLOY. (2026). Phoenix 3: data center facility record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/facilities/qts-phoenix-3-glendale-az
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/facilities/qts-phoenix-3-glendale-az.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/facilities/qts-phoenix-3-glendale-az
- Data documentation: /data
- Query this programmatically: Deploy MCP