DEPLOY

Grid operator

AI data centers on the MISO grid

Every tracked AI data center campus interconnecting to the MISO grid, with combined announced-vs-energized capacity and the grid's live demand. Each figure is individually dated and sourced.


On this grid

Campuses
14
Announced (combined)
11.49 GW
Energized (combined)
0.47 GW
Grid demand now
71.5 GW

The MISO grid is pulling 71.5 GW right now (EIA-930, 2026-09-27 04:00). If every announced campus on this grid energized fully, their combined 11.49 GW would be 16.1% of the grid's current load. Announced numbers are claims, not built capacity; see the methodology.

Campuses on this grid

See every campus on the national data center map, browse the full campus index, or read the verified-vs-claimed methodology.