The story of Meta Lebanon LEAP Campus (Project Domino)inherited from campus Meta Lebanon Data Center (LEAP District)
Announced capex
$10B
Jobs
300 permanent reported
Derived
Cost per MW
$10M/MW
Cost per job
$33M per permanent job

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterIndiana(86)

The deal

Inherited from campus Meta Lebanon Data Center (LEAP District).

utility
Boone County REMC · serving co-op; Meta pays full energy cost per announcement

Investment, workforce and specs

Inherited from campus Meta Lebanon Data Center (LEAP District).

Capex
$10B source
Construction jobs
4,000 source
Permanent jobs
300 source

Power

Inherited from campus Meta Lebanon Data Center (LEAP District). Live grid demand and drought overlay only render on the campus page.

Power source
grid
Grid operator
MISO
Interconnection

Facility record

under construction

Status

hyperscale

Type

Lebanon

Location

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • record: Meta Lebanon LEAP Campus (Project Domino) (reported) · source
  • status: under construction; $10B, 1,500-acre 15-building campus in LEAP District, ground broke early 2026 (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Sep 2026
    Current: under construction

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Meta Lebanon LEAP Campus (Project Domino)?
Meta Lebanon LEAP Campus (Project Domino) is a data center facility record on the DEPLOY registry, in Lebanon. Every fact on the record is individually sourced and dated.
Who operates Meta Lebanon LEAP Campus (Project Domino)?
Meta Platforms operates Meta Lebanon LEAP Campus (Project Domino), per the sourced record on the DEPLOY registry.
Is Meta Lebanon LEAP Campus (Project Domino) operating?
Meta Lebanon LEAP Campus (Project Domino) is recorded as under construction on the DEPLOY registry. Each figure traces to a source.
How verified is the data on Meta Lebanon LEAP Campus (Project Domino)?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Meta Lebanon LEAP Campus (Project Domino) on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). Meta Lebanon LEAP Campus (Project Domino): data center facility record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/facilities/meta-lebanon-leap-domino-in

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces