Data center campus
Crusoe Tulsa AI Factory
Crusoe Tulsa AI Factory is a tracked AI data center campus in Oklahoma, Tulsa County. Retrofit-style AI datacenter used for early GPU cloud capacity before Abilene came online.
Energized · Crusoe · Tulsa, Tulsa County, Oklahoma, United States
Capacity: announced vs energized
| Source |
|---|
Key facts
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- IT capacity (reported)
- 15 MW first phase; retrofit of an existing Tulsa facility
On the data center map
Every tracked data center is on this map, centered on Crusoe Tulsa AI Factory. Pan or zoom out to see how close rivals are building.
In clusterTulsa County(12)·Oklahoma(47)
The deal
- developer
- Crusoe
Power
- Power source
- grid
- Interconnection
County water status: Severe drought (D2) in Tulsa County, week of 2026-11-03 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Crusoe Tulsa AI Factory is in Oklahoma, Tulsa County. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Sources
4bda466e-ccd3-4c21-8002-eaae0a91e77e · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Crusoe Tulsa AI Factory?
Who is building Crusoe Tulsa AI Factory?
Is Crusoe Tulsa AI Factory operating yet?
How verified is the data on Crusoe Tulsa AI Factory?
Deploy Watch
Track Crusoe Tulsa AI Factory on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Crusoe Tulsa AI Factory: AI data center campus record. Retrieved November 11, 2026, from https://registry.deploy.report/datacenters/crusoe-tulsa-ai-factory
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/crusoe-tulsa-ai-factory.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/crusoe-tulsa-ai-factory
- Data documentation: /data
- Query this programmatically: Deploy MCP