Data center campus

Core Scientific / CoreWeave Denton HPC Campus

Core Scientific / CoreWeave Denton HPC Campus is a tracked AI data center campus in Texas, Denton. Former Core Scientific bitcoin site being converted/expanded to host CoreWeave GPU HPC under a 12-year lease (two five-year renewal options). Feb 2025 amendment added ~70 MW, bringing full critical IT load at Denton to r

Under construction · Core Scientific · Brownfield · ERCOT · Denton, Texas, United States


Capacity: announced vs energized

Announced
not recorded
Under construction
not recorded
Energized
not recorded
Core Scientific / CoreWeave Denton HPC Campus capacity claims
Source
Contracted0.26 GW2025-02-26verifiedsec filing

Key facts

0 GW

Energized

ERCOT

Grid

1

Facilities tracked

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

Location / conversion
Former Core Scientific bitcoin site at 8171 Jim Christal Road, Denton, TX, converting to CoreWeave GPU hosting
Critical IT (contracted)
Feb 2025 added 70 MW, bringing Denton to about 260 MW for CoreWeave
Contracted revenue (company-claimed)
Expansion adds $1.2B; Core Scientific funds $104M of the added capex.
Campus scale (company-claimed, Apr 2026)
262 MW critical IT, 394 MW grid capacity, eight buildings on about 64 acres.
Operating (company-claimed, Apr 2026)
Buildings D-G (about 132 MW) operating and billing; rest due H2 2026.
City lease
Denton approved amendments raising leased land to about 78 acres and power access to 394 MW
Ground lease term
Runs to Dec 31 2035, extendable up to seven years with the PPA

On the data center map

Every tracked data center is on this map, centered on Core Scientific / CoreWeave Denton HPC Campus. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.
The story of Core Scientific / CoreWeave Denton HPC Campus
Announced capex
$104M

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterTexas(611)

The deal

offtaker
CoreWeave, Inc. · Ticker CRWV; 12-year HPC hosting lease, $1.2B expansion value
utility
Denton Municipal Electric · ERCOT
operator
Core Scientific · Ticker CORZ; host/landlord

Power

Power source
grid
Grid operator
ERCOT
Interconnection

Denton Municipal Electric grid supply, 0.26 GW grid interconnect, Under construction. Denton Lease Amendment for additional land and access to power

The Texas (ERCOT) grid demand right now: 50.6 GW (EIA-930, 2026-11-07 05:00).

Why here

Core Scientific / CoreWeave Denton HPC Campus sits on brownfield in Texas, Denton. It connects to the ERCOT grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

Investment, workforce and specs

Capex
$104M source

Facilities at this campus

Timeline

  1. Aug 2026
    party added
    utility: Denton Municipal Electric
  2. Nov 2026
    Current: Under construction

Sources

de9b52ad-720d-4e9d-bbee-7fdc72adc5e2 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Core Scientific / CoreWeave Denton HPC Campus?
Core Scientific / CoreWeave Denton HPC Campus is an AI data center campus tracked on the DEPLOY registry, located in Denton. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Core Scientific / CoreWeave Denton HPC Campus?
Core Scientific is recorded as a party to Core Scientific / CoreWeave Denton HPC Campus on the DEPLOY registry. The full party list, with each role, is on the record.
Is Core Scientific / CoreWeave Denton HPC Campus operating yet?
As of the most recent verification on the DEPLOY registry, Core Scientific / CoreWeave Denton HPC Campus is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Core Scientific / CoreWeave Denton HPC Campus?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Core Scientific / CoreWeave Denton HPC Campus on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Core Scientific / CoreWeave Denton HPC Campus: AI data center campus record. Retrieved November 11, 2026, from https://registry.deploy.report/datacenters/core-scientific-coreweave-denton-texas

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces