Data center campus
Core Scientific / CoreWeave Denton HPC Campus
Core Scientific / CoreWeave Denton HPC Campus is a tracked AI data center campus in Texas, Denton. Former Core Scientific bitcoin site being converted/expanded to host CoreWeave GPU HPC under a 12-year lease (two five-year renewal options). Feb 2025 amendment added ~70 MW, bringing full critical IT load at Denton to r
Under construction · Core Scientific · Brownfield · ERCOT · Denton, Texas, United States
Capacity: announced vs energized
| Source | ||||
|---|---|---|---|---|
| Contracted | 0.26 GW | 2025-02-26 | verified | sec filing |
Key facts
Lifecycle
Energized
Developer
Location
Grid
Land
Facilities tracked
On the data center map
Every tracked data center is on this map, centered on Core Scientific / CoreWeave Denton HPC Campus. Pan or zoom out to see how close rivals are building.
- Announced capex
- $104M
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterTexas(607)
The deal
- offtaker
- CoreWeave, Inc. · Ticker CRWV; 12-year HPC hosting lease, $1.2B expansion value
- utility
- Denton Municipal Electric · ERCOT
- operator
- Core Scientific · Ticker CORZ; host/landlord
Power
- Power source
- grid
- Grid operator
- ERCOT
- Interconnection
Denton Municipal Electric grid supply, 0.26 GW grid interconnect, Under construction. Denton Lease Amendment for additional land and access to power
The Texas (ERCOT) grid demand right now: 71.7 GW (EIA-930, 2026-09-27 18:00).
Why here
Core Scientific / CoreWeave Denton HPC Campus sits on brownfield in Texas, Denton. It connects to the ERCOT grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Investment, workforce and specs
- Capex
- $104M source
Facilities at this campus
- Denton 1crypto hpc
Timeline
- Aug 2026party addedutility: Denton Municipal Electric
- Sep 2026Current: Under construction
Sources
- Core Scientific, Inc. Form 10-K FY2024
- Core Scientific and CoreWeave Announce $1.2 Billion Expansion at Denton, TX Site
de9b52ad-720d-4e9d-bbee-7fdc72adc5e2 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Core Scientific / CoreWeave Denton HPC Campus?
Who is building Core Scientific / CoreWeave Denton HPC Campus?
Is Core Scientific / CoreWeave Denton HPC Campus operating yet?
How verified is the data on Core Scientific / CoreWeave Denton HPC Campus?
Deploy Watch
Track Core Scientific / CoreWeave Denton HPC Campus on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Core Scientific / CoreWeave Denton HPC Campus: AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/core-scientific-coreweave-denton-texas
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/core-scientific-coreweave-denton-texas.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/core-scientific-coreweave-denton-texas
- Data documentation: /data
- Query this programmatically: Deploy MCP